靜力計算 的英文怎麼說

中文拼音 [jìngsuàn]
靜力計算 英文
static calculation
  • : Ⅰ形容詞1. (安定不動; 平靜) still; calm; motionless 2. (沒有聲響; 清靜) silent; quiet Ⅱ名詞(姓氏) a surname
  • : Ⅰ名1 (力量; 能力) power; strength; ability; capacity 2 [物理學] (改變物體運動狀態的作用) forc...
  • : Ⅰ動詞1 (計算) count; compute; calculate; number 2 (設想; 打算) plan; plot Ⅱ名詞1 (測量或計算...
  • : Ⅰ動詞1 (計算數目) calculate; reckon; compute; figure 2 (計算進去) include; count 3 (謀劃;計...
  • 計算 : 1 (求得未知數) count; compute; calculate; reckon; enumerate 2 (考慮; 籌劃) consideration; pla...
  1. Different equations to corresponding components are presented by analysing and transformating the general equations of fluid routes, then static characteristics mathematical model of liquid propellant space propulsion system is presented. based on the data of static characteristics calculation, mass model of thruster, propellant, propellant tank, gas, gas bottle, pipe and valve is presented using both the method of statistical regression and the method of stress analysis, then corresponding mass model is presented. based on the characteristics of liquid propellant space propulsion systems, analyse the five phases ( concept and definition, design and improvement, manufactureing and arrangement, operation and ma intenance, disposal ) in which life cycle cost of liquid propellant space propulsion systems is cost separately, then discompsed structure of life cycle cost and model of life cycle cost are presented

    將組件分成氣路組件和液路組件,再對氣路組件和液路組件進行相應的分類,然後通過對通用流路方程進行分析和變換對不同類型的組件分別建立不同的方程,從而建立了一個適用於液體推進劑空間推進系統的態數學模型;根據所得到的數據,應用統回歸法和應分析法分別建立推室、推進劑、推進劑貯箱、氣體、氣瓶以及導管和活門等的質量模型,從而建立相應的質量模型;結合液體推進劑空間推進系統特點,對液體推進劑空間推進系統全壽命周期費用發生的五個階段(概念和定義、設和改進、製造和安裝、運行和維修、處理)分別進行分析,建立了液體推進劑空間推進系統全壽命周期費用分解結構和全壽命周期費用模型。
  2. Inner force on strengthening concrete statically indeterminate beams prestressed with localized tendons

    局部張拉預應筋加固混凝土超定梁的內
  3. The subject of this thesis is to study ironless moving coil linear permanent magnet synchronous motor and the major works in this thesis are summarized as follows : 1 ) two analytical formulas are derived by concentrated current method and distributed current method to determine the magnetic field due to pm, based on the current model of pm. besides, two method ( magnetic charge method and solution by laplace equation method ) are also introduced with comparing their advantages and disadvantages. then the effects of the motor parameters on the flux distribution are discussed

    本文對空芯動圈式直線同步電動機進行了深入細致的研究,內容包括: ( 1 )採用電流模型推導出兩種永磁磁極二維氣隙磁場的解析公式(集中電流法、分佈電流法) ,同時介紹了兩種永磁電機氣隙磁場方法(磁荷法,直接求解拉氏方程法) ,分析各種方法的優缺點,討論電機參數對氣隙磁密的影響; ( 2 )介紹了單層同心繞組的布置方式,根據安培定律推導出空芯動圈式直線永磁同步電動機的公式,分析?位移特性; ( 3 )建立空芯動圈式直線永磁同步電動機動態模擬模型,模擬不同驅動方式下電動機起動、穩態運行時電磁、速度、位移的變化情況。
  4. Then, a thorough discussion and sum ? p about the main construction process of cfst tied ? rch bridge without wind bracing is presented in the paper in association with the construction practice of the bridge. in addition, the author put emphasis on the static calculation of two point integral hoisting construction method in single cfst arch rib. futhermore, the stabilization of arch rib in construction and service stage are analyzed detailedly

    本文結合該大橋的施工實踐,對無風撐鋼管混凝土系桿拱橋的主要工藝施工流程進行了全面論述和總結,並重點對單片鋼管拱肋兩點整體吊裝的結構受進行了靜力計算及對拱肋在施工和運營階段的穩定進行了分析。
  5. ( 2 ) respectively by elastic theory analyses and methods of structural mechanics, transverse static analytical equations for flexible pipeline rigid pipeline are established whose outcomes are applied in numerical example to compare those with that by finite element method. ( 3 ) considering interaction of filled soil, pipeline and foundation, with an eye to non - linear soil model, in view of the initial geo - stress field and the effects of interface between soil and pipeline, and by finite element method the calculational model and method are built for transverse stress in pipeline. then, by the great finite element analytical software ansys, those outcomes are applied in calculation example of positive buried pipe to educe the distribution of circumjacent soil pressure and stresses on cross section and to compare it with that calculated by conventional ways before those outcomes are applied in engineering case of positive buried pipe with flexible filled materials to confirm distribution of soil pressures after the measure for reduction and to compare it with measurements. as a result, the model set up in this paper is proved to be applicable after all above - mentioned analyses

    本文基於彈性理論和有限元原理與方法,分析了上埋式地下管道橫向方法和性狀並探討了上埋式地下管道的減荷等問題: ( 1 )在分析現有幾種典型的管道垂直土壓方法的基礎上,探討了影響垂直土壓的主要因素以及改進的方法; ( 2 )分別通過彈性理論分析法和結構學的方法,建立了地下管道柔性圓環和剛性管涵的橫向靜力計算方程,並應用在例中,把所得結果和有限元方法所得結果進行對比分析; ( 3 )考慮填土、管道和基礎的共同作用、土體的非線性特性、初始應場以及土體和管道的接觸面因素的影響,利用有限元的思路,建立了地下管道橫向學有限元模型和方法,並且採用大型有限元分析軟體ansys ,針對上埋式管道工程例,得出了管周土壓以及管道橫截面應的分佈狀況和規律,並和理論值進行對比;針對施加柔性填料的上埋式管道工程實例,得出了減荷后的土壓分佈,並和實測值進行了對比。
  6. The static and dynamic 3 - d finite element analysis for the intake tower shown that the stability and stress of the stucture satisfy the specification

    對進水塔結構進行、動研究結果表明,其穩定、應均滿足要求。
  7. Furthermore, the test filters in the paper are of triangle arrange structure which are different from the niexueli ' s. meanwhile the experiment has enriched test types and conditions of this multi - tube hepa filter and deducted the resistance of the system elbow more correctly, so can get more reasonable resistance formulae which establishes the foundation for the further economic optimization

    本文實驗在聶雪麗研究基礎上改用結構阻更小的叉排結構,並豐富了試驗規格和實測工況,同時更準確地扣除了系統彎頭壓箱的阻,從而得出了多管式高效過濾器的實用阻公式,為進一步進行經濟性優化奠定了基礎。
  8. In this paper, based on the static - load tests of tension piles in soft ground lying on the province of zhejiang such as zhongshan garden, gongchen bridge canal piazza, etc, the calculations of ascending displacement, developing mechanism of the side friction and utmost bearing capacity of the tension piles are studied

    本文以中山花園、拱宸橋運河廣場等浙江軟土地區抗拔樁載試驗為背景,對抗拔樁抗拔承載、上拔量、抗拔樁側阻發展機理進行了分析研究。
  9. The choice dam type is especial importance, during the designed research of the rock - fill dam, particular under the rock - fill dam with very deeply cover layer, the stress and strain of the middle wall and cutting interpenetration wall of the dam foundation is mostly sensitive, whether the. design of dam is scientific and reasonable, it is very important for cutting interpenetration and stability of the dam, the article offer the reference for the design of cutting interpenetration in the foundation with deep cover with earth the water conservancy in xiaban zone, based on the study and analysis the design of cutting seep in the foundation with deep cover with earth, cutting interpenetration concrete wall and the joining model of cutting interpenetration material in body of dam and the applying effect in the practical worko based on the foundation which absorbed and summarize the achievement of design and research in the inter and outer country, for the project of the clay vertical middle wall and vertical cutting interpenetration, the asphalt concrete vertical middle wall and vertical cutting interpenetration the clay inclined middle wall and the lever carpet layer cutting interpenetration, respectively in terms of the different stage of complete period sluice period and working condition, adopting nonlinear calculate and analysis with the finite element method ; carrying the analysis and study with the 3d finite element method as to the different joining model of the left bank high slope cutting interpenetration body and the foundation concert cutting interpenetration wall ; carrying the analysis and study with the 3d finite element method as to the effect of the wall stress and strain because of the different elasticity modulus of the concert cutting interpenetration wall through the analysis and study with the different project. have comparatively all - around comprehended the various model dam, particular the distribute rule of stress and strain of the cutting interpenetration system, provide for the important evidence of the plastic area size the join model of the foundation cutting interpenetrate wall and dam body cutting interpenetrate system the choice of the dam model and the design of the structure of the dam body, the result of research and advice have very importance value in design and building for the similarity project

    工程設中,壩型的選取顯得尤為重要,特別對于壩基有深厚覆蓋層的堆石壩,心墻和壩基防滲墻的應和變形是壩體、壩基最敏感的部位,設方案是否安全、科學和合理,對大壩防滲和穩定起到至觀重要的作用。本文研究分析了國內外深厚覆蓋層基礎防滲設、壩基混凝土防滲墻與壩體防滲體銜接形式及工程實際應用效果,為下坂地水利樞紐工程深厚覆蓋層基礎防滲設的方案選擇提供了參考;在吸收和歸納了國內外堆石壩的設研究成果的基礎上,對粘土心墻和壩基垂直防滲方案、瀝青混凝土心墻和壩基垂直防滲方案以及粘土斜心墻和壩基水平鋪蓋防滲方案,分別按竣工期和蓄水運行期的不同工作情況進行了有限元非線性分析;對左岸高陡邊坡的大壩防滲體與基礎混凝土防滲墻的不同結合型式進行了三維有限元靜力計算分析和研究;對混凝土防滲墻不同彈性模量對墻體應和變位的影響進行了三維有限元靜力計算分析和研究。通過對不同方案的分析和研究,比較全面的了解了各方案壩體,尤其是防滲體的應和變形分佈規律,為壩型選擇、壩體結構設、基礎防滲墻與壩體防滲體的結合型式以及塑性區大小的確定提供了重要依據。
  10. This new erection procedure is compared with the conventional way from the reasonability, convenience and economic aspects. the results obtained from the calculating data state that cantilevering the main girder without tensioning the longitudinal pre - stressed reinforcements is a better way for establishing the cable - stayed bridge

    本文把這種方法與傳統方法在受合理性、施工方便程度和經濟性方面做了比較分析,並結合整體靜力計算說明懸臂澆築斜拉橋主梁時不張拉縱向預應筋這一方法的可取之處。
  11. By use of the fem program, the paper contrasts the differences of static calculation and stability analysis results of tapered portal frame structure analyzed by uniform section beam elements and tapered section beam elements respectively

    利用該程序,比較了分別用等截面梁元和變截面梁元對變截面剛架進行靜力計算與平面內穩定性分析的差異。
  12. At the end of this part, the paper studies how to automatically divide the general wall element into shell elements, according to the theory of substructure

    在結構靜力計算模塊還研究了根據子結構原理實現的通用墻元自動細化成殼元的實現方法和過程。
  13. Optimization design for spatial truss structure of concrete filled steel tube is studied in this dissertation. on the basis of theory of structural optimum design and behavior of poles in structure of concrete filled steel tube, the optimization mode is built, and programming of static calculation for truss structure and optimization algorithm with discrete variables is developed by using language of fortran

    本文針對鋼管混凝土空間桁架結構的優化設問題進行了初步研究,根據鋼管混凝土結構中桿件的受特點,結合優化設理論,建立了鋼管混凝土空間桁架結構的數學模型,運用fortran語言編制了桿系結構靜力計算程序和基於離散變量的優化演法程序。
  14. The tapered beam element is used hi the fem. with the fem. the linear static and in - plane stability analysis of the frames are carried out conveniently

    本文開發了一套變截面梁單元有限元分析程序,可對變截面門式剛架結構體系進行精確的靜力計算與平面內穩定性分析。
  15. By way of research staggered truss system space cooperation work principle, the text has systematically given out the plane structure computational module and the elastic static computational method, and provides a detailed calculation example

    通過對錯列桁架體系空間協同工作原理的研究,首次系統地給出了可以考慮扭轉效應的平面結構模型和彈性靜力計算方法,並提供了過程詳盡的實例。
  16. Firstly, static analysis of slts subjected to design load is done, employing space link series fea, and enduring capacity and internal force distribution of latticed truss structure may be realized to some extent, so primary decision of key inspect regions of roof slts can be run in the thesis

    本文首先以空間桿系有限元法對整個網架結構進行在設荷載作用下的靜力計算分析,對網架結構的承載能和結構的內分佈有一定程度的了解,並可初步確定網架結構監測的關鍵區域。
  17. After studying the former static calculation method of rail joint, a new calculation model of joint is presented in the article

    在與以往接頭靜力計算方法進行比較后,本文提出了一種新的接頭模型。
  18. Raft vibration - isolate simulation system of this paper can provide the functions as follows : 1. it can calculate the natural frequencies, vibration modes, modular state and dynamic response of the unit according to the given structural parameters of the selected raft vibration - isolating unit, the number of vibration isolators and their installation positions. and also, the design effect of the selected scheme can be displayed vividly

    另外,本論文研製的「浮筏隔振裝置減振降噪模擬系統」 ( raftvibration - isolatesimulationsystem , rviss ) ,功能包括: 1 、根據使用者輸入的機組結構參數、減振器的選型參數,可分別進行系統固有頻率及振型、系統模態分析及靜力計算、動響應等,並提供報告;利用三維機技術實時模擬,形象逼真、動態顯示效果。
  19. According to the characteristics of the structure and the loading of large rectangle aqueduct with longitudinal beams, we study the static structure calculation methods and compare the practical space method, the girder method and the solid 3 - d fem

    摘要根據大型多縱梁矩形渡槽槽身結構及其受特點,研究了其結構靜力計算的方法,並對梁格法、三維實體單元有限元法和實用空間分析法進行了對比。
  20. In this paper, a discrete fem model of the whole trolley is established, and the detailed stress and deformation distribution of the whole trolley and its key components under different operational static loads are obtained by fem analysis calculation

    應用大型通用有限元分析軟體對一種型號的模板臺車進行結構靜力計算分析,建立較完善的分析模型,出模板臺車在使用過程中、在不同工況下各部分的應應變數值。
分享友人