項目評估 的英文怎麼說

中文拼音 [xiàngpíng]
項目評估 英文
project appraisal; project evaluation
  • : Ⅰ名詞1 (頸的後部) nape (of the neck) 2 (款項) sum (of money) 3 [數學] (不用加、減號連接...
  • : Ⅰ名詞1 (眼睛) eye 2 (大項中再分的小項) item 3 [生物學] (把同一綱的生物按彼此相似的特徵分為幾...
  • : Ⅰ動詞1. (評論; 批評) comment; criticize; review 2. (評判) judge; appraise Ⅱ名詞(姓氏) a surname
  • : 估構詞成分。
  • 項目 : item; article; clause; subject of entry; [體育] event
  • 評估 : estimate; assess; appraise
  1. Preparing market research report, project evaluation, feasibility study, contract, articles of association, agreement and other lated documents

    為投資人在西部投資作前期市場調研,項目評估,提供投資方案、草擬可行性研究報告、合同、章程、協議等文件。
  2. Developing straegy research industry planning ; project evaluation and project consulting & design in non - metallic minerals such as graphite, kaolin, talc, attapulgite, bentonite, sillimanite gypsum etc

    對石墨、高嶺土、雲母、滑石凹凸棒土、膨潤土、硅成石、石膏等非金屬礦發展戰略研究,行業規劃。工程項目評估工程設計,技術咨詢。
  3. It is not only influnce the survival of valin group but also influnce the industrialization progress of hunan province. this book appraised the foreground of the product market, raising money and using money, budget and potential risk of this project by using the method of project evaluation, analysised avail factor and disadvantage factor, then bring forward measures of evading project risk to help erector and bank who provide a loan

    本文運用項目評估方法,對華菱薄板的產品市場前景、資金籌措與運用、財務預測與分析及潛在風險等方面進行價,分析建設的有利因素和不利影響,得出結論,提出規避風險的措施,為建設單位及資金承貸銀行提供指導和幫助。
  4. The strategy, planing and policy of environmental protection for electric power ; electric power environmental protection engineering evaluation ; scientific and technological system reform and management

    電力環境保護發展戰略、規劃、政策研究咨詢;電力環保工程項目評估價;科研院所科技體制改革及其管理咨詢。
  5. Firstly, the theory summarize of r & d project evaluation and performance measurement are done, the limitation and shortage of traditional evaluation and measurement is pointed out ; afterward, the purpose and content, the methodologies and classify, the basic principle and work procedure, the reporting and organizing are dissertated ; and then, the influence factor and the main parameter of the r & d project performance measurement are analyzed, the index of performance measurement are discussed emphatically, based on this, a dynamic and effective r & d project performance measurement system is developed, it comprises designing, implementing and updating performance measurement systems ; at last, the development current of r & d project evaluation and performance measurement is discussed and the conclusion of this paper is made

    首先,本文對r & d項目評估和績效測度進行了理論綜述,指出了傳統與測度的缺陷與不足;然後,論述了r & d項目評估的和內容、方法和分類、基本原則和工作程序、組織與報告工作;其次,分析了r & d績效測度的權變因素和主要參數,重點探討了測度指標,並在此基礎上開發了一個動態有效的r & d績效測度系統,包括對r & d績效測度系統的設計、實施和更新;最後,探討了r & d項目評估與績效測度的發展趨勢並得出了本文的結論。
  6. These documents include : ( i ) chinese - english translation : project proposals, project feasibility study reports, environment assessment reports, resettlement action plans, bidding / bid documents, bid evaluation reports, etc. ( i ) english - chinese translation : project appraisal document, project post - evaluation report, loan agreement, project agreement, aide - memoirs of project supervision missions, consultation proposal for technical assistance, consultation reports, etc

    這些文件包括:漢譯英:建議書、工程可行性研究報告、環境影響價報告、移民行動計劃、招標投標文件、標報告等;英譯漢:項目評估文件、文件、貸款協定、協定、檢查團備忘錄、技援咨詢建議書、咨詢報告等。
  7. Evaluation of engineering project, engineering design for building structure and power epuipment foundation, supervise administration of construction, improvement of complex engineering soil, consultative projects for the special building

    工程項目評估,建築結構設計,動力設備基礎設計,工程監理,復雜工程地基處理,牿建構築物技術咨詢。
  8. In subsequent developments of this work, sir james mirrlees has set up criteria for evaluating projects based on the desirability of efficiency in production

    莫利斯爵士其後的著作里進而建立以生產效益為基礎的項目評估準則。
  9. Be good at the program of the area and trade inthe concudtation of making pllicy engineering the engineering project comment, the technical concultation on the trade of clectronics. information and computer

    從事決策咨詢中的地區,行業規劃,工程咨詢中的工程項目評估,技術咨詢中的電子、信息、計算機行業的業務。
  10. Major in programme, studying of medium and long - term development plans, consultation and estimation of projects, working out the bidding document and price, examination of the construction cost, supervision of costruction and project auditing for water conservancy field

    主要從事省級以下水利及相關行業規劃,中長期發展計劃戰略研究:工程項目評估,標書標底編制,工程造價審核,工程監理;工程審計。
  11. Project assessment, feasibility analysis, designing, installation, commissioning of auxiliary control system in power plant, include ash & slag system, coal conveying system, water treatment system, oil conveying system, auxiliary boiler etc

    電廠輔助控制系統(灰渣、輸煤、化學水處理、燃油、輔助鍋爐等)的項目評估,工程造價、設計、安裝、調試。
  12. A virtual living textbook of fashion creation, history and marketing, it utilizes the enormous range of assets available in paris, the fashion capital of the world. students are taken beyond the surface glamour and exposed to the day - to - day workings of the industry. from an honest, generous and open vantage point the doors into this exciting and intoxicating world are thrown open to the student, with field trips to venues which reveal a multitude of possibilities pertinent to the fashion industry amongst the studios, couture houses, designer showrooms textile mills and press offices

    Mod art擁有多樣化的專業課程,教學部分分成5個系:時裝預科及藝術預科系,時裝設計系,時裝製作系,時裝附件系帽子首飾皮革製品鞋靴等,時裝管理系時裝商學院.為保證學生被提供教學的質量能適應經濟的發展,學校還設有專門的學術委員會以確定各階段的教學,科研方向及項目評估政策,從而保證完善的教學質量
  13. Based on the actual condition of gezhouba hydroeletric power plant, this paper points out the basic way for unit increasing capacity rebuilding of this plant after serious analysis and site review of lots of information of unit increasing capacity of hydroelectric unit at home and abroad. for this rerebuilding plan, we have made a lot of experiment and analyzed the data, the result show that the unit increasing capacity is necessary and feasible in this plant, additional, this paper describes project management, organization struture, management method, and evaluates this project value

    本文對國內外眾多水電機組增容改造資料進行了認真研究和實地考察;通過對水力發電機組增容改造技術的研究,結合葛洲壩電站實際情況提出了葛洲壩電站機組增容改造的基本途徑;針對葛洲壩電站機組改造方案,進行了大量的試驗,認真分析了試驗數據,用試驗結果充分證明了葛洲壩電站機組增容改造的必要性和可行性;本文還就該工程管理的必要性、組織結構、管理方法進行了闡述,並對該進行了項目評估
  14. The purpose of this artile is to study the evaluation theory and methods based on the former study from the view of the cognition essense of evaluation and the feature of the factors in s & t evaluation system

    分析了客體的屬性、標系統及標準系統的特點,找到了主觀價法在科技計劃項目評估中起主導作用的原因。
  15. Conduct market and project evaluation analysis as well as day - to - day operational management

    管理市場、項目評估和日常的運營管理。
  16. Application of economic value added in project evaluation

    項目評估中應用經濟增加值指標
  17. Estimation feasibility bid procurement, construction supervision thermal & nuclear power project, design inspection equipment operation management for elec. system

    火電與核電工程項目評估、可行性研究、招、投標、采購及工程施工監理,發電廠電氣設備與系統設計審查、安裝、調試、運行與管理。
  18. Discussing the management after the risk investment

    考慮風險因素設計項目評估決策指標
  19. Project evaluation, bid preparation, engineering design, budget review, technical consultation for projects of sulfuric acid and its derivatives

    從事硫酸工程及硫酸延伸的精細化工產品的工程項目評估、標書編制、工程設計、造價的審核,並從事上述新建、改造的技術咨詢。
  20. Finacial consultation ; diagnosis ( analysis ) on enterprises business ; qualified examing for enterprises ; evaluation for enterprise project

    金融類咨詢,企業經營診斷,企業信用級,企業項目評估
分享友人