面積三角測量 的英文怎麼說

中文拼音 [miànsānjiǎoliáng]
面積三角測量 英文
area triangulation
  • : Ⅰ名詞1 (頭的前部; 臉) face 2 (物體的表面) surface; top 3 (外露的一層或正面) outside; the ri...
  • : Ⅰ動詞(積累) amass; store up; accumulate Ⅱ形容詞(長時間積累下來的) long standing; long pending...
  • : Ⅰ數詞1. (二加一后所得) three 2. (表示多數或多次) more than two; several; many Ⅱ名詞(姓氏) a surname
  • : 角Ⅰ名詞1 (牛、羊、 鹿等頭上長出的堅硬的東西) horn 2 (古時軍中吹的樂器) bugle; horn 3 (形狀像...
  • : 動詞1. (測量) survey; fathom; measure 2. (測度; 推測) conjecture; infer
  • : 量動1. (度量) measure 2. (估量) estimate; size up
  • 面積 : [數學] area
  • 測量 : measure; survey; gauge; meter; measurement; measuring; surveying; mensuration; metering; gauging;...
  1. Study achievement appears as following aspects : ( 1 ) yellow river estuary gate river flow and tide flow mixed area is not keep standing deposition status, on special income water and sediment conditions, boundary conditions and oceanic power conditions, this area may on the scour status ; ( 2 ) observed from estuary sediment deposition distributing process : delta and sea offing area sediment deposition vary trend is similar, each part sediment deposition scale varies as wave shape ; ( 3 ) on estuary gate, affect the sediment deposition factors, primary factors are tide prop, the gate widens gradually, estuary gate have branches, brine induced flocculation. this paper study the estuary gate widen, estuary gate have branches to affect the river channel deposition in quantity ; ( 4 ) based on field measured data, for the first time, deduce the estuary sediment deposition and distributing regress formula which can estimate estuary different areas sediment deposition volume ; ( 5 ) this subject demonstrate the estuary delta coastline dynamic balance conception, build the relationship between the estuary income sediment with deposition land area, draw the following important conclusion : when estuary years - averaged income sediment keeps at 345 million tons, the delta coastline may on the dynamic balance status. ( 6 ) this subject firstly brings up estuary sediment optimized control conception, and has the primary study on the macroscopically optimized control conception method

    研究認為: ( 1 )黃河河口口門逕流潮汐區域並非持續保持淤狀態,在特定的來水來沙、邊界條件和海洋動力條件下,該區域可以處于沖刷狀態; ( 2 )從河口泥沙沉分配的過程來看:洲與濱海區泥沙的沉變化趨勢是基本一致的,各部位的泥沙沉比例變化基本呈波動狀態,且洲與濱海區泥沙的沉比例與來沙密切相關,基本成正比關系; ( 3 )在口門處,影響泥沙沉淤的因素主要集中在潮汐頂托、口門逐漸加寬、河口門分汊、鹽水造成絮凝等,本報告主要對口門加寬,口門西妥理工大學工程碩士專業學位論文分漢對河道淤的影響進行了定分析: (一扣根據實資料首次建立了河贖流路泥沙沉分配的回歸計算式,據此可以預估計算河口不同區域泥沙的沉淤; 、 5 )本項研究首次論證了河口洲岸線動態平衡的概念,並建立了黃河河口來沙與造陸的相關關系,得出了當河口多年平均來沙維持在3 . 45億t時其河口洲岸線則可能處于動態平衡狀態的重要結論; 『 6 )本項研究首次提出了河口泥沙優化調控的概念,並對其宏觀優化調控模式進行了初步探討。
  2. The methods of gps - data processing and the way to calculate field area using triangle division were put forward in this paper, and the software was programmed to calculate field area through gps

    給出了gps數據的處理方法,提出了使用形分割法計算農田的的方法,並編程實現了農田的gps計算。
  3. So, a new criterion about the area calculation of the house appears. according to that, the area of the house equal to the sum of the practical area and the area of the wall section. the latter can be calculated on the criterion easily

    儀的房屋套內的設想是通過步進電機驅動激光距傳感器旋轉每一步距,對距離數據進行每步採集保存,轉滿一周后對相鄰距離值構成的進行計算求和而得到
  4. We discuss the visual information from texture image and the cause of texture distortion, and then present a simplification algorithm with texture in chapter three. the visual information from different parts of texture image is measured by color variation, and the possibility of texture distortion is measured by the unevenness of texture intensity ( the area of a triangle ' s corresponding texture divided by its area in geometric space )

    該演算法考慮了紋理扭曲的成因和紋理圖像內容對視覺的影響,用邊緣檢的方法度紋理圖像上不同區域對視覺影響的大小,用紋理密度(形對應紋理區域的大小和它在維空間中的比值)的變化度紋理扭曲發生的可能性和嚴重程度,並把這些與紋理相關的誤差度和幾何誤差度結合。
分享友人