露天堆 的英文怎麼說

中文拼音 [lòutiānduī]
露天堆 英文
openpile
  • : 露動詞[口語] (顯露; 表現) reveal; show
  • : Ⅰ動詞(堆積) pile up; heap up; stack Ⅱ名詞1 (堆積成的東西) heap; pile; stack 2 (小山 多用於地...
  • 露天 : in the open; open-air; outdoors
  1. The warehouse building of talfook chong consists of six stories and the multi - service building consists of eight stories, totally occupying nearly 20, 000 square meters. the gross floor area is 52, 000 square meters with extra 3, 000 meters of unsheltered piling area

    綜合樓高八層,共佔地近二萬平方米,總建築面積達五萬二千平方米,外加三千平方米的露天堆場。
  2. This paper carries out research mainly pointing to the problem of jin duicheng molybdenum company outdoor mine " s capital reform. taking the character and existing problem of firm " s capital structure as springboard, the paper points out that carrying out capital reform is necessary under the situation of operational cost keeps a high level and it is difficult to ensure task of production

    本文主要是針對金城鉬業公司礦企業資產重組問題進行研究,論文從企業資產結構的特點及所存在的問題出發,指出在經營成本居高不下、生產任務難以保證的情況下實施資產重組是必然的。
  3. Stability analysis of jinduicheng open - pit mine ' s dump

    礦排土場穩定性分析
  4. The valve should be stored in dry room and should not be piled up in open air

    盲板閥應存放在乾燥的室內,不允許存放或置。
  5. Finally, jinduicheng mo. company open - pit is quoted as an instance for building mine transportation vechile scheduling system model, and according to the model, adopt genetic algorithm to study the optimization of mine transportation vechile scheduling system. a rational project is given to this problem, the paper also analysized the optimial design of mine transortation vechile scheduling, the model offering in this paper, convergence of optimal algorithm and data bank management, and transportation project of minerals and disposals is optimized, which realize the decision of transportation project and data visibilization, and wich improves the science and information process of transportation department management

    最後,論文以金城鉬業公司礦為例建立礦山運輸車輛優化調度模型,結合所建立的礦山車輛優化調度模型,採用遺傳演算法對礦山運輸車輛系統進行優化研究,為其提供合理的體系方案。並對礦山車輛優化調度系統設計進行了詳細分析,提出的礦山車輛優化調度系統,集優化演算法與數據庫管理分析於一體,進行礦巖運輸方案的優化,實現調度方案決策的可視化、運行數據的可視化,促進運輸部門管理的科學化、信息化進程。
  6. Because the ore has been mined for long time, the nature geological environment has been getting worse and worse, such as the baldness of mountain body, the rock is weathered to pieces, a lot of loose material distributing along the gully and its banks, the disaster of debris flow is seriowsly, and the production of the mine is constrained by debris flow disaster ; for example, a debris flow broke out on august 1999 and resulted in catastrophic hazards to the jingtieshan iron mine, resulted in a huge economic losses of 50 million yuan

    鏡鐵山礦是酒鋼最主要的鐵礦石生產基地,礦區山高溝深,地質構造復雜,自然地質環境較差,在長期人為開采活動的影響下,地質自然環境進一步惡化,山體裸,巖層破碎,大量鬆散固體物質積在溝道及溝道兩側,泥石流災害十分嚴重,嚴重製約了礦山的生產與發展。 1999年8月礦區黑溝南溝暴發生了嚴重的泥石流災害,致使礦山停產10多,造成5000多萬元的經濟損失。
  7. The studies show that the discharge of liquid manure and the run - off loss of solid manure deposited in the open air are the main environment problems in livestock production

    研究表明,牲畜養殖中液體糞水的排放和露天堆放固體糞便的淋失易造成環境問題。
  8. Aecording to truck transportation in jinduicheng molybdenum company, the paper provides a new approach to determine the truck capacity. its statistics analysis proves that the approach is rasonable

    以金礦為便,給出了計算汽車運輸能力的新方法,並從數理統計的角度對其進行了分析,從而驗證了核計算方法的合理性。
  9. Abstract : aecording to truck transportation in jinduicheng molybdenum company, the paper provides a new approach to determine the truck capacity. its statistics analysis proves that the approach is rasonable

    文摘:以金礦為便,給出了計算汽車運輸能力的新方法,並從數理統計的角度對其進行了分析,從而驗證了核計算方法的合理性。
  10. Aiming at various problems that exist management system of ore blending in open - pit and actual production in sandaozhuang open - pit, this thesis brings forth the ore blending ' s method making use of the linear program and gets a total the strategy to the ore blending. this thesis, in specific operation, adopts a simplification model with ore blending. the primitive data of ore blending direct come from measuring

    本論文針對目前礦配礦管理系統中存在的各類問題以及三道莊礦的生產實際,提出了先採用線性規劃配礦原理配礦,得到一個總體配礦策略,然後再採用一個簡化配礦模型來處理,其中配礦原始數據直接從爆測量中獲取,保證了數據的準確性和快捷性。
  11. Observation and analysis of blasting vibration on the north high slope of jinduicheng open pit mine

    礦北幫振動觀測與分析
  12. The software package has been applied in design and production management in jinduicheng mo. company

    該軟體包已成功地應用於金城鉬業公司礦的開采設計和生產管理中。
  13. The optimal furrow pit direction and the optimal slope configuration fit to the little north open mining was obtained

    優化設計所取得的邊坡形狀為金礦最大限度的減少廢石剝離量,指導采區安全生產提供了幫助。
  14. Abstract : on the basis of comprehensive control of north slope in jinduicheng open - pit mine, some technical measures and results were analysed and summarized

    文摘:根據金礦北幫邊坡綜合治理的實踐,相關的技術措施及效果分析進行了總結。
  15. Based on the analysis method of elasticity mechanics and numerical simulation calculation, a reasonable spatial slope shape of jinduicheng deep furrow pit was established

    摘要為得到金城鉬業公司小北礦深凹邊坡的合理空間形狀,利用彈性力學的基本知識及數值模擬方法進行了研究。
  16. Basic facilities container yard

    基礎設施露天堆
  17. Add lubricant to transmission part when valve is long stored. it should not be placed or piled up in the open air

    若長期存放應使設備處于關閉狀態,各傳動部位應加潤滑油,不允許存放或置。
  18. The device should be in the shut - down if the valve - board is placed longer. driving parts should add lubricated oil. placing in the open air and piling up is not permitted

    若長期存放應使設備處于關閉狀態,各傳動部位應加潤滑油,不允許存放或置。
  19. The stockpile of opencast coal mine is a kind of huge artificial loose dump, which has the problems of serious soil erosion and instability

    大型煤礦排土場是一種巨型人工鬆散積體,存在著嚴重的水土流失和排土場穩定問題。
  20. Abstract : on the basis of state of production in small north open pit of jinduicheng molybdenum mine, the urgency of expansion - wall mining in south open pit was discussed. the feasibility of boundary expansion and periodic expansion in south open pit was analysed

    文摘:根據金城鉬礦小北的生產現狀,論述了南擴幫過渡的迫切性,同時分析了南全境界擴幫和分期擴幫的可行性。
分享友人