頂水 的英文怎麼說

中文拼音 [dǐngshuǐ]
頂水 英文
top water
  • : i 名詞(人體或物體的最上部) crown; peak; top Ⅱ動詞1 (用頭支承) carry on the head 2 (從下面拱...
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  1. Crack side of apical towards the left from buttock or on the right side of equalize is horizontal, make one perpendicular bisector from qia ji apogee next, will coxal cent is 4 quadrant, quadrant goes up outside its and escape an internal angle ( connect a line to big rotor from the thorn on qia hind ) it is inject area namely

    從臀裂點向左側或右側劃一平線,然後從髂嵴最高點作一垂直平分線,將臀部分為四個象限,其外上象限並避開內角(從髂後上棘至大轉子連線)即為注射區。
  2. Answer : " law of 10 " word : crack side of apical towards the left from buttock or on the right side of equalize is horizontal, make one perpendicular bisector from qia ji apogee next, will coxal cent is 4 quadrant, quadrant goes up outside its and escape an internal angle ( connect a line to big rotor from the thorn on qia hind ) it is inject area namely

    答: "十"字法:從臀裂點向左側或右側劃一平線,然後從髂嵴最高點作一垂直平分線,將臀部分為四個象限,其外上象限並避開內角(從髂後上棘至大轉子連線)即為注射區。
  3. It is mainly used for water proofing in kitchen, avatory basenent, balciny, border, house top, cistern, natatorium, depot, workshop, the first grand floor and so on

    主要用於廚房、衛生間、地下室墻面、陽臺、花壇、屋池、游泳池的防,以及倉庫、車間、底樓的地面防潮、防
  4. A combined neural network and genetic algorithm with solving stability safety of homogeneous slope was proposed and the finite element method is applied to analysis the progressive failure process of the slope and the maximum equilibrium theory, requests out stability safety of homogeneous slope with the smooth arc radius of difference with the difference below the level coordinate of arc peak, utilizing the neural network algorithm to establish slidng the nonlinear mapping relationship between level coordinate of arc radious and arc peak, being adapted the neural network algorithm to look for along the minimal stability safety of homogeneous slope and corresponding arc radious and arc peak

    提出了求解邊坡穩定性安全系數的神經網路與遺傳演算法。該方法採用有限元分析和極限平衡理論,求出不同的滑弧半徑和不同的弧頂水平坐標下的邊坡穩定性安全系數,利用神經網路演算法建立滑弧半徑和弧頂水平坐標與安全系數之間的非線性映射關系,採用遺傳演算法搜索邊坡的最小穩定性安全系數及相應的滑弧半徑和滑弧中心坐標。
  5. He leaped towards a dressing - room near his bedroom, and in less than a moment, tearing off his cravat, his coat and waistcoat, he put on a sailor s jacket and hat, from beneath which rolled his long black hair

    他跑到他臥室的一間更衣室里,不到一分鐘,就撕下他的領結上裝背心,穿上一件短褂和戴上一頂水手帽,手帽底下露出他那又長又黑的頭發。
  6. Sanimat s. r. o. offer to you bathrooms and pavement in addition also info on tiles

    是一家高效的工業型企業,企業生產房頂水泥磚,人行道範圍內高平的產品。
  7. In the test of transmission coefficient property, semi - circle type, rectangle type, trapezoid type and concave type dyke are studied. research study is on the effect of relative water depth over the dyke to the transmission coefficient of the four different types dyke, and the comparison is done. finally, the experimental formula is given to the transmission coefficient, which are compared with the present formulae

    在潛堤透射特性的研究中,選取半圓型、矩型、梯型和槽型潛堤作為研究對象,在分析各個影響因素對潛堤透射影響的基礎上,選取最主要的影響因素,即相對堤頂水深作為研究的重點,分析研究了堤相對深對四種結構型式潛堤透射系數的影響,比較分析了四種結構型式潛堤透射特性,在此基礎上,總結了計算潛堤透射系數的經驗公式,並與已存在的計算公式進行了對比,最後對潛堤的促淤效果進行了評估。
  8. The red cap of one of the sailors hung to a point of the rock and some timbers that had formed part of the vessel s keel, floated at the foot of the crag

    巖石尖上正掛著一頂水手的紅帽子,巖的腳下漂浮著一塊風帆船骨的碎片。唐太斯頓時拿定了主意。
  9. In this thesis, first, reasons and factors for the stability of loose rock dams were summarized according to the field surveys and certain expert ' s experiences. then, researches on block stability problems were reviewed, and according to the relationship between grain size and incipient velocity, it is found that the block weight is in direct proportion to 6 - 9 power of incipient velocity, and 50 % increase of the velocity will result in about 40 times change of the block weight. after that, experiments were conducted in a flume, focusing on the relationship between incipient velocity and some main factors including block weight, water depth over the dam, cross - section size, block material and river bed material

    本文首先根據散拋石壩損毀情況的現場調查資料,結合有關專家多年的整治經驗,總結出壩體的損毀原因及影響因素;對現有塊體穩定性的研究成果進行回顧和總結,並針對散拋石壩的直接損毀現象,結合山區河流的流、地形特點,利用塊體粒徑與起動流速的關系,提出塊體穩定重量與起動流速高次方成正比的概念,流速50的增長可能導致塊體穩定重量接近40倍的變化;通過二維變坡槽試驗,研究了壩體穩定的主要影響因素,包括塊體重量、壩頂水深、斷面尺寸、塊體材料(塊石和卵石兩種) 、護底等,結果表明對于山區河流,試圖僅僅通過增加壩體單個塊體重量或斷面尺寸來提高壩體穩定性效果甚微;最後,根據西部地區的自然、經濟、交通等條件,提出可以採用柔性混凝土鉸鏈體等一類整體性較好的護面層作為散拋石壩的防沖毀措施,以期取得良好的工程效果。
  10. ( 2 ) in this paper, the author summarized the working principle, the superiority and the limitations of a few main kinds of classical sprinkler systems ; put emphasis on the importance of a few key points which is relevant to the function of the system, such as the choosing of sprinkler and it ' s fixing, the automatic checking function of water pump, the layout of alarm valve, especially the choosing of sprinkler and it ' s fixing ; looked through the feasibility of which we used water instead of gas by water mist especially finely divided water mist fire - extinguishing technique

    展望了噴霧技術特別是細霧技術進行以代氣滅火的可行性。 ( 3 )針對工程設計中最復雜,工作量最大的部分-系統力計算部分,在規范的基礎上,基於excel電子表格,提出了經濟流速的范圍,提供了一套行之有效的設計計算方法,同時,對屋頂水箱和增壓泵的設置這一難以解決的問題發表了見解,既確保了自動噴滅火系統初期快速滅火、控火的性能,又節省了大量的設計工作時間。
  11. Taking into account of water level and temperature, horizontal displacement monitoring control index of typical monolith of huangtankou concrete gravity dam is determined by the improved method of probability, which can be used as a reference for dam safety monitoring

    綜合考慮位溫度對壩體位移的影響,採用改進小概率法,擬定了黃壇口重力壩壩頂水平位移監控指標,為今後一定時段內大壩安全監控提供參考。
  12. In the days following the september 21 earthquake, a series of aftershocks occurred, and falling rocks often missed us only by inches. we needed god s blessings to go deep into the mountains and under hiers protection, our fellow practitioners, thinking little of themselves, ventured into remote mountainous areas where no one else went. these included small tribal villages in yuchih and tongkuang townships, chiufen s twin mountains in kuohsing rural township, pingting in shuangwen, the dam on shuili mountain, jenai rural township, and the hills in wushe

    921災變后的初期,餘震不斷,前腳剛走,后腳落石就掉下,深入山區是需要佛菩薩保佑的,我們同修傻傻的,在上帝的保佑下,足跡深入到沒人去的地方,如魚池鄉東光等各小部落,國姓鄉九份二山的山區爽文的平頂水裡山上的壩處仁愛鄉霧社的山裡,甚至我們部分的醫療人員也是翻山越領進入霧社山區去,后因山崩,坐救災直升機下山。
  13. The problems of the control and the matching between the winch and the friction wheels during up - going along the slope, horizontally passing over the hump and lowering down along the slope of the traction tracks for the elevator are discussed, from which the problems during the commissioning of the elevator are analyzed in detail as well

    文中探討了料坡式升船機沿斜坡上升、峰頂水平運行、沿斜坡下降等運行過程中的控制及絞車與摩擦輪的配合等問題,並對調試過程中出現的問題進行了詳細的分析。
  14. The emphasis is given on the studying of the horizontal displacement on the retaining structure consist of piles and anchors, which is a frequent type of retaining structure. it is founded that the rigidity of anchors and magnitude of pre - stress are the main factors which influence the deformation of retaining structures. the optimal design method on pile - anchor systems is presented

    樁錨支護是一種常見的基坑支護模式,本文以樁錨支護結構平位移為重點,對支護結構剛度、支撐剛度與預應力、支護樁入土深度等對樁頂水平位移的影響進行了分析,指出在樁錨支護體系中,錨桿支撐剛度及預應力對基坑變形的影響最為明顯,並通過工程實例加以驗證。
  15. It has also pounded the keys, devices, disposition of surveyed spots, measure method and procedures, data gathering and process ( relation with construction workmanship ), error analysis and adjustment, control precision and rules, mechanism and method of control, tables of records, results and discussion. after completion, the bridge has good behaviors in dead loads state, cable forces, shape style of main beam, stress and strain of concerned sections, displacements of the tower top, which assure the reasonable state of cables, main girder and towers, and safe under running, demonstrate supervision

    通過課題研究與實橋運用,荊州長江公路大橋斜拉橋施工過程各狀態和成橋恆載狀態下,斜拉索索力、主梁線形、主梁關鍵截面應變、索塔塔頂水平偏位等關鍵項目的施工控制結果均滿足設計期望值的要求,滿足橋梁施工范圍的要求,大橋主梁線形流暢,斜拉索、主梁和索塔三大體系的受力狀態合理,橋梁結構安全可靠,大橋的監測監控取得了圓滿成功,並為該橋營運階段的長期監測監控奠定了良好的基礎。
  16. 2. horizontal displacement variation rules according to water level and temperature are researched by analyzing that of huangtankou concrete gravity dam. 3

    通過對黃壇口混凝土壩平位移的變化過程分析,研究了壩頂水平位移隨位、溫度等環境量的變化規律。
  17. Options tilesfloorboard, glass door single piece 180 degree flat reinforce glass

    切割拼花地板玻璃轎門180度整塊玻璃。
  18. Under the lateral load, the positive battered pile has bigger bearing capacity than the vertical and the negative pile. the allowable settlement of the pile head is suggested and the vertical pile can bear load with inclination of less than 10, and the battered pile bearing vertical load can be angle of less than 10. then the paper employed the generalized elastic theory in pile group, considering the interaction between pile - soil

    就樁的豎向沉降而言,樁身的微小偏斜(小於10 ) ,對豎向受荷樁的正常使用沒有明顯的影響;傾角太大的斜樁承受豎向荷載的能力有所減少;直樁可以承受一定傾角(小於10 )的傾斜荷載,這時的傾斜荷載對樁的沉降影響較小,但樁頂水平位移增加比較明顯。
  19. Accordingly, solution for the dynamic response of grouped piles taking consideration of shear deformation was developed by using superposition principle, and the effects of shear deformation and the other factors on the horizontal displacement and the distribution of shear forces at pile head were investigated

    在此基礎上,利用疊加原理得到了考慮樁體剪切變形的群樁平動力響應解,並分析了剪切變形和其他因素對樁頂水平位移以及樁剪力分佈的影響。
  20. The workload was at its peak in 1935 and the number of workers had increased to 2, 160. the excavation work, which had previously relied on manual labour, now made use of explosives, however, workers were not accustomed to this method and there were a number of accidents caused by sudden or untimely explosions

    賓尼及迪勤公司( siralexanderbinnieson & deacon )的技術人員,以及曾蓋建星洲山頂水塘的南洋工人,參與興建計劃, 1935年為工程的高峰期,工人人數一度增至2 , 160人。
分享友人