順序實驗設計 的英文怎麼說

中文拼音 [shùnshíyànshè]
順序實驗設計 英文
sequential experiment design
  • : Ⅰ介詞1 (向著同一個方向) in the same direction as; with 2 (依著自然情勢; 沿著) along; in the d...
  • : Ⅰ形容詞1 (內部完全填滿 沒有空隙) solid 2 (真實; 實在) true; real; honest Ⅱ名詞1 (實際; 事實...
  • : 動詞1. (察看; 查考) examine; check; test 2. (產生預期的效果) prove effective; produce the expected result
  • : Ⅰ動詞1 (設立; 布置) set up; establish; found 2 (籌劃) work out : 設計陷害 plot a frame up; fr...
  • : Ⅰ動詞1 (計算) count; compute; calculate; number 2 (設想; 打算) plan; plot Ⅱ名詞1 (測量或計算...
  • 順序 : 1. (次序) plain sequence; subsequence; order; sequence; succession2. (順著次序) in proper order; in turn
  • 設計 : devise; project; plan; design; excogitation; layout; layout work; styling
  1. 3 ) the content of generator module design includes the design factor, design outline, software design and experimentation. the generator module must complete the analog signals calculating, and make an order for shutting off connected generators in the condition of generators settings, concatenated logics and switch signal input, then communicate with the decision module

    3 )發電機模塊的內容包括考慮因素、要點、軟體以及證等,模塊必須完成對接入的發電機機組模擬量的算;在機組置、連鎖邏輯和開入信息等條件下對接入的發電機機組排出一個切機;完成模塊間通信。
  2. In chapter 4 we discuss the design of the high speed and high performance vlsi and its imp1ementation, firstly we ana1yze and compare the features and ru1es of al1 kinds of fft algorithm, adopt complex radix 4 butterfly calcu1ation as basic alu, then discuss all kinds of process architectures, the design thoughts, rule, method, technique way, the characteristics of the design are r4 dit algorithm, pingpong ram design method and pipeline structure between stages. we also analyze the limited word length effect and the method to avoid overflow of the fixed points fft process, bring out the expandable platform mode

    第四章主要討論了高速高性能的快速傅立葉變換處理器的現,首先分析和比較了各種快速傅立葉變換演算法的特性和規律,提出基4蝶算的演算法具有最好的性價比,討論了、級聯、并行和陣列的處理結構,闡述了高速高性能快速傅立葉變換處理器時的原則、思路、所採用的技術路線,證並測試fft處理器,分析了定點fft處理過程由於有限字長效應所產生的量化誤差的范圍及防溢出控制辦法,提出了可擴展平臺模式。
  3. This paper, through the research on the implementing of gaobazhou water conservancy project, demonstrated that the project is technical feasible, economic reasonable, and is conform to the state macro policy in external environment. described the full - aspect management on the design process of gaobazhou water conservancy project, fully demonstrated that the selection of design scheme and the design quality is directly related to the investment, quality and progress control of the project ; described the full - aspect management on the construction process of gaobazhou water conservancy project, discussed the management procedure and manner of supervisor in the construction process, how does the contractor to complete construction task scientifically and reasonably by following the certain supervision procedure based on the contract ; described the management on the procurement of gaobazhou water conservancy project, clarified these cautions to be taken during material and equipment procurement through the discussion on the content of procurement contract ; described the project acceptance and after - event evaluation of gaobazhou water conservancy project, fully defined the content for the final acceptance of the project ; fully described the comprehensive management carried out on gaobazhou water conservancy project, mainly focused on the study of information management, communication management, conflict management and risk management, which ensured the smooth execution of the project

    本文通過對高壩洲水利樞紐工程項目施的研究,論證了高壩洲水利樞紐工程項目在技術上是可行的,在經濟上是合理的,在外部環境方面符合國家的宏觀政策;闡述了高壩洲水利樞紐工程過程的全面管理,充分論證了方案的選擇及質量的高低,直接關繫到工程項目的投資、質量和工程進度的控制好壞;闡述了高壩洲水利樞紐工程施工過程的全面管理,論述了監理在施工過程中的管理程和方法,施工單位遵循一定的監理程,依據施工合同科學合理地完成施工任務;闡述了高壩洲水利樞紐物質備的采購管理,通過對采購合同內容的論述,明確了物質備采購時應注意的問題;闡述了高壩洲水利樞紐工程項目收及后評價,明確了高壩洲水利樞紐工程項目竣工收的內容;較全面地闡述了高壩洲水利樞紐工程項目施的綜合管理,重點研究了保證高壩洲水利樞紐工程項目施的信息管理、溝通管理、沖突管理和風險管理。
  4. Based on the former researches and aiming at the practical application and the software development ability, a set of dfd methods are put forward, including the disassembly sequence planning based on the engineering semanteme, the direction reasoning based on the assembly constraints, the assessment algorithm of disassembly ability based on the experiment data, and the redesign for disassembly based on feedback figures and tables

    論文基於前面的系統建模研究,以具有強的際應用和軟體開發能力為目標,論文提出了一套完整的可拆卸性方法,包括基於工程語義的拆卸規劃、基於裝配約束的方向推理和基於數據的可拆卸性評價演算法,以及基於圖表反饋的可拆卸性再方法。
  5. The results show : " reverse reading instruction sequence ", " structure - oriented " teaching methods, and teaching focus on the match with difficult exercises in the triple jump shariah means all organic combination of experimental design achieved the expected results

    結果表明: 「逆向疊加教學」 、 「結構定向」教學方法、與教學重點與難點相匹配的練習手段三者有機組合的三級跳遠教法效果達到了預期目的。
  6. Its main designed functions are as following : display, note and print instantaneous torque value and the biggest torque value ; sequentially display, register, and print torque values ; amend, store and print date ; overrun alarm etc. the experimental results show that the figures and functions of the developed intellectualized torque wrench calibrating apparatus is in accordance with the desogn specifications, and a kind of torque wrench calibrator, which can calibrate vastly and quickly, is applied for corporations producing torque wrench

    其主要功能是:顯示、記錄、列印瞬時扭矩值和最大扭矩值;顯示、記錄、列印扭矩值;修改、存貯、列印日期;超限報警等。結果表明,研製的智能扭矩扳手檢定儀各項技術指標和功能達到了要求。為扭矩扳手生產企業和使用扭矩扳手的企業提供了一種大量快速檢定的智能式扭矩扳手檢定儀
分享友人