頂部水 的英文怎麼說

中文拼音 [dǐngshuǐ]
頂部水 英文
over water
  • : i 名詞(人體或物體的最上部) crown; peak; top Ⅱ動詞1 (用頭支承) carry on the head 2 (從下面拱...
  • : Ⅰ名詞1 (部分; 部位) part; section; division; region 2 (部門; 機關或組織單位的名稱) unit; mini...
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • 頂部 : top; upper apex; top half; headpiece; roof; ridge; meplat (彈丸的)
  1. A dolphin breathes air through a hole called a blowhole. this blowhole is on the top of its head

    海豚通過一個稱為噴孔的洞呼吸。這個噴孔在頭的
  2. The water current flows over the top of the dentoid baffle to the hydraulic jump as additional momentum. while it is cooperated with a stilling basin, the flowing condition emerged in the basin may be improved greatly and the length and downstream water depth required by the basin can be decreased to a great extent. such an appliance may be also used to solve the problems of insufficiently dissipating water flow energy and aerating flow, which are often faced with those hydraulic engineering constraction as acted by high waterhead, great specific discharge and low froude number

    本文通過齒墩的擴散舌所形成的附加射流,從上射入躍,即可改善消力池內的流流態,又可降低第二共軛深,減小躍長度,增進躍消能效果,同時還能解決大單寬、低佛勞德數條件下摻氣和消能不足的問題,試驗證實它是一種安全、經濟的消能工。
  3. Gully tops class b 125, quadratic ; particulars

    B 125級正方形雨.詳細數據
  4. Gully tops class a 15, quadratic ; particulars

    A 15級正方形雨.詳細數據
  5. 4 bridges shall be deck type, through type or hybrid type ( with or without bracing ). for through or hybrid type with top bracing, the minimum vertical clearance shall be 4880 mm ( 16 ’ - 0 ” )

    鋼架橋為層式設計,直通式或復合層(可帶或不帶支柱) 。直通式或復合式要帶支柱,平空間最小為4880毫米( 16英尺) 。
  6. The resulting brightness temperature ( tb ), hydrometeor structure, and surface rainfall rate relations show that the ice hydrometeor, espatially the ice at the top of the precipitating cloud, decreases the brightness temperature significantly at 85

    結果表明,在85 . 5ghz ,冰相汽凝結體尤其是處于降的冰晶粒子由於散射輻射而使得亮溫顯著降低。亮溫與冰相粒子的含量之間有很強的相關性。
  7. They could hear an insistent booming sound which they found was caused by a small-spout shooting down into a pool from the roof of the cave.

    他們能夠聽到持續的轟響,這轟響,他們發現是從洞穴噴向潭的一個小噴孔所發出的。
  8. Cenotes are created when limestone in the cave system erodes and the roof collpases, forming a water - filled sinkhole

    當洞穴系統內的石灰巖發生腐蝕而且開始下沉的時候,就形成了盛滿湖或河的灰巖坑。
  9. The oozing out of a large quantity of muddy water from the base or the weep holes of a slope indicates that the slope is saturated with water

    斜坡底或疏孔有大量泥透出時,顯示斜坡內的份已飽和,斜坡之中段或有裂
  10. The fundamental ideas and methods of this paper are also illuminated in this chapter. in chapter two, a one - dimensional and semi - closed shallow sea mode is studied. the approximate analytical expressions of the water level at the top of the bay induced by the nonlinear interaction between the storm surges and the astronomical tides are obtained by using the perturbation method

    在第二章里,研究了一維半封閉域中的非定常風暴潮與天文潮非線性相互作用的問題,用攝動方法求出了具有實際意義的海灣位的一階近似解析表達式,並給出了增過程曲線。
  11. Loosen the screw holding the junction box cover to the top of the water heater. set the cover aside

    卸下熱接線盒蓋上的固定螺絲。把蓋子放在旁邊。
  12. This machine has high rotational speed, it is based on the common centrifugal separator, its novel design great enhances the speed of lowing the supplies. main applies : this machine is called throw liquid centrifugal separator, is suitable for clarifying drizzle drops of liquid that has floated, now it has been widely applied in the industries of medicine, chemistry and food industry, it can be used to separate materials before the process of the centrifugal separator of pipe type

    該機適用於對固相為顆粒狀的懸浮物的過濾,也可用於纖維及其紡織印染洗滌後有脫,物料從加入,由專用雙速電機通過三角膠帶,實現低速啟動,高速分離,使轉鼓形成離心力場,液相通過固相和濾網由下出液口排出,固相停機後由上取出。
  13. Some of the walls were made of glittering diamonds - so big. and some rocks were like crystals - so clear and sparkling like diamonds on top

    此外還有些墻壁是由閃爍的鉆石建造,非常的大,石塊像晶一樣剔透瑩徹,如鉆石般閃爍著光芒。
  14. In the condensed sections analysis, the concept of water - bearing lacustrine basin condensed sections and non - water - bearing basin condensed sections are firstly put forward, and have been described their features of lithology, mineral and geophysics, and have been predicted their distribution. meantime, this paper has studied the geochemical characters of source rocks, and contrast betwee

    同時,對有湖泊密集段進行了烴源巖地球化學特徵和烴源對比研究,確立了凹陷的含油氣系統;對無盆地密集段進行了蓋層封閉能力的研究,確定了含油氣系統的區域性蓋層及范圍。
  15. General drooping of the entire plant. . crown, stem or root rot - caused by overwatering, especially during the winter months when plants are dormant and do not need much moisture

    整株植物打蔫. . .、莖或根腐爛,澆過多造成,冬天植物處于休眠期,我需要太多分。
  16. Through discussion of numerical solution, the author get the effect of height of filled soil, size of culvert, width of valley, property of filled soil, construction procedure and techniques on soil stress of the culvert top ; 3. through the centrifuge test, the paper validates the reliability of numerical calculating on high - stack soil ; 4. the paper puts forward the simplified calculating method of soil stress of the culvert top on the foundation of numerical simulating and centrifuge modeling

    通過對數值解的討論,得到填土高度,涵洞截面尺寸,溝谷底寬度,溝壁坡角,填築體性狀,施工速度,地下對豎向位移場及涵洞土壓力的影響情況; 3通過離心機的模擬試驗,驗證了數值計算對高路堤的計算結果的可靠性; 4在數值模擬和室內離心機模型試驗的基礎上,提出了高填方涵洞土壓力簡化計算方法。
  17. Take the upper part of the bamboo shoots, score criss - cross cuts in the top to make orchid patterns, rinse in cold water, then steam till done

    筍尖取上段,從剖十字切成蘭花形,用涼漂凈後上籠蒸熟
  18. At hot end of beat pipe, several measures were taken to eliminate heat, namely ( 1 ) traditional sensible heat elimination ; ( 2 ) exhaust air is processed by air washer, then passes through hot end ; ( 3 ) exhaust air is handled by wet film, then passes through hot end ; ( 4 ) sprays water at the top of hot end, respectively

    第一級採用熱管式間接蒸發冷卻器,熱端布置4種散熱方式: ( 1 )傳統類型的顯熱散熱; ( 2 )排風經過噴室降溫后進入熱端; ( 3 )排風經過填料式直接蒸發冷卻器降溫后進入熱端; ( 4 )直接在熱端
  19. ( 三 ) under the dynamic load of the explosion, the numeric analysis has been done and achieve the rule as follow : ( 1 ) when the frequency of vibration is 0. 3hz, the acceleration of the slopes top gets the maximum ; so 0. 3hz is believed the natural frequency of the slope as a whole ; ( 2 ) the vibration of explosion can been magnified because of the condition of the landform, when the relative altitude is up to 45m, the acceleration of horizon gets the maximum ; when the relative altitude is up to 100m, the absolute value of acceleration and the deformation of horizon is larger than that in the bottom of the slope ; ( 3 ) in the period of forced vibration, at the top of the slope, the acceleration of horizon become larger and larger ; at the middle part of the slope, it becomes smaller ; ( 4 ) when the explosion velocity of is much little, the shallow part destruction is the primary deformation of the slope

    (三)採用模態疊加法針對爆破動力作用,進行邊坡的動力響應分析,得出了以下結論: ( 1 )振動頻率為0 . 3hz時,坡面頂部水平向加速度峰值最大;綜合考慮,可認為該邊坡的自振頻率為0 . 3hz左右; ( 2 )地形對爆破地振動存在放大作用,研究剖面的坡面,平向加速度及位移在地形相對高差45米左右最大,而後隨相對高差的增高而減小,相對高差為100米時,平向位移及加速度絕對值均大於坡腳; ( 3 )強迫振動段,平向加速度值隨時間變化的規律為:坡節點總的變化趨勢是越來越大,而坡體中節點的變化趨勢是越來越小; ( 4 )當爆破振速較小時,變形破壞的形式表現為坡表面滑塌型。
  20. It will appear horizontally across the top of the page

    它橫跨頁的頂部水平顯示。
分享友人