露鉆孔 的英文怎麼說
中文拼音 [lòuzhēnkǒng]
露鉆孔
英文
e exposed drill holes will not close-
But these were uncased auger-drilled poured pilings, with the grout in direct contact with the native materials.
不過這些都是露出地面經鉆孔繞灌而成的樁,灰漿同天然材料直接接觸。Kongxi buried hill shows following features in the seismic profiles : the structures are asymmetric. there is flexural syncline on the east side and a monocline on the west side. asymmetric repetition of stratigraphic units is present in the drill wells and the dips of beds and faults are gentle. the permo - carboniferous system of both sides almost lie in the same slope and the events of cambrian or upper proterozoic are continuous from east to west. the phenomenas suggest that kongxi buried hill could be a thrust belt been traced which consists of reverse faults. the imbricate faults mainly effect pre - jurassic strata. there are obvious angular unconformity between jurassic - cretaceous system and paleozoic involved deformation of thrust. the thrust front in some place has cut off the beds of jurassic - cretaceous system. the structural style of the thrust structure changes along the strike of the kongxi buried hill
地震和鉆井資料揭露的孔西構造帶前第三系潛山的地質特徵可以歸納為:構造帶總體上不對稱構造帶內部有地層重復現象石炭二疊系地層的位置明顯高於兩側的同一地層的高度。用由34條向東傾斜的逆沖斷層組成的疊瓦扇構造模式能夠比較合理地解釋上述地質特徵。該帶向東傾斜的逆沖疊瓦狀斷層組主要影響前侏羅系地層,侏羅白堊系與捲入逆沖構造變形的古生界地層之間有明顯的角度不整合。Improving measures for the drilling of solidified grout hole with ingersoll - rand lm - 500c hydraulic drill rig
露天液壓鉆機鉆鑿固結灌漿孔的改進措施Application of pneumatic - hydraulic crawler drill in drilling open - pit blast hole
氣液聯動鑿巖鉆車應用於露天爆破穿孔Someone think it must use permeating theory to design, the others think it must use permeating theory to design. the building ministry made out the working standard of the later pressure grouting of pour pile, but it stand at the industry standard, is n ' t enough perfect and comprehensive. in this paper, the author put forward the design principle by analyzing the reasons that affect the bear load ability of the drilling hole pour pile and the principle that improve the bear load ability of single pile by later pressure grouting, put forward th e working technology and requirement of check before acceptance by analyzing and summarizing several models such as the chinese railway 11 office residential high building
本文通過分析影響鉆孔灌注樁承載力的因素以及鉆孔灌注樁后壓漿提高單樁承載力的機理提出了設計計算的原則;通過中鐵十一局高層住宅樓鉆孔灌注樁低壓力后壓漿工程對6根樁的壓漿對比試驗及鉆探揭露確定了低壓力后壓漿所適用設計理論和方法;確定了低壓力后壓漿的壓漿壓力、壓漿量等參數;經過實驗及經驗總結確定了壓漿材料的選取原則及方法,列出了低壓力后壓漿在不同土層適用的壓漿材料。Open - pit crawler type downhole drills
履帶式露天潛孔鉆車The acticle passes the actual working experience of drilling bole explore for open coal mine engineering geology explain simbly a few problems of the dumping site leave thing layer meet with drilling hole explore, probe detailed the treatise and the technique meathod to. solve these problems
摘要通過對露天煤礦排土場工程地質鉆孔勘探的實際工作經驗,簡要闡明了露天煤礦排土場排棄物層在鉆探過程中經常遇到的幾個問題,詳細論述了解決問題所應採取的技術方法與措施。分享友人