面水的建築物 的英文怎麼說
中文拼音 [miànshuǐdejiànwù]
面水的建築物
英文
buildings facing the river- 面 : Ⅰ名詞1 (頭的前部; 臉) face 2 (物體的表面) surface; top 3 (外露的一層或正面) outside; the ri...
- 水 : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
- 的 : 4次方是 The fourth power of 2 is direction
- 建 : Ⅰ動詞1 (建築) build; construct; erect 2 (建立; 設立; 成立) establish; set up; found 3 (提出;...
- 築 : 築名詞(貴陽的別稱) another name for guiyang
- 物 : 名詞1 (東西) thing; matter; object 2 (指自己以外的人或與己相對的環境) other people; the outsi...
-
1 sedimentation anyslys of soil under the action of deadweight ; 2 sedimentation anyslys of structure in using ; 3 endogen force anyslys of structure in using ; 4 soil remolding type anyslys ; 5 homogenous flush works anyslys ; 6 anyslys of the structure sedimentation effects of different flushing amount at the same place ; 7 anyslys of the structure sedimentation effects of different flushing places ; 8 anyslys of the structure sedimentation effects of different horizontal flushing places ; 9 anyslys of the structure sedimentation effects of different vertical flushing places ; getting the different between the endogen force of common structure and that of slant structure. the rule of stricture sedimentation and the effect of different soil remolding type were also gained
對掏土糾偏過程做了以下9個方面的分析: 1 、土體在自重作用下的沉降分析; 2 、建築物在使用階段的沉降分析; 3 、建築物在使用階段的內力分析; 4 、土體受擾動類型分析; 5 、均勻沖水施工過程分析; 6 、同一個地方沖水量大小不同對建築物沉降影響分析; 7 、不同沉井沖水對建築物沉降影響分析; 8 、進深不同的土層沖水對建築物沉降影響分析; 9 、不同埋深土體沖水對建築物沉降影響分析。This four - storey building was classic in style, the whole of the front and the main architectural features of the back and end elevations being carried out in cement plaster. all exposed brickwork in the exterior elevations was of red formosa facing bricks
這幢四層高的建築物具古典風格,整個大樓的正面、以及其具建築特色的背面及側面皆以水泥建成,而所有外墻均以紅磚砌成。There was now visible a house or houses - for the building spread far - with many windows, and lights burning in some ; we went up a broad pebbly path, splashing wet, and were admitted at a door ; then the servant led me through a passage into a room with a fire, where she left me alone
這時看得見一間,也許是幾間房子,因為那建築物鋪展得很開,上面有很多窗子,其中幾扇里亮著燈。我們踏上一條水沫飛濺的寬闊石子路,后來又進了一扇門。接著僕人帶我穿過一條過道,進了一個生著火的房間,撇下我走了。The project is 156 m dam height, 877 m normal impounded level and 760 mw installed capacity. minjiang river benches almost conversely in shajinba reach and makes the right bank a thin and weak ridge, which is a syncline geological structure
岷江在沙金壩河段形成一個近180的河曲,使右岸形成三面被河曲圍抱的條形山脊,構造上為一完整沙金壩向斜,工程區水工建築物都布置在右岸山脊內。The base area of the building is to show level of periphery of above of plinth of building ground floor is umbriferous area
房屋的基底面積是指建築物底層勒腳以上外圍水平投影面積。In this paper, the finite - element numerical analysis calculation is applied to the foundation of high - rise and multi - floor building and the evolvement law of stress and displacement of tunnel used by urban traffic to explore the mutual influence between the wall rock of underground space and high - rise building foundation, taking account of the specific construction situation in the " sanmu garden " project in dadukou district in chongqing, from the perspective of underground space static - force structure stability analysis to open a underground tunnel with 6m in span and 7. 5m in height for track traffic 20m below the surface. this paper, taking considerations of three different states, i. e. the natural state without any artificial interference, the state of high - rise buildings on the surface, and the underground tunnel state with excavation for track traffic, and four plane lines and four vertical lines, analyzes and studies the distributing law of stress and displacement of calculation section from the following aspects : ( 1 ) the main stress vectorgraph, displacement distribution graph ( ux, uy ) and chromatogram graph of stress isoline ( 1, 2, xy ) of section under different states ; ( 2 ) the contrastive distribution curve of stress ( 1, 2, xy ) of different plane and vertical lines under the same state ; ( 3 ) the contrastive distribution curve of stress ( 1, 2, xy ) of the same plane and vertical lines under different states, wishing to provide references for underground space utilization and project designing and construction of the tunnel under high - rise buildings in the future
本文結合重慶市大渡口區「三木花園」開發建設項目,從地下空間靜力結構穩定性分析角度出發,針對在該項目中涉及的高層和多層建築物以及在其地下20米處開挖了一個用於軌道交通的跨度6米,高7 . 5米的地下隧道這一具體工程情況,採用2d - 3d -有限元結構分析程序對高層與多層建築物的地基基礎及其與城市軌道交通使用的地下隧道圍巖的應力與位移演變規律進行了有限元數值分析計算,探索了地下空間圍巖與高層或多層建築物地基基礎之間的相互影響,通過考慮未受到任何人為擾動影響的天然狀態、地表存在多層或高層建築物狀態和地下開挖用於軌道交通的地下隧道狀態等三種不同狀態以及4個水平剖線和4個垂直剖線等不同情況,從以下幾個方面具體分析研究了計算斷面的應力與位移分佈規律: ( 1 )在各種不同狀態下計算斷面的主應力矢量圖、位移分布圖( ux 、 uy )以及應力等值線色譜圖( _ 1 、 _ 2 、 _ ( xy ) )等; ( 2 )相同狀態下不同水平與垂直剖線的應力_ 1 、 _ 2和_ ( xy )對比分佈曲線; ( 3 )不同狀態下相同水平或垂直剖線的應力_ 1 、 _ 2和_ ( xy )的對比分佈曲線等,為今後在對地下空間的開發利用以及在高層建築物地下開挖硐室時的工程設計和工程施工提供參考依據。To avoid manual labor of chiseling - grossness, in the area of second - stage concrete construction, permanently non - removed metal molding boards nets are used as molding boards of first - stage concrete. substitution joints of reinforcing steel bars for traditional electric welding and usage of equipments for joints of reinforcing steel bars efficiently improve strength of junctions and rate of connecting reinforcing steel bars, and safety of construction and stability of quality, and greatly reduce cost. it ' s possible that three gorges project become top - ranking project in the world by study on systems engineering of high - strength concrete construction
混凝土縫面處理採用高壓水流沖毛技術,大大提高了施工工效,減少了倉面污染;模板工程大量採用定型鋼模板施工技術,提高了壩體混凝土成型質量和工程進度;在二期混凝土施工區域,為免除人工鑿毛勞動強度,採用永久性免拆金屬模板網作為一期混凝土模板;鋼筋連接改進傳統的電焊連接方式,採用大量採用鋼筋接頭機械連接技術,有效提高了接頭強度和鋼筋連接速度,施工安全性大大加強,質量穩定性有效提高,經濟成本大大降低;三峽二期工程持續高強度混凝土施工系統工程的研究,使三峽工程成為名符其實的「世界一流工程」成為可能;三峽二期工程混凝土溫控綜合技術的應用,有效降低了壩體混凝土溫度的產生;混凝土表面處理及裂縫處理技術的應用,提高了建築物的整體性和耐久性。Exterior building paints. conventional determination of the water permeability of microporous cladding paints
建築物外部塗料.飾面用微孔塗料水滲透性的常規測定The frozen damage of slab - foundation of channel irrigation structures in the northeast of china is the most serious and includes the general characteristics of frozen damage of the channel irrigation structures
我國凍土分佈面積極為廣闊,雖然東北地區渠系水工建築物的板基凍害最為嚴重,但也是其它地區的共性問題。In the end, the standard partitions the grades of obstruction traits. the river hydrotechnic obstructions assessment program plans the assessment program for common hydrotechnic buildings roundly and establishes the strict review system
內河水工礙航物礙航評價工作程序較全面地規劃了一般水工建築物進行礙航評價的工作流程,制定了較嚴密的礙航評審制度。Although in the practical use, some standards were carried out by the relevant departments in china, and they have some related contents in some aspects, many aspects can not meet the requirements of new times. furthermore those standards are distributed and developed by different departments. in this paper, the research work is base on the developments of msa of the p. r. c : procedures of risk assessment for obstruction above and under water
在實際的管理實踐中,我國目前採用一些已有的國家標準或部頒標準及其它的一些行業標準來對水工建築物的建設進行約束,雖然這些標準從某些方面對水工建築物的建設作出了具體規定,但隨著時代的發展,其內容有很多已不適應現實要求,而且這些標準政出多門,所涉及到水工建築物建造標準的內容比較分散,沒有形成一個完整的體系。However, the condition of hydraulic structure and structural complexity gives difficulties to the reliability analysis. so the reliability make less, especially in pump station and water gate
但是,對于具體的水工建築物的可靠性分析問題,由於水工結構的條件、工程的復雜性,因此在結構設計可靠性研究方面進展甚微,尤其是對泵房、水閘等水工建築物的可靠性分析研究甚少。Being the largest tin hau temple in hong kong, it is known as " tai miu " which means the " grand temple ". the main hall is dedicated to tin hau, the goddess of the sea, while in the side hall on the right, there are a bronze bell and a tin hau s bed
科大校址在西貢清水灣半島北端的大埔仔,佔地60公頃,背山面海。校舍依山興建,呈階梯形,從位於不同水平的建築物也可盡覽錦繡明媚的海景,視野毫無阻礙。In the construction industry there has always been a mismatch between the research investment and construction expenditure and this has lead the industry to proceed on a scale with an inadequate understanding of many aspects of construction, such as, deterioration mechanism for structures that has often meant that due allowance has not been made for practical repair and maintenance. however, notwithstanding this situation there have been encouraging signs that within the last twenty years the transition from the conventional materials to the more advanced materials is being spear - headed by the construction industry where over 30 of all polymers produced are now utilised in that industry
水工建築物是社會各建築群體中的一類,是所在地環境的一個有機組成部分,隨著經濟社會的發展,水工建築物的外觀越來越受到重視.水工建築物的外觀質量控制主要在設計與施工兩個環節.外觀設計的質量表現在建築物滿足運行功能要求的情況下,既方便施工,又具有特色.施工的質量表現在建築物的實施效果.常見的外觀質量缺隙主要有蜂窩麻面、色澤不一、氣泡偏多、表面平整度差等,應從施工工藝、建築材料的質量等方面加以控制The photo below was taken by the observer on 31 july 2003, showing a waterspout just behind the hong kong aircraft engineering company limited haeco building. another funnel cloud was visible to the left
下面的照片是氣象觀察員在七月三十一日拍攝,可見在香港飛機工程公司的建築物後面有一股水卷,它的左邊則有漏斗雲。The photo below was taken by the observer on 31 july 2003, showing a waterspout just behind the hong kong aircraft engineering company limited ( haeco ) building. another funnel cloud was visible to the left
下面的照片是氣象觀察員在七月三十一日拍攝,可見在香港飛機工程公司的建築物後面有一股水龍卷,它的左邊則有漏斗雲。As a kind of important hydraulic structure, hydraulic tunnel is very useful at many aspects such as conveyance, diversion and flood discharge
水工隧洞作為一種重要的水工建築物,在輸水、導流及泄洪等方面起著重要的作用。5 ) to solve the uncertain modeling problem about hydraulic buildings, a new modeling method named aggregation modeling based on graph object technique is put forward. as a result, the graph model of solid gravity dam is designed. the graph object of water _ proof dam section taken as an example, the design and implement of self defined graph object is discussed
5 )根據水工建築物不定型建模的特點,提出一種基於圖形對象技術的聚合建模方法,詳細討論了聚合建模法的基本原理;設計了實體重力壩的圖形對象模型,並以擋水壩段圖形對象的設計為例,研究了自定義圖形對象的設計和實現;基於objectarx的通知? ?反應機制,採用數據庫反應器和對象反應器,建立了圖形對象的互動操作機制;以擋水壩段斷面優化設計為例,研究了圖形對象和分析、計算功能的集成方案。Hydraulic structures, velometers, weirs, and flumes are used to gauge water in many irrigation districts. the fundamental principles and suitable conditions of these water metering methods are introduced in this paper. the main problems in the development of water metering instruments and facilities as well as main causes of difficulty in popularization of the methods in irrigation districts are analysed. it is suggested that selection and construction of water metering facilities should be combined with canal lining in irrigation districts. it is also pointed out that for realization of automation of water metering it is necessary to develop and popularize portable and stationary water metering instruments step by step based on economic development levels in irrigation districts
介紹利用水工建築物、流速儀、堰、槽進行量水的基本原理及各自適用條件.從量水儀器、設施的性能、價格及灌區經濟發展水平等方面,分析目前在灌區量水儀器、設施的開發研製方面存在的主要問題,以及灌區量水難以普及的主要原因.提出應結合灌區渠道防滲工程建設,合理選擇和建設量水設施,並根據灌區經濟發展水平,分步驟研製和推廣便攜式或固定式量水儀器,最終實現灌區量水自動化的灌區量水實施方案In the end, the main dam of huangbi - zhuang reservoir is analyzed with the program built in this paper and some reasonable conclusions are drawn about it. there are also some availability suggestions proposed to estimating and inspecting the earth dams and the problems that to be further studied are presented
由此得出結論,用有限元的方法分析均質土壩的滲流、評估已建的水工建築物,具有方便、快捷的優點,同時所得結果的可信度高,是一種可行的方案,最後,提出了一些關于土壩評估方面的建議和有待解決的問題。分享友人