順序尺度 的英文怎麼說

中文拼音 [shùnchǐ]
順序尺度 英文
ordinal scale
  • : Ⅰ介詞1 (向著同一個方向) in the same direction as; with 2 (依著自然情勢; 沿著) along; in the d...
  • : 尺名詞[音樂] (中國民族音樂音階上的一級 樂譜上用做記音符號 參看「工尺」) a note of the scale in ...
  • : 度動詞[書面語] (推測; 估計) surmise; estimate
  • 順序 : 1. (次序) plain sequence; subsequence; order; sequence; succession2. (順著次序) in proper order; in turn
  1. Above all, this paper discusses the frame, system functions, user demands, construction preconditions and conformity planning based on the introduction of study and application situation ; then, planning project, planning process and foundation of guidance system in grades, including guidance strategy in four grades are studied ; whereafter, the thesis analyzes setting requirements and modes, installation angle, dimension and colour, display contents and arranging sequence and fonts of parking guidance sign, it is mainly studied that calculational method of distance between the variable message signs

    本論文首先在介紹停車誘導系統研究與應用情況的基礎之上,論述系統框架結構、系統功能、用戶需求、建設停車誘導系統的條件與停車誘導系統與智能交通系統的整合規劃等問題;接下來制定了停車誘導系統規劃方案,提出區域性停車誘導系統規劃步驟,研究分級誘導體系的建立方法,提出四級誘導策略;然後分析停車誘導標志布設的具體要求、設置方式、安裝角寸與顏色、顯示內容及排列、字體等問題,重點研究並給出可變信息板設置間距的計算方法。
  2. Experimental results show that the order of fluoride salt being put in and flux type also influences the phases constitution, morphology, distribution and absorbent rate of ti and b. the experiments on remelting master alloys and al or al alloys at a certain temperature range show that the phases constitution and size have a remarkable heredity

    試驗結果表明,不同的氟鹽加入和熔劑種類的不同也直接影響著中間合金中化合物的相組成、形態、分佈以及中間合金中ti 、 b的實收率等。在用純鈦顆粒法制備中間合金時,熔煉溫的改變只能影響tial _ 3晶體的寸大小,而無法改變其形態。
  3. In order to achieve the optimized tunneling approach, first, tunneling procedures, shift length, horizontal jet grouting length, bench length and space length between c and d part of crd method are optimized ; on the basis of these results, two kinds of tunneling schemes are calculated with three - dimensional fem and the optimized tunneling scheme is achieved. as results of the optimized scheme, the conclusion is made that the gas pipe above the tunnel of sk3 + 355 section is secure. the calculation results are verified through comparison of numerical simulation results and site - monitoring measurement data

    為得出適合本段工程的最佳施工路線,利用大型有限元通用軟體ansys對開挖、開挖進、水平旋噴長、臺階長及crd工法施工的c 、 d部相錯長進行了有限元數值模擬和優化分析,並利用這些分析結果,進行了兩個施工方案的三維有限元動態施工模擬,得出了較優的施工方案,並利用施工后的地表沉降槽曲線,對sk3 + 355斷面處隧道上方的煤氣管線的安全性進行了分析,得出了利用此施工方案施工不會造成此處煤氣管線破壞的結論。
  4. The contents include as follows : the influencing factors of the displacement ductility factor of the unbonded partially prestressed concrete frame structures, such as stirrup reinforcement characteristic value, nominal shear span ratio, axial compression ratio, the appearing order of plastic hinges and partial prestressing ralio ( ppr ) are discussed. the formula of displacement ductility factor of the unbonded partially prestressed concrete frame structures is suggested by regression analysis. with regard to the aseismic design and the request of ductility and energy dissipation, the restriction of the flat - beam / column sectional size and aseismic reinforced design are discussed

    本文主要包括以下內容:討論了配箍特徵值、名義剪跨比、軸壓比、塑性鉸出現、預應力等因素對無粘結部分預應力混凝土框架位移延性系數的影響,回歸了考慮影響因素的位移延性系數計算公式;對無粘結部分預應力混凝土扁梁框架結構,闡述了抗震設計對扁梁、柱截面寸的要求與限制;對滿足延性和耗能要求的無粘結部分預應力混凝土扁梁控制截面抗震配筋進行了探討;通過對無粘結部分預應力混凝土扁梁梁端的受力分析,改進了以往扁梁梁端扭矩設計值計算公式。
分享友人