震前的 的英文怎麼說

中文拼音 [zhènqiánde]
震前的 英文
preseismic
  • : Ⅰ動詞1 (震動) quake; shake; shock; vibrate 2 (情緒過分激動) be greatly excited; be deeply ast...
  • : Ⅰ名詞1 (在正面的) front 2 (次序在先的) first; top 3 (過去的; 較早的) ago; before; preceding...
  • : 4次方是 The fourth power of 2 is direction
  1. The "pre-seismic anomalous activity" is a relatively short burst.

    異常活動」是一種比較短暫突發事件。
  2. The classical frequency - domain theory forms a basis of bridge vibration analysis, however such method has some limitations. some literatures show that the time - domain analysis method has advantages for vibration analysis. because of the research on time - domain vibration analysis developed only in recent years and the theory is n ' t perfect enough, it needs to be made further investigation

    經典簡化靜力法存在一定局限性;反應譜法為中、小跨橋梁設計提供了廣泛應用,但對解決大跨度橋梁線性與非線性問題存在明顯不足;時程分析法由於該領域研究起步較晚,目理論和方法還不甚成熟,有待于進一步深入研究。
  3. For many of the tsunamis ' victims who lived close to the quake ' s epicentre, off the north - west tip of indonesia, there would have been little possibility of any advance warning

    對于許多在靠近地印尼西北邊陲居住海嘯倖存者來說,那裡是不可能會有什麼事警告
  4. The pre - seismic and post - seismic stress direction can be statistically determined by a large collection of foreshock and aftershock focal mechanism data while the stress drop can be determined through the source fracture inversion from seismic wave data or crust deformation data

    應力方向可根據大量和餘源機制統計給出;地應力降可通過地波或地殼形變資料源破裂反演研究得到。
  5. “ the fact is that many main shocks do not occur " suddenly " : 10 - 30 % of them are preceded by foreshocks during the week before their occurrence ; some are preceded by year - long pre - activity9 ; some are preceded by increased moment release during the years before them10 - 14, and some are preceded by seismic quiescence15 - 17

    「事實是,許多主並非『突然』發生主10 - 30 %之在發一周有;有有長達一年活動性34 ;有有數年加大瞬間釋放3536373839 ,有則在出現地活動性靜止404142 。
  6. The measurement of earth tilt is an important method of studying earth crust deformation and its earth tide, which means much to geodynamics and the observation of earthquake prognostic

    地傾斜測量是研究地殼形變及其固體潮一種重要手段,它對地球動力學研究和地兆觀測都具有重要意義。
  7. Nasb : " now it shall come about when he sits on the throne of his kingdom, he shall write for himself a copy of this law on a scroll in the presence of the levitical priests

    中本:將來他登了國位,就要從祭司利未人面原本、為自己用一卷錄寫這律法抄本。
  8. Between the infantry and the cavalry the artillery, in a long line of polished, shining cannons quivering on their carriages, crawled slowly by with their heavy, brazen sound, and their peculiar smell from the linstocks, and ranged themselves in their places

    時而可以看見炮隊拉長了距離,一門門擦得閃閃發亮大炮在炮架上顫動著,可以聽見銅件響聲,可以聞見點火桿散發氣味,炮隊在步兵和騎兵之間爬行進,在指定地點拉開距離停下來。
  9. Migration of the seismic activity is found before a big event.

    發現了大活動性遷移。
  10. The realization of batch downloading and conversion program based on odbc for seismic precursory data

    兆數據批量卸出與轉換程序實現
  11. Characteristics of geomagnetic precursory anomalies before the moderately strong earthquake in north china

    華北北部幾次中強地震前的地磁兆特徵
  12. The shape and geometry of inclusion is an important factor which affects the precursory seismicity pattern

    包體形狀和幾何位置是影響強兆地活動圖像形態重要因素。
  13. Agitated activity by certain animals may be a sign of an impending earthquake.

    某些動物煩躁不安可能是地震前的預兆。
  14. These anomalies might be due to the temperature variation of subsurface fluid that caused by transmission of long cycle waves through upper mantle or asthenosphere before the earthquake

    水溫異常出現原因可能是由於地震前的長周期波通過上地幔或軟流層傳播,間接地導致了地下流體溫度發生了微小變化。
  15. The figure of daily mean value in resent year showed : the medium term anomaly with impulse jumps appeared 11 months before the event, and the maximum of anomaly was 84 times of the normal rising rate ; the short term anomaly appeared 4 - 1 month before the event, and the maximum of anomaly was 274 times of normal mean fluctuation ; the imminent anomaly appeared 9 days before the event, and the maximum of anomaly was 2. 5 times of normal mean fluctuation

    年日均值圖顯示,中期異常出現在11個月左右,表現為脈沖式向上突跳及階躍式上升,最大異常量為日均正常上升速率84倍;中短期異常出現在4個月和1個月,最大異常量為正常日均波動值274倍;臨異常出現在震前的第9天,25小時達到最高值,最大異常量為正常日均波動值2 . 5倍。
  16. Analyzing on sequence characteristics, earthquake source, medium rupture characteristics, source conditions, historical seismicity, regional earthquakes and anomaly change of precursor data, etc., we know well regional background of seismic activity before the m ( subscript s ) 6. 1 the earthquake and judge earthquake situation trend after the m ( subscript s ) 6. 1 the earthquake

    摘要通過分析昭蘇6 . 1級地序列特徵、源與介質破裂特性、源環境與歷史地活動類比及區域地兆資料異常變化等,對該震前的區域地活動背景、情趨勢等有了較為細致了解和判定。
  17. Abstract : concepts of probability importance and probability sensitivity of sectional constraints of rc frame structure are put forward and studied in this paper, and their calculation methods are given based on the failure correlation and the achievements on reliability of structural system under minor and strong environment hazard respectively. the conclusions of this paper provide a scientific basis for the disaster - resistant maintenance strategy before and after earthquakes, enhancing the reliability of decision - making for the strengthening of existing structure

    文摘:探討了鋼筋混凝土框架結構截面約束概率重要度及概率靈敏度概念,利用失效相關性及結構體系可靠度方面研究成果,給出了鋼筋混凝土框架結構中各個截面效應約束分別在弱災害和強災害環境下概率靈敏度與概率重要度計算方法,所得結論可以為在役結構在地震前的預防性維修加固決策及后結構維修加固決策提供科學依據,從而提高了在役結構加固決策可靠性
  18. On the above - mentioned basis, the analysis was made entirely for the evolution of short - term patterns of underground water before m55. 0 shocks which took place since 1985 in north china, so the discriminative criteria of anomaly zones and the characteristics of spatial evolution of short - term precursors of underground water level before strong shocks in north china was established

    在此基礎上,對1985年以來華北地區5級以上地震前的地下水位短期圖像演化情況做了全面分析,提取出了判別異常區指標以及地短期異常區演化特徵,並最終建立了華北地區強地下水位短期判別標志。
  19. It is discovered, from the analysis of the seismic reaction of the piled jetties with rubber shock absorption seats, that the use of shock absorption seats will help improve the seismic resistance of piled jetties and the use of shock absorption seats will may reduce the maximum bending moment of the fixed end on a pile head to one third of that before the method for reduction of seismic hazards is adopted

    通過對現有高樁碼頭結構導入減橡膠支座后反應分析發現,減支座導入將有利於提高高樁碼頭能力,使樁上部固定端處最大彎矩減小到未減震前的1 / 3 。
  20. The anomalous seismic activities before four moderately strong earthquakes occurred in the northwestern and southwestern china in recent years are studied by the two methods

    用這兩種方法研究了近年來發生在中國大陸西北和西南地區4次中強地震前的活動異常特徵。
分享友人