頂部 的英文怎麼說

中文拼音 [dǐng]
頂部 英文
top; upper apex; top half; headpiece; roof; ridge; meplat (彈丸的)
  • : i 名詞(人體或物體的最上部) crown; peak; top Ⅱ動詞1 (用頭支承) carry on the head 2 (從下面拱...
  • : Ⅰ名詞1 (部分; 部位) part; section; division; region 2 (部門; 機關或組織單位的名稱) unit; mini...
  1. The roof is acid-resistant concrete and carries the acid distributor and its drive.

    頂部有耐酸混凝土,裝有酸分器及其傳動分。
  2. In the early december, the first bract primordium was formed in the axil scale at the cone base, then bract initiation had occurred in acropetal direction

    12月初,最初的苞片原基在雌球果原基的鱗片的葉腋處產生,之後其由基頂部連續發生。
  3. The reservoir - formed dynamic system could be divided into lower self - source enclosed type, middle allo - source to self - source semi - full enclosed type and upper allo - source semi - open enclosed one

    成藏動力學系統可分為下自源封閉、中它源-自源半封閉-封閉及頂部它源開放-半封閉三種類型。
  4. The cable stays converge to a single point on the apex of the tower.

    綱索在塔架頂部集中在一點。
  5. It fills and expands the apical portion of the cell and forces the nucleus into the slender basal portion.

    它充滿並推向細胞的頂部,迫使核移向狹窄的基
  6. The top of the flow was armoured with boulders.

    泥石流的頂部布滿了漂礫。
  7. The snout and the top of the flow behind the snout, typically were armoured with boulders.

    泥石流的鼻及鼻后的頂部都布滿了漂礫。
  8. Located atop the s-ivb, which is the third stage of the saturn v, is the guidance and control equipment for the launch vehicle.

    安裝在「土星V」第三級S-IVB頂部的是發射飛行器的導航和控制設備。
  9. On most automotive battery grids, cooling is required in the top gate area and in the center of the mold only.

    絕大分汽車蓄電池板柵尺需要在頂部澆口分和模具的中心冷卻就可以。
  10. Amore 2001 has successfully investigated the gakkel ridge and arctic ocean in vicinity of its geological and geophysical nature, as well as the nature of sea ice and biology in this area. the preliminary onboard petrology and bathymetry results show that the mantle beneath the gakkel ridge with low temperature has only encountered very low degree partial melting during the spreading and there is no any direct relationship between the crust nature and the spreading rate along the gakkel ridge in any simple petrologic way. mantle temperature and fracture zone density also play a major role on the crust nature, besides spreading rate

    對所取得資料的初步研究表明gakkel洋中脊之下的地幔僅經受了較低程度的分熔融,具有較低的溫度。 gakkel洋中脊處的地殼性質和巖漿活動與擴張速率之間不存在任何直接的巖石學相關性,擴張而導致的巖石圈頂部的冷卻並不是決定洋脊處地殼性質的最重要因素。地幔溫度和斷裂帶的存在與否及其密度對地殼性質具有重要的影響意義。
  11. It is 1. 5 metres high and bent near the top.

    它高15米在近頂部處彎折。
  12. In it is a small pastry brush with which berger gently wipes the top of every main course whether it is the more expensive sea bass with fennel, the blackleg chicken with morels or the sausages served with mash

    盤子里有一個糕點小刷子,伯傑用其在每道主菜的頂部輕輕刷上一遍,不管這道主菜是昂貴的茴香鱸魚、羊肚菌雞肉,還是臘腸肉末。
  13. Due to the multi - period tectonic movement and evolution of mechanical mechanism, syndeposition structures occur extensively in jiyang sag, the base of the sag subsided alternatively during the fault depression, which resulted in sinking of top bending and complicated block structure accordingly, reconstructed the syndeposition intensively, and produced the special structural landscape in combination with all levels of faults and sedimentary formations within it

    摘要濟陽坳陷由於受到多期構造運動的影響,在前第三系古地形高點背景上廣泛發育同沉積背斜構造,然而由於坳陷在斷陷期基底滾動式沉降,造成撓曲頂部的塌陷,形成復雜的塊斷結構,使本區同沉積構造發生強烈改造,往往與各次級斷層或沉積地層相復合,表現出獨特的構造景觀。
  14. A dolphin breathes air through a hole called a blowhole. this blowhole is on the top of its head

    海豚通過一個稱為噴水孔的洞呼吸。這個噴水孔在頭的頂部
  15. In the course of studying the fibre parameter in different development period, it was discovered that the rod density increased from the top to the middle of the boule

    考察纖維參數在不同生長階段的分佈規律發現,從頂部到中段纖維密度增大,從中到根纖維密度基本不變化。
  16. Observations indicate that breakup occurs not by collapse of the bubble roof but by the bottom being drawn up into the bubble.

    觀察指出破裂的發生不是由於氣泡頂部的崩潰,而是由於其底被向上曳入氣泡。
  17. On canvas tops, dry using a synthetic chamois or microfibre towel. on vinyl tops, a synthetic chamois or microfibre towel also work well

    在褶蓬的頂部,用合成軟皮革或微纖維紙巾使其乾燥。在聚氯乙烯的頂部,用上述兩種產品也可以。
  18. The mitral - valve tenting area was also measured and used as a quantitative index for leaflet stiffening and apical displacement of leaflet coaptation

    對二尖瓣幕狀區也進行測量,作為定量參數評價發生瓣葉僵硬和瓣葉接合處頂部移位。
  19. The non - condensable gases accumulate near the top of the secondary condensing bundles and are drawn into the air take - off manifolds running along the top of these secondary bundles

    不可冷凝的氣體在二次冷凝管束頂部附近匯集,被吸入二次冷凝管束頂部布置的空氣集管內。
  20. Cell connectors and terminal post burning must be done in such a manner that there is complete fusion of the post strap top and the cover lead bushing with the connector ring or terminal post.

    連接條和接線柱的焊接必須使極柱頂部和蓋子的鉛襯套與連接條環口或接線柱完全熔焊牢固。
分享友人