靜水運河 的英文怎麼說

中文拼音 [jìngshuǐyùn]
靜水運河 英文
slack water canal
  • : Ⅰ形容詞1. (安定不動; 平靜) still; calm; motionless 2. (沒有聲響; 清靜) silent; quiet Ⅱ名詞(姓氏) a surname
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : Ⅰ動詞1 (物體位置不斷變化) move; revolve 2 (搬運; 運輸) carry; transport 3 (運用) use; wield...
  • : 1 (天然的和人工的大水道) river 2 (指銀河系) the milky way system; the galaxy 3 (特指黃河) t...
  • 運河 : canal
  1. After breakfast, take the private boat to visit the heart of venice, st. mark square, the 950 years old st. mark basilica, see the outer portion of the lavish doges palace with the bridge of sighs finishing off our tour for a visit to the world famous murano glass factory

    早餐后參觀都威尼斯,全市由一百一十六個小島組成縱橫交錯的,和一幢幢古色古香雄偉雅緻的教堂,長年浸在中生青苔的老屋,好幾世紀都地與碧空海為伴。
  2. Reliability assessment of xi - luo - du underground water - power plant : the results have been used by the cheng - du surveying, design and research institute for the preliminary design ; ( 2 ) the stress and strain analysis for the xiao - guan - zi sluice and its foundation : the report has been applied for the reinforcement of the foundation ; ( 3 ) the thermal control procedure for the no. 7 - 14 power plant dam segments of the three gorge project : the research report provides the effective and efficient methods for the controlling of the temperature field in the mass concrete structure ; ( 4 ) the software system development for the long - term monitoring for dikes : the software can automatically give the results of the seepage field and the probability of soil piping of dikes and underground ; ( 5 ) reliability assessment of xiang - jia - ba underground water - power plant : the results have been used by the zhong - nan surveying, design and research institute for the preliminary design ; ( 6 ) fatigue reliability estimation of shipping berthing pillar : the results give the optimized design scheme and prediction of the structural age ; ( 7 ) 3 - d static and dynamic stochastic finite element analysis for the strength, stability and thermal control problem for xi - luo - du project

    溪洛渡電站超大型地下洞室群圍巖穩定的安全可靠性分析:被成都勘測設計研究院應用於比選報告及可行性論證中; ( 2 )小關子電站攔閘壩及地基的應力應變分析:被成都勘測設計研究院應用於地基加固處理方案; ( 3 )三峽廠房7 # - 14 #壩段溫控並縫措施研究:為廠房壩段並縫方案的可行性提供了依據; ( 4 )堤防工程體系的長期監控預報預警決策系統開發:為監控、預測預報堤防滲漏管涌破壞提供分析軟體; ( 5 )向家壩地下洞室群圍巖穩定的安全可靠性分析:被中南勘測設計研究院應用於初步設計方案中; ( 6 )靠船墩的疲勞可靠度研究:為廣東航規劃設計院的靠船墩優化設計和加固提供依據; ( 7 )溪洛渡高拱壩壩體壩基(壩肩)強度和穩定的三維動力隨機有限元分析及可靠度計算:為溪洛渡重大工程壩體的動力安全穩定性及溫控方案提供依據。
  3. Abstract : to improve water quality of a running water plant, headwater of which is the fuyang river in handan city. using bone glue as a coagulant, the static and unstatic experiments are carried out, the optimum bone glue dosage is found out

    文摘:針對邯鄲市滏陽質特點及地表廠的現狀,在不進行大規模的土建改造和大幅度提高行費用的前提下,採用骨膠作為助凝劑,進行態實驗和動態實驗,尋找出骨膠的最佳投量范圍,達到了改善質的目的。
  4. As a result, the studying aim of this paper is to establish a practical and complete system for the prediction of ship maneuvering motion, taking into account of the influence of the environmental factors, such as the wind, wave and current, establish a practical and complete system for the prediction of ship maneuvering motion. in this paper, the opengl virtual reality simulation technique is introduced into the field of ship maneuver and control, and using the mmg mathematical model, the three dimensional dynamic simulation system of the ship motion is established and good results are achieved. in the process of the system development, firstly, the maneuvering motion equations for ship in the still water are established, based on the mmg module mathematical model and serial experimental result

    在系統開發過程中,首先採用mmg分離式數學模型及相關的系列化試驗結果,建立單槳單舵海洋輸船舶在中的船舶操縱動方程,並編制計算程序,經與試驗結果比較,證實了計算結果的正確性;為了解mmg數學模型中模型參數變化對操縱性指數的影響程度,作者在上述已有程序基礎上,對有關模型參數進行偏移修正,探討了相應參數變化后的操縱性指數,對船舶操縱性指數對模型參數的靈敏度進行了詳細的分析與探討,所得結論與工程實際相吻合,具有實際應用價值,並為進一步提高船舶操縱性預報的精度打下了基礎;然後,在已有的船舶操縱動模型基礎上,考慮雙槳雙舵的影響,建立了內雙槳雙舵船舶的操縱動模型;最後,綜合考慮風浪流作用力的影響,進行了船舶的操縱動模擬計算。
  5. The shahe pumped - storage power station with two 50mw reversible units has been in good conditions on general since it was put into operation, but there still were some defects, such as the failure of unit ' s contemporaneous device, the insufficient cooling water discharge and pressure, and the failure of static frequency converter and excitation overcurrent

    摘要沙蓄能電站兩臺50mw可逆式機組自投以來,總體情況良好,但是也出現了一些缺陷,如機組同期裝置故障,機組冷卻流量或壓力不足,止變頻器故障,勵磁過電流故障等。
分享友人