非彈性工資 的英文怎麼說

中文拼音 [fēidànxìnggōng]
非彈性工資 英文
inflexible wage
  • : Ⅰ名詞1 (錯誤) mistake; wrong; errors 2 (指非洲) short for africa 3 (姓氏) a surname Ⅱ動詞1 ...
  • : 彈名詞1. (彈子; 小球形的東西) ball; pellet 2. (內裝爆炸物, 具有破壞和殺傷能力的東西) bullet; bomb
  • : Ⅰ名詞1 (性格) nature; character; disposition 2 (性能; 性質) property; quality 3 (性別) sex ...
  • : Ⅰ名詞1 (工人和工人階級) worker; workman; the working class 2 (工作; 生產勞動) work; labour 3 ...
  • : Ⅰ名詞1 (錢財; 費用) money; wealth; expenses 2 (資質) intelligence; endowment 3 (資格) quali...
  1. According to the documentation collected from domestic and abroad wang wei dong who works in huadong architect and structure institute utilizes the similar work property between the underground continuous wall and pile subjected the vertical loads, and introduces poulos method of elasticity and plastic which applies to pile foundation into the calculation for subsidence of underground continuous wall. pujialiu and yu yuzhou from water and electronic engineering of qinghua university, according to the result of three axes, define the concrete parameter utilize the model of non - linear e - b combined with the design cross section of dam in xiaolangdi, yellow river accept the total stress programme of thepd dam, and we analyze the stress and displacement of plastic concrete diaphragm wall by finite element method in comparison with the result of common concrete one. at same time, we consider the effect of the character of plastic concrete diaphragm wall which is composed of different gradients and adopting the level of stress and pulling stress infers whether the plastic concrete diaphragm wall is safe or not

    地下連續墻是一種歷史較短的施方法,目前,砼防滲墻的設計還是以傳統的設計方法為主,根據查找國內外文獻料,華東建築設計院王衛東利用地下連續墻與樁在豎向荷載作用下的能有相似,將適用於樁基的poulos理論引入對地下連續墻的沉降計算中;清華大學水利水電程系濮家騮、于玉貞根據三軸試驗結果確定混凝土的參數,利用e - b模型,結合黃河小浪底土石壩設計剖面,採用thepd土石壩總應力程序,對深覆蓋層塑混凝土防滲墻的應力、位移進行有限元分析,並與普通混凝土防滲墻計算結果加以對比,同時分析了不同配比塑混凝土特的影響,並採用應力水平和拉應力數值來判斷塑混凝土防滲墻的安全程度。
  2. Form the observation date obtained during construction, the geological parameters may reasonably be determined by direct optimal method such as powell so that it minimizes the squares of differences between calculated and measured quantities ( objective function ). adopting fem and the roadbed settlement after construction is calculated. then a back analysis program of fem for soil is given

    文中首先基於biot固結理論分別採用e - v模型和merchant粘模型兩種模型有限元方法,根據施期實測料,採用直接優化反分析方法,分層分部反演地基土體的計算參數,然後計算路面鋪筑後的后沉降,並對將通過兩個軟土路基程實踐驗證其可靠
  3. Consequencely, the analysis and assessment system of the operating state of the concrete dam was developed under the ansys development environment, and the back - analysis and the prediction of the parameters of the dam system have been done according to the operating observed data. the research work involves several aspects as follows : 1 ) a back - analysis model including the prior information and a predictive model of nonlinear time series were established ; 2 ) the analysis and assessment system of the operating state of the concrete dam was developed under the ansys development environment, in which the analysis module of the loading effects, the back - analysis module, the forecasting module of the physical parameters and the assessment module of the operating state were contained ; 3 ) according to the operating observed data, the operating state of the dam was assessed and predicted with the analysis system of the operating state, the results suggested that the dam is in basically normal operation at present

    具體作有以下幾方面: 1 )收集整理漫灣水電站大壩運行監測料,並對其進行了系統分析,從觀測料本身直觀的分析了大壩的運行狀況; 2 )總結位移反分析的理論及方法,建立了考慮先驗信息多介質位移反分析模型,基於神經網路映射功能,建立了神經網路時間序列預測模型; 3 )以ansys軟體為平臺,開發了漫灣水電站砼重力壩運行狀態評價模塊,結合荷載效應分析、參數反演分析、參數預測分析三個模塊組成漫灣水電站砼重力壩運行狀態分析系統;實現了對漫灣水電站運行狀態的動態「反演-預測」分析; 4 )利用漫灣水電站砼重力壩運行狀態分析系統,在漫灣大壩實測料分析、大壩砼特參數反分析、大壩砼模量衰變規律及預測分析的基礎上,系統的分析並預測了大壩運行狀態。
  4. When the economy fully recovers, repayments can be made. with such an arrangement, the management of tax policy is clearer, and capital investment projects can be arranged flexibly, depending on the non - recurrent revenue. it will be a more predictable and practical way of managing the public accounts, in accordance with article 106 of the basic law

    如此分,稅收的用途,就更為明確,而的投項目,也可以隨著經常的收入的多寡,作更的安排,如此清晰的理財手法,才更合乎實際環境的理財方向,而依照基本法第106條的處理,我相信並無違反第107條量入為出的原則。
  5. Given the number of staff grades involved and the complexity of the present structure, the university has appointed an independent external consultancy, viz. the hay group, to undertake a comprehensive and objective review of the university s remuneration structure for non - academic staff. the purpose of the review is to improve the current situation, with a view to rationalizing and simplifying the existing grading system, so as to develop a competitive, flexible, equitable and optimal remuneration structure which can enhance the hrm of the university while at the same time enable the university to recruit and retain good staff

    考慮到現行架構之復雜及牽涉職級之數目,大學委託了外間獨立顧問公司thehaygroup ,為教學人員之薪酬結構進行全面並客觀之檢討,檢討之目標為改善現時的情況,希望簡化及合理化現行之職級制度,以制訂一套能提升大學人力源管理、並有助大學招聘及保留優秀員,而具競爭力、、持平並恰當的薪酬架構。
  6. In the third engineering case, the author separately adopted duncan - chang model and linear elastic model. compared their results with the measured results, the author found that the duncan - chang model is more suitable to evaluate the settlement of soft ground

    本文第三個實例分別採用了duncan - chang模型和線模型計算,將其計算結果與實測料進行比較,結果證明用模型比較符合程實際。
  7. According to the prior achievements, based on pile deformation test data, it puts forward a method that combined the mindlin ' s solution with boussinesq ' s solution to calculate the superimposed stress of djm composite ground, and then uses the superimposed stress to calculate the settlement by layer - wise summation method. by a nonlinear elastic and viscoelastic fem model, based on in - site test data, the back - analysis method of the direct optimal multiple parameters are adopted to calculate the road embankment settlement of typical project

    在前人的基礎上,結合樁身應變測試結果,提出了聯合mindlin解和boussinesq解求解攪拌樁復合地基的附加應力的方法,根據計算出來的附加應力再用分層總和法計算攪拌樁復合地基的沉降;採用和粘有限元模型,根據現場實測料,運用直接優化多參數反演分析方法,對典型程實例進行了沉降計算對比分析。
分享友人