  1. Abstract : considering the stochastic characteristic of main hydrogeologic parameters in yuanbaoshan open coal pit, a groundwater stochastic management model for optimal drainage borehole design is established. the result of the modeling shows the effect of stochastic characteristics of hydrogeologic parameters on the result of management modeling. it was found that the higher the parameters uncertainty and the management reliability level, the worse the management result

    文摘:從影響元寶山地下水疏乾的主要水文地質參數隨機性特徵分析入手,建立並求解了元寶山疏干程優化設計的隨機地下水管理模型,揭示了水文地質參數隨機性對管理模型結果的影響,認為參數的隨機性越大,管理結果越壞;置信水平越高,管理結果越壞,且滲透系數和邊界條件對管理結果影響最大。
  2. Code for construction and acceptance of open pit coal - mine engingeering

    程施及驗收規范
  3. Abstract : based on the study on the deformation of largescale toppling rock mass in fushun west open pit, this paper research the features of deformation and failure of the soft rock slope controlled by weak intercalated beds, and its influence on urban industry establishment

    文摘:以撫順西大規模傾倒滑移變形體變形規律研究為例,探討受軟弱夾層控制的軟巖邊坡變形破壞規律及其變形破壞對城市業設施的影響。
  4. Application and discussion on the tailing discarding technology of powder ore

    排土場的逆排
  5. Industrial test method of open - cut mine rotary blast hole drill

    用牙輪鉆機和旋轉鉆機業試驗方法
  6. Parameters setting and optimization of the crushing transfer station of semi - continuous technology of open - pit mines

    半連續藝破碎轉載站參數設置及優化
  7. Implementation of open - pit high - bench deephole blasting

    高臺階深孔爆破施改進實例
  8. The automatic metering system for 33 - 07 trucks can accurately make automatic metering and recording of mine - used truck hauling data such as run number, load, time etc. under various complicate and deteriorative operational environment conditions so as to realize the automation and computerization of the metering of mine - used truck hauling and meet the requirements of the truck hauling management in open - pit mine operation. as a result, it is of high popularization value

    07汽車自動計量系統能夠在用載重汽車各種復雜、惡劣的作業環境條件下對汽車運輸作業的車次、載重量、時間等數據進行準確自動計量和記錄,實現了用載重汽車運輸作業計量的自動化和計算機化,滿足了山生產汽車運輸管理作的需要,具有較高的推廣應用價值。
  9. Abstract : in this paper, the characteristics of production system have been analyzed and the production economic functions have been set up in mine. the matrix of two - dimension alternately action is analyzed for mining process and factor in open - pit mine. it is made algorithm for matrix of two - dimension alternately action. under the conditions of binding, mine system is optimum running by optimal program, optimal coordination and optimal control

    文摘:分析了山生產系統的特點,建立了山生產經濟函數,對生產藝、生產因素進行了二元交互作用矩陣分析,提出了求解二元交互作用矩陣的演算法,通過最優計劃、最優協調、最優控制使山生產系統在一定約束條件下最佳運轉。
  10. The paper analyzes present state, existing problem and situation to be faced in the mine, and puts forward development direction in mining technique in the light of mining technique situation at home and abroad

    分析了雲浮硫鐵企業集團公司生產現狀、存在的問題和面臨的形勢,結合國內外山的采藝現狀,提出了在采技術方面的發展方向。
  11. It offeres the new method and way in order to analyse and study the question on open - pit slope project

    為分析和研究邊坡程問題提供了新的方法和途徑。
  12. Erection of electrical installation in open - cast mines, quarries and similar works

    山採石場和類似作區區域的電氣設備的安裝
  13. Optimization on mining techniques for enlarged project of huolinhe no. 1 open pit mine

    霍林河一號擴建程開采藝的優化
  14. The artificial neural network model which forecasts open mining slope stability is established by neural network theory and method. the article describes the nonlinear reflection relation between stability target of open mining slope and its influence factor. the article brings forward the method of forecasting open mining slope stability

    利用人智慧中的神經網路原理和方法,建立了順層邊坡穩定狀態預測的神經網路模型,描述了山邊坡穩定指標與其影響因素的非線性映射關系,提出了邊坡穩定性預測的神經網路原理和方法。
  15. Effect evaluation of distortion for north project of side slope in fushun west open cast

    撫順西北幫邊坡治理程效果初步評價
  16. Study and optimization of working slope angle of open - pit mine

    關于露天礦工作幫坡角的研究與優化
  17. Aiming at the extension of mineral mines scale and increase of the goods transportation, the contradiction between the construction of foundation facilities in mine area or the city with disaster of highway subsidence caused by underground mining and open pit mining is getting more and more outstanding

    摘要針對資源城市產開采規模的擴大和交通貨物運輸量的日益增長,使得井區基礎運輸設施建設以及與之緊鄰的城市交通建設和開采引起的公路沉陷災害的矛盾越來越突出。
  18. Review of total truck lifting transportation technology for open - pit use trucks

    用汽車整車提升運輸藝綜述
  19. An analytical comparison is made between the methods for determining the rational production capacity of open - pit mines and both static and dynamic methods are presented. system engineering theory and method are used to develop a software for analyzing the production capacity of chinas open - pit mines

    合理生產能力確定方法進行了分析比較,介紹了靜態法、動態法生產能力確定方法,運用系統程理論和方法,開發了我國生產能力分析軟體。
  20. Research on extended mining program and mining technique for yimin open pit mine

    伊敏擴建開采程序和開采藝研究