面積流量計 的英文怎麼說

中文拼音 [miànliúliáng]
面積流量計 英文
area flow meter
  • : Ⅰ名詞1 (頭的前部; 臉) face 2 (物體的表面) surface; top 3 (外露的一層或正面) outside; the ri...
  • : Ⅰ動詞(積累) amass; store up; accumulate Ⅱ形容詞(長時間積累下來的) long standing; long pending...
  • : Ⅰ動1 (液體移動; 流動) flow 2 (移動不定) drift; move; wander 3 (流傳; 傳播) spread 4 (向壞...
  • : 量動1. (度量) measure 2. (估量) estimate; size up
  • : Ⅰ動詞1 (計算) count; compute; calculate; number 2 (設想; 打算) plan; plot Ⅱ名詞1 (測量或計算...
  • 面積 : [數學] area
  • 流量 : rate of flow; flow; runoff; discharge; throughput; (flow) rate; quantity (of flow); flux
  1. A statistical model is developed and indicates high correlation between the accretion of modem yellow river delta and the water and sediment discharge of yellow river, and the model shows the necessary water and sediment discharge per year to ensure the equilibrium of alluvion and erosion of yellow river delta

    黃河三角洲凈造陸與黃河入海水沙的統模型說明,黃河三角洲沖淤動態平衡時的黃河入海徑為71 . 93億m ~ 3 a ,輸沙為1 . 853億t a 。
  2. Mems ( micro electromechanical system ) has become one of the most rapidly development technologies. along with the rapid development of mems techniques, capacitive sensor is used widely whose capacitance changes small, which has put forward the new request to the measurement technique. the common measure for capacitance measurement is that convert capacitance to voltage, electric current or frequency. the area of polar plate of the capacitor becomes smaller and smaller, and the total capacitance of micro capacitive sensor is usually several pico farad only. as a result, its change amount is smaller

    Mems ( microelectromechanicalsystem )近年來發展最快的技術之一,隨著mems技術的快速發展,電容式加速度的電容變化變化越來越小,對檢測技術提出了新的要求。在電容式傳感器中,常用電容檢測電路是將其轉換為電壓、電或者頻率信號。目前的微型電容傳感器的極板變得越來越小,電容總只有幾個pf ,變化就更小。
  3. Fluid noise mainly comes from out put pulsation of rate of flow, the main reason of out put pulsation of rate of flow is the instant high pressure return flow that obturation cubage produced when the big round curve pressure transition. the v trough on the port plate can reduce the fluid noise. in this paper, the author based on the acting of dam a river and condensability of liquid and used matlab language as tool to calculate the v trough on the original port plate and drew out the p - t diagrammatic curve and analyzed its shortcoming and improved the design of original v trough and got that the best size of its angle was 12. 3 and its length was 5mm and the cross section was an equilateral triangle

    體噪聲主要來源於輸出脈動,造成輸出脈動的主要原因是閉死容在大圓弧段壓力切換時產生的瞬時高壓迴,在配盤上開設v型尖槽可降低因高壓迴而引起的體噪聲,本文以截作用和液體的可壓縮性為理論依據,以matlab語言為工具,對原配盤上的v型尖槽進行了理論算,繪制出p - t圖線,分析了它的不足,並對原有v型尖槽進行了優化設,得出了v型尖槽的最佳幾何尺寸:配盤平上的v型尖槽的兩邊的夾角為12 . 3 ,槽長5mm ,槽的橫截為等邊三角形。
  4. The special district is bordered on the east by hsinchieh stream, on the west by chia stream, on the north by the 60 dnl noise boundary of taoyuan military airport and on the south by the current scope of the specified area of jungli and neili interchanges. the total area covered is 428 hectares, excluding the 20 hectares for hsr station

    本特定區范圍東以新街溪為界,西至洽溪為界,北側參照桃園軍用機場1990年日夜均能音60dnl噪音界線為界,南以銜接現有中壢及內壢交道特定區都市畫范圍為界,扣除高鐵車站專用區20公頃,為428公頃。
  5. Measurement precision contribute to improving the security class and economic of boiler running and automatic level of whole plant. the smart measurement instrument of the boiler ’ s air flow designed in the thesis and the instrument can make the degree of accuracy get to. firstly, the thesis build the “ velocity - area ” method which is on basis of “ log - tchebycheff ” on the analyzing of basic measure method of boiler ’ s air flow. secondly, model86 averaging pitot tube was selected the right model of flow transducer which can pickoff the differential pressure and static pressure. modelc264 which made in setra system corp. u. s. a was selected as ultra low differential pressure transmitter. a good flow of boiler ’ s air was calculated by offsetting pressure and temperature. finally, numeroscope was designed with z80cpu and other chips

    精確的監測有助於提高鍋爐燃燒的安全型、經濟性,也有助於提高電廠的整體自動化水平。本文設的智能化鍋爐風裝置能夠實現對鍋爐送風的精確測,精度可達。本文首先研究鍋爐送風矩形大管道測理論,提出在測點布置基於「對數-切比雪夫」法的速度-法。
  6. In the final part, from the company strategy viewpoint the further discussions have made to indicate the importance of better understanding and management of information from cash flow statement an alysis. in author ' s opinion, a good understanding and management of information from the cash flow statement analysis make it possible for a company to better use and manage the cash resource, improve the conventional accounting report analysis system and prevent the false accounting information in order to achieve an effective and successful management in the company ' s operating, accounting and long term strategy

    筆者認為,通過對現金表的深入透徹的理論分析和實證研究,能夠全了解和掌握作為企業經營活動血液的現金的來源和運用狀況,把企業的經營狀況、財務狀況、戰略管理狀況同企業的現金緊密的聯系起來,同時對于完善傳統的財務報表分析體系,防止會信息失真以及充分發揮現金管理在企業管理中的重要作用都有極意義。
  7. When catchment area, average channel gradient and catchment shape factor of designed culvert or bridge are known, a user can be convenient to get local parameters c, e and b from standard contour charts and easy to calculate flood flow just by a calculator. design period of flood flow is enormously shortened as well as a high precision. estimated flood flow through culvert or small bridge by new calculation model is generally less than by traditional methods, so that much cost is cut down a s reducing the span of culvert or small bridge

    以75000km ~ 2的川中丘陵地區為試點研究區,繪制了該地區新模型的參數等值線圖,率定了不同設頻率的改正系數,使設者只需在地形圖上獲取集水,河道平均坡降和域形狀系數,在參數等值線圖上查得橋涵所在地的相應參數,使用算器即可迅速算出設,大大縮短了設周期,且精度較高,設的洪水一般低於傳統方法,從而可減小橋涵跨徑,節省投資。
  8. Study achievement appears as following aspects : ( 1 ) yellow river estuary gate river flow and tide flow mixed area is not keep standing deposition status, on special income water and sediment conditions, boundary conditions and oceanic power conditions, this area may on the scour status ; ( 2 ) observed from estuary sediment deposition distributing process : delta and sea offing area sediment deposition vary trend is similar, each part sediment deposition scale varies as wave shape ; ( 3 ) on estuary gate, affect the sediment deposition factors, primary factors are tide prop, the gate widens gradually, estuary gate have branches, brine induced flocculation. this paper study the estuary gate widen, estuary gate have branches to affect the river channel deposition in quantity ; ( 4 ) based on field measured data, for the first time, deduce the estuary sediment deposition and distributing regress formula which can estimate estuary different areas sediment deposition volume ; ( 5 ) this subject demonstrate the estuary delta coastline dynamic balance conception, build the relationship between the estuary income sediment with deposition land area, draw the following important conclusion : when estuary years - averaged income sediment keeps at 345 million tons, the delta coastline may on the dynamic balance status. ( 6 ) this subject firstly brings up estuary sediment optimized control conception, and has the primary study on the macroscopically optimized control conception method

    研究認為: ( 1 )黃河河口口門逕潮汐區域並非持續保持淤狀態,在特定的來水來沙、邊界條件和海洋動力條件下,該區域可以處于沖刷狀態; ( 2 )從河口泥沙沉分配的過程來看:三角洲與濱海區泥沙的沉變化趨勢是基本一致的,各部位的泥沙沉比例變化基本呈波動狀態,且三角洲與濱海區泥沙的沉比例與來沙密切相關,基本成正比關系; ( 3 )在口門處,影響泥沙沉淤的因素主要集中在潮汐頂托、口門逐漸加寬、河口門分汊、鹽水造成絮凝等,本報告主要對口門加寬,口門西妥理工大學工程碩士專業學位論文分漢對河道淤的影響進行了定分析: (一扣根據實測資料首次建立了河贖路泥沙沉分配的回歸算式,據此可以預估算河口不同區域泥沙的沉淤; 、 5 )本項研究首次論證了河口三角洲岸線動態平衡的概念,並建立了黃河河口來沙與造陸的相關關系,得出了當河口多年平均來沙維持在3 . 45億t時其河口三角洲岸線則可能處于動態平衡狀態的重要結論; 『 6 )本項研究首次提出了河口泥沙優化調控的概念,並對其宏觀優化調控模式進行了初步探討。
  9. This paper, on the basis of yuelu - mountain high - tech park in changsha city, beginning with the investigation of diversiform transit - trip in the park, firstly analyzes and evaluates space - time change law of traffic flow and situation of traffic service level on actual road net - work in the park ; secondly, applying multi - statistical analysis method, taking investigated corporation as sample, using annual freight traffic volume produced by unit plant area of the corporation, with clustering analysis, obtains four sorts of the sample corporation, and establishes the predict models of freight traffic volume for every kind of corporation. with these models, actual or planning year ’ s day maximum freight traffic volume can be predicted. the third, this paper makes analysis research of trip law of employees in the park, and obtains the index of trip times, trip modes and trip development trend of the employees

    本文以長沙市嶽麓山高科技園區為依託,從調查園區內的各類交通出行開始,首先分析評價了園區內現狀道路網上的交通時空變化規律及道路網上的交通服務水平狀況;其次是應用多元統分析方法,以調查企業為樣品,以企業單位車間所產生的年貨運交通為變,通過聚類分析,獲得了樣本企業的四個類別,並建立了各類企業貨運交通的預測模型,應用這些模型,可預測園區內現狀或規劃年的日最大貨運交通;第三是對園區內企業員工的出行規律做了分析研究,獲得了企業員工的出行次數、出行方式及出行發展趨勢等等特性指標;最後是對園區內小區居民的出行狀況進行了分析,獲得了居民出行的諸如高峰時段、高峰出行等等的特徵數據。
  10. O ur joint ventures compose of hong kong and china mainland companies, the prophase company was founded in 1989, which is specialized in producing pvc inflatables & high frequence products, the products have been exported to western countries and asia, we have almost 200 high frequence machines, the most power is 180kw, which welding area is 3. 5x4. 2 meters, our salesmen own rich experiences and can design products according to the request, or follow the photos or samples. we have serious management system, correct delivery time, whatever the order is big or small we would support constantly with high quality 、 best price and good service

    本公司為中港合資企業,前身成立於1989年,專業生產pvc充氣製品、高周波產品,產品遠銷西方各國、東南亞及國內市場,擁有大小高周波機器近二百臺,最大機臺180kw ,熔接可達3 . 5x4 . 2米,業務人員擁有數十年經驗,可依據要求設產品,或來圖樣訂制,並設有嚴格的管理體系,準確的交貨期限,一如繼往的專業精神,不論訂單大小,我們都以一的產品質,合理適中的價格,良好的服務,為客戶的商務活動提供可靠的支持
  11. The factors include antecedent precipitation of low flow period and status of karst basins ( such as lithology, landform, drainage area, drainage density, length and ratio of demotion of main river and so on. ). based on the former studies, integrated the conventional statistic methods, the technique of anns is applied in this paper for researching the law of the low flow of karst basins in guizhou altiplano

    影響喀斯特域枯水徑的因素異常復雜,其影響因素主要有枯季前期降水和巖性、地貌、、河網密度、主河道長度及其比降等域下墊狀況。本文在前人研究的基礎上,採用人工神經網路技術,結合傳統的統方法,研究貴州高原上喀斯特域的枯水徑規律。
  12. However, it lacks runoff data in absolutely most areas where culvert and small bridge locate. some traditional design method, such as the methods of statistic zone parameter, modification by catchment area, rainfall - runoff, reasoning formula and empiric equation et al, are used to estimate flood flow through culvert or bridge

    然而,絕大多數中小橋涵所在地卻沒有可利用的徑資料,通常採用統分區法,改正法、暴雨徑法、推理公式和經驗公式等傳統設方法,這些方法一般比較繁瑣、精度較低、設偏大,導致工程造價偏高而浪費資金。
  13. Based on the natural conditions, land use and production situation and implementation of the valley harnessing measures in the anjiagou river basin, dingxi county, gansu province, in this study the land use types, spatial distribution mode of land use structure, costs of farming, forestry and animal husbandry and their economic returns are analyzed, the qualitative and quantitative maximum economic returns of agriculture and animal husbandry are lucubrated, and an optimized design of land use structure is carried out by using the linear programming method and developing a mathematic model under the restriction of land area, labor forces, livestock forces, social requirements and forage supply

    摘要根據甘肅定西安家溝域自然條件、土地利用狀況、治理措施和生產狀況,通過對土地利用的類型、結構空間分佈模式以及人財物資源的輸入和輸出分析,以種植業和畜牧業總體最大純經濟效益最高為目標,從定性到定,通過建立數學模型,在土地、勞動力、畜力、社會需求和飼料需求的約束之下,應用線性規劃方法進行土地利用結構優化設,求解最優目標解,得出優化方案。
  14. One is hardware design, parameters of the elements are calculated strictly in this section. then the appropriate elements are selected. the other are software design. it includes follow chart, programme and explanation of the program

    最後根據測儀所要完成的功能對主程序、系統鍵盤掃描程序、 a d數據採集及算程序、結果顯示程序進行了程說明及匯編代碼設
  15. The design capacity of the communal drainage system is intended for handling the surface runoff arising from rainstorms, the volume of which is much higher than the volume of wastewater being inappropriately discharged into the drainage system. even though some wastewater may find its way into the communal drains, the drainage system which is serving a large catchment area should be able to handle it without increasing the risk of flooding

    公用排水系統的,是要把大雨所引致的地收集並排走,其容及排遠遠超過錯誤排入的污水,加上集水區的廣闊,就算有污水錯誤排入,公用排水系統都足以應付,不會增加水浸的風險。
  16. The results show that the precision of the model is well, but the influence to the precision of the model in the prediction of field runoff can ' t be ignored

    分析結果表明,該模型應用於小算時精度很高,但在進行野外坡的預測時,不能忽略控制的大幅擴大對模型預測精度的影響。
  17. It provides various kinds of function, such as flow chart, real time dynamic display, real time and historical trend chart, alarm, report, data logging, parameter setting etc. the function of flow calculation and compensation, data acquisition and storage, communication is also provided in flow calculator

    算機實現hmi人機介和數據管理平臺,具有工藝程圖、實時動態顯示、實時和歷史趨勢圖、報警、報表、數據記錄、參數設定等功能。算單元固化有專用軟體和通訊軟體,實現數據採集、算、補償、存儲、通訊等功能。
  18. Design of flow meter based on partial area method

    基於部分法的算儀設
  19. Special designs of area meters are available to solve many different flow problems.

    解決不同的問題有各種專門設面積流量計
  20. Variable area flowmeter

    面積流量計
分享友人