頂水封 的英文怎麼說

中文拼音 [dǐngshuǐfēng]
頂水封 英文
toseal
  • : i 名詞(人體或物體的最上部) crown; peak; top Ⅱ動詞1 (用頭支承) carry on the head 2 (從下面拱...
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  1. The top of bucket is sealed with rubber membrane, and the rubber membrane inflated at a pressure.

    端用橡皮膜密,橡皮膜在壓力作用下膨脹。
  2. The fundamental ideas and methods of this paper are also illuminated in this chapter. in chapter two, a one - dimensional and semi - closed shallow sea mode is studied. the approximate analytical expressions of the water level at the top of the bay induced by the nonlinear interaction between the storm surges and the astronomical tides are obtained by using the perturbation method

    在第二章里,研究了一維半域中的非定常風暴潮與天文潮非線性相互作用的問題,用攝動方法求出了具有實際意義的海灣部增位的一階近似解析表達式,並給出了增過程曲線。
  3. To this, transmit of general office of the state council labor safeguard ministry and ministry of finance about executing the opinion of allowance of national official medical treatment, the requirement attends in national official while primary medical treatment is safe, according to former medical treatment at public expenses actual expenses and insurance of primary medical treatment raise fund the level raises money funds of medical treatment allowance, include finance the budget, use technically at the medical treatment charge of accessorial officeholder, the charge that includes charge of medical treatment of the above that seal a top, individual to pay medical treatment charge to exceed certain amount above oneself and medical treatment take care of the primary medical treatment of the object to take care of charge

    對此,國務院辦公廳轉發了勞動保障部和財政部關于實行國家公務員醫療補助的意見,要求在國家公務員參加基本醫療保險的同時,根據原公費醫療實際支出和基本醫療保險籌資平籌集醫療補助經費,列入財政預算,專門用於補助公務員的醫療費用,包括以上醫療費用、個人自付醫療費用超過一定數額以上的費用和醫療照顧對象的原醫療照顧費用。
  4. In the condensed sections analysis, the concept of water - bearing lacustrine basin condensed sections and non - water - bearing basin condensed sections are firstly put forward, and have been described their features of lithology, mineral and geophysics, and have been predicted their distribution. meantime, this paper has studied the geochemical characters of source rocks, and contrast betwee

    同時,對有湖泊密集段進行了烴源巖地球化學特徵和烴源對比研究,確立了凹陷的含油氣系統;對無盆地密集段進行了蓋層閉能力的研究,確定了含油氣系統的區域性蓋層及部范圍。
  5. It is widely applied to the stove top, shove head, stove door and burmer brick, the binding of cooling - tube and groove bottom of the molten steel mouth of the heat stove, meantime empopyed in the field of the step stove bottom, the fir - proof wall of the circular stove, the cover, the protruding tape and sand sealing mouth of the equal - heating stove, the triangle, the spray gun and meltingiron groove of electric stove and also including fire - resistant material used in the refine stove and the stove door

    加熱爐的爐、爐頭、爐門、燒嘴磚、冷管包紮、出鋼槽槽底、步進爐爐底、環形爐檔火墻、均熱爐的爐蓋、凸出帶、砂口、中間包包蓋、電爐三角區、鐵包襯里、爐外精煉用噴槍,底吹氧煙道、鐵溝蓋、檔渣堰、高爐中各種耐用火料襯里煉焦爐爐門等。
  6. Fabrication of the box beam is divided into such parts as reinforcement, formwork, concreting, prestressing, moving and storing of beam, pipe grouting under pressure, end sealing of the beam, water - proof layer on the bridge surface system, protective coating etc. the paper makes description of effective box beam construction technology and workmanship which can be adopted in other projects, such technologies as : manufacturing and fixing of reinforcement, steel reinforcement fixing baseplate, web plate and top plate respectively and lifting the steel skeleton into form, requirements of design and manufacturing and way of utilization for dismantling - erection type formwork and hydraulic formwork, optimization of concrete ratio, concrete pouring process of two ends of beam in priority over the middle, in sequence of first baseplate followed by web plate and top plate at last, concrete pouring in inclined section and in horizontal layer, concrete vibration mainly by external vibrator in assistance with internal vibrator, methods and regulation for steam curing of concrete, dual controls over stress and strain to ensure quality of prestressing workmanship, construction method of effective beam moving by heavy - weight special moving facility, some regulations and key notes about construction of grouting under pressure, beam ends sealing, water - proof layer on the bridge surface system, protective coating

    箱梁製造由鋼筋工程、模板工程、混凝土工程、預應力工程、移存梁工程、孔道壓漿工程、梁體端工程、橋面防層和保護層工程等施工環節組成。文中介紹的採用胎具製作和綁扎鋼筋,分底腹板和板分別綁扎並吊裝鋼筋骨架入模;拆裝式和液壓式兩種模板的設計、製作要求和使用方法;綜合考慮、優化混凝土配合比,混凝土灌注從兩端至中間、先底板、后腹板、再板的施工順序和斜向分段、腹板平分層、附著式振搗為主、插入式搗固為輔的施工工藝,蒸汽養護的方法和規定;應力應變雙控制確保預應力施工質量的施工技術;採用重物移運器有效移梁的施工方法;壓漿、端、橋面防層和保護層施工的一些規定和注意事項等都是對箱梁製造行之有效的施工技術和施工方法,並可為以後類似施工作借鑒。
  7. Seal the shipping container with either two inches ( 5. 08 cm ) or more width of pressure - sensitive or nylon - reinforced tape or with 60 - pound, three inch ( 7. 62 cm ) wide water - activated reinforced tape. close the box securely, applying three strips of tape to both the top and bottom of the box, so the middle and two edge seams are sealed

    08厘米)或更寬寬度的感壓或尼龍加強膠帶,或者使用60磅、三英寸( 7 . 62厘米)寬的活性強力膠帶,密運輸容器。在包裝箱的部和底部貼上三條膠帶,牢固地合上包裝箱,這樣中間的接縫和兩條邊沿接縫就已經密了。
  8. Doing so revealed a hydrophobic meaning water - repellent tip that allows the viral harpoon to latch on more securely to the cell membrane, which is also hydrophobic. it also provided researchers with more insight into the dramatic structural change that the f protein undergoes while performing its task. when not in use, the f protein looks like a mushroom, and its hydrophobic tip is folded into a compact form, safely hidden inside the cap

    在沒有碰到人體細胞時, 「副流感病毒5型」細胞表層的「融合蛋白」看起來就像一個蘑菇,防端嚴密閉,且安全地藏在蘑菇帽子下面當病毒接觸到人體細胞時,蘑菇帽子會突然破裂開來,防端也像魚叉一樣暴露出來,並陷入人體細胞膜內。
  9. Simply designed and precision crafted stainless steel domed covers fit flawlessly inside the cookware, sealing in heat and moisture

    簡單設計和精確加工的不銹鋼圓蓋無縫隙地蓋在鍋內,住了熱和氣。
  10. Water - or solvent - soluble liquid adhesives for automatic machine sealing of top flaps of fiberboard shipping cases

    纖維板船運箱蓋自動機密可溶或溶劑可溶的液體膠粘劑
  11. The paper introduces large - scale fem software, algor, by which the auther can build model of hanging box of high pile cap, and simulates accurately three loadcases, which include loadcase behind enclosed concrete, loadcase behind empty water in hanging box, and loadcase behind high pile cap construction. the auther calculates tensor and displacement of hanging box weir when loads exert panels, supports, suspenders, top beams, base beams of hanging box weir. at the same time the auther carrys out th e stability analysis, besides, educes calculational and analytical data, which are tally with construction result in the main

    論文介紹大型通用有限元計算軟體algor ,並用軟體建立大遼河特大橋高樁承臺吊箱圍堰的全結構模型,相對準確地模擬灌注底混凝土后、抽除吊箱內河后、承臺破冰體施工后等三種受力工況,並用模型進行了應力和變形的計算,計算各工況荷載作用於吊箱全結構箱體板面、內支撐、吊桿、懸吊梁、底梁等的應力和變形,並對比吊箱圍堰板面計算變形和施工實測變形,結果是吻合的;對大遼河特大橋高樁承臺輕型吊箱的穩定性進行了計算分析;論文研究工作表明,應用組合有限元方法計算大型施工結構問題具有現實意義。
  12. Flexible sheets for waterproofing - bitumen sheets for roof waterproofing - determination of flexibility at low temperature ; german version en 1109 : 1999

    軟板.屋瀝青板.冷彎性能測定
  13. Flexible sheets for waterproofing - bitumen sheets for roof waterproofing - determination of flow resistance at elevated temperature ; german version en 1110 : 1999

    軟板.屋瀝青板.耐熱性測定
  14. Flexible sheets for waterproofing - determination of dimensional stability - part 1 : bitumen sheets for roof waterproofing ; german version en 1107 - 1 : 1999

    軟板.尺寸穩定性測定.第1部分:屋瀝青板
  15. In an open letter in 2000, leading engineers in china, including some who had worked on the feasibility study, protested a decision to fill the reservoir faster than originally planned to maximize profit

    2000年,包括參加了三峽項目可行性研究的部分工程師在內的中國工程學界尖學者發表了一公開信,抗議為追求利潤最大化而以較原計劃更快的速度為大壩蓄
  16. Building covering. extruded mastic sealing strips for metallic roofing. specifications. test

    .金屬屋用擠壓膠粘泥密片.規范.試驗
  17. Flexible sheets for waterproofing - bitumen sheets for roof waterproofing - determination of form stability under cyclical temperature changes ; german version en 1108 : 1999

    軟板.屋瀝青板.溫度循環形狀穩定性測定
分享友人