露天工地 的英文怎麼說

中文拼音 [lòutiāngōngde]
露天工地 英文
open working area
  • : 露動詞[口語] (顯露; 表現) reveal; show
  • : Ⅰ名詞1 (工人和工人階級) worker; workman; the working class 2 (工作; 生產勞動) work; labour 3 ...
  • 露天 : in the open; open-air; outdoors
  1. Abstract : considering the stochastic characteristic of main hydrogeologic parameters in yuanbaoshan open coal pit, a groundwater stochastic management model for optimal drainage borehole design is established. the result of the modeling shows the effect of stochastic characteristics of hydrogeologic parameters on the result of management modeling. it was found that the higher the parameters uncertainty and the management reliability level, the worse the management result

    文摘:從影響元寶山下水疏乾的主要水文質參數隨機性特徵分析入手,建立並求解了元寶山礦疏干程優化設計的隨機下水管理模型,揭示了水文質參數隨機性對管理模型結果的影響,認為參數的隨機性越大,管理結果越壞;置信水平越高,管理結果越壞,且滲透系數和邊界條件對管理結果影響最大。
  2. Noise and vibration control on construction and open sites - code of practice applicable to surface coal extraction by opencast methods

    建築露天工地噪聲和振動控制.第3部分:開采表煤慣例指南
  3. In order to make the best use of explosive energy in loosing soil or throwing it onto some area and ensuring the bottom meet some leveling requirements after blasting, a plane charge layout is often adopted according to blasting design and engineering quality requirements in open chamber blasting such as mine exploitation, field leveling and foundation pit excavation of construction

    摘要在礦山剝離、場平整以及建(構)築物基坑開挖等爆破中,為了充分利用炸藥能量將巖石松動或拋擲到一定區域,並確保底板滿足一定平整度要求,按照爆破技術設計和程質量要求,需要設計平面布藥結構。
  4. The theory of landscape ecology about drastic disturbance of landforms has been richened. a practical way could be found to identify the final direction of artificial ecosystem succession. moreover, the results can be applied into study the land reclamation and ecological rehabilitation of the developed opencast mines and developing ones in loess plateau

    本研究結果的學科價值:豐富了極端生境下劇烈擾動貌的景觀生態學理論,為確定人正確誘導下的礦區生態演替方向提供了可借鑒的方法和途徑;應用價值主要體現:研究結果適宜於我國黃土高原正在開采和將要開採的大型煤礦的土復墾與生態重建。
  5. Discussion on problems in construction during conversion from open cast to underground mining of shirengou iron mine

    石人溝鐵礦下開采施中的問題探討
  6. Areas covered by such plans are zoned for such uses as residential, commercial, industrial, open space, government, institution or community uses, green belt, conservation areas, comprehensive development areas, village type development, open storage or other specified purposes

    這類圖則所涵蓋的區,一般劃為住宅商業業休憩用政府機構或社區用途綠化帶自然保育區綜合發展區鄉村式發展貯物或其他指定用途等帶。
  7. Open burning is prohibited

    內禁止焚燒任何雜物。
  8. Those site staff who frequently exposed to work above 35 c or exposed to work outdoors are entitled to enjoy grade a standard. others are entitled to enjoy grade b standard

    主要作在作業及經常在攝氏三十五度以上點作業的現場人享受甲級標準。其他人員享受乙級標準。
  9. Noise and vibration control on construction and open sites - code of practice for noise and vibration control applicable to piling operations

    建築噪聲控制.第4部分:打樁作業噪聲和振動控制慣例
  10. Noise and vibration control on construction and open sites - code of practice for basic information and procedures for noise and vibration control

    建築噪聲和振動控制.第1部分:噪聲和振動控制基本信息和程序慣例
  11. Noise and vibration control on construction and open sites - guide to noise and vibration control legislation for construction and demolition including road construction and maintenance

    建築的噪聲和振動控制.第2部分:施和拆除
  12. It also promoted improvements to the infrastructure in areas zoned for open storage related uses and co - ordinated government departmental actions in the prevention and control of illegal dumping of waste throughout the hksar

    該組並在規劃作存貨有關用途的區致力改善基礎設施,以及統籌有關政府部門進行預防及管制非法棄置廢物的作。
  13. On the basis of the analysis on the yangtze vole ' s disaster history and condition in dongting lake area, the influence of the lake beach ' s environmental evolution on the vole disaster is studicd in this paper. the rise of low - middle - level beach area causes the vole ' s population explosion, the reduction of high - level beach area forces the voles into the farmland during the flood season, and the emergence period ' s continual increase extends the vole ' s habitat areas and forces them to migrate into the farmland. the discarded dike provides a rest place halfway for the voles, which escape the flood, and the natural enemies of the voles, which are a natural barrier against the vole ' s population expansion, decreases. according to this study, the conclusions are put for ward as follows : after three - gorge project ' s construction it will produce great influences on the beach evolution in dongting lake area, leading to the changes of the vole ' s ecological environment situation and resulting in the vole ' s population changes which deserves attention

    在分析洞庭湖區東方田鼠暴發成災史及災情的基礎上,研究了洞庭湖區洲灘演變對東方田鼠暴發成災的影響.研究認為,中低位洲灘出面積不斷增大使東方田鼠種群迅速膨脹,高位洲灘出面積減小造成汛期東方田鼠大量向垸內農田遷移;湖區洲灘冬春季連續出數增加延長了東方田鼠的繁殖期;汛期洪峰水位增高,洲灘大面積淹沒迫使東方田鼠大量遷向垸內;湖內廢棄湖堤為東方田鼠逃避洪水提供了中途休養之;洲灘抑制東方田鼠種群膨脹的敵數量已大大減少.據此,本文指出,三峽程建成后將對洞庭湖區洲灘演變產生重大影響,因而將改變東方田鼠種群生態環境條件,引起種群動態變化,值得注意
  14. Noise and vibration control on construction and open sites - code of practice applicable to surface mineral extraction except coal sites

    建築露天工地噪聲和振動控制.第5部分:表層礦石開采點
  15. Strong, can work at outdoor job site, can travel frequently

    身體強壯、能在露天工地作、能適應經常出差。
  16. Aiming at the coal under the building, rail and water, difficultly - mined coal and the side of strip mine, hardly mined, but it is utilization for the ucg study on field test of air coal gas, water coal gas, rich oxygen coal on the side of strip the side of strip mine mine of fu xin, using the ucg for the mineral well, getting the method for building stove of ucg, obtain different coal gas group and heat value for the different gasification craft high volatile, multiple thin coal seams on the side of strip mine are suitable to underground coal gasification to produce middle low heat value gas

    摘要針對「三下」煤層,難採煤層,復雜煤層以及邊坡剩餘的煤炭資源,並開采不經濟或難以開采,可利用煤炭下氣化將這些殘余資源得以回收利用,試驗利用礦井式煤炭下氣化方式,對阜新礦邊坡進行了空氣煤氣、水煤氣、富氧煤氣的業性試驗研究,通過煤炭下氣化業性試驗,得出在邊坡礦井式氣化建爐方式,不同氣化藝的煤氣組分,熱值。
  17. The task force ( black spots ) ( tfb ) was set up in 1994 to clean up environmental black spots resulting from open storage and industrial undertakings in the new territories which have been in existence since 1991

    清理環境專責組在一九九四年成立,負責清理自一九九一年開始已在新界存在的環境黑點。這些黑點是由於有部分新界土改作貨倉及業用途所致。
  18. Development of drilling equipment and tools used in open pit and underground mines

    下礦用鑿巖設備和具的發展
  19. There will be upgraded hard and soft landscaping, foreshore improvements, redesigned street lighting, creation of open spaces for leisure purposes, outdoor activities and performances, provision of an alfresco dining area, installation of lighting and audio equipment for staging performances and outdoor activities in the piazza outside the hong kong cultural centre, etc. works will start in august 2004 for completion in 2006

    主要程包括興建園景建築和栽種花木、改善前濱、重新設計街道照明,以及把部分空闢作休憩公園、戶外表演活動場茶座,裝置供戶外表演及活動用的燈光及聲效設施等。改善程將於二零零四年八月展開,二零零六年完成。
  20. The acticle passes the actual working experience of drilling bole explore for open coal mine engineering geology explain simbly a few problems of the dumping site leave thing layer meet with drilling hole explore, probe detailed the treatise and the technique meathod to. solve these problems

    摘要通過對煤礦排土場質鉆孔勘探的實際作經驗,簡要闡明了煤礦排土場排棄物層在鉆探過程中經常遇到的幾個問題,詳細論述了解決問題所應採取的技術方法與措施。
分享友人