順序測試 的英文怎麼說
中文拼音 [shùnxùcèshì]
順序測試
英文
sequential testing- 順 : Ⅰ介詞1 (向著同一個方向) in the same direction as; with 2 (依著自然情勢; 沿著) along; in the d...
- 測 : 動詞1. (測量) survey; fathom; measure 2. (測度; 推測) conjecture; infer
- 試 : 名詞(古代占卜用的器具) astrolabe
- 順序 : 1. (次序) plain sequence; subsequence; order; sequence; succession2. (順著次序) in proper order; in turn
- 測試 : test; testing; checkout; measurement
-
In the course, the condition and the process of forming and changing of minerals, the typomorphic features of minerals, the characteristics of the distribution and the evolution of minerals and their paragenetic associations in the period and the space, the methods of mineral analyses and research, the geological thermometers and the geologicial barometers of minerals, mineral paragenetic associations and paragenesis analyses will be introduced, and the magnificent and the microscopic genetic characteristics of pyrite, quartz, garnet, pyroxene, amphibole, mica, feldspar, and other minerals will be dealt with particularly
本課程主要講述礦物及其共生組合的形成和變化的條件和過程,不同物理化學條件下礦物的成分、結構、形態、物性等標型特徵以及它們之間的內在聯系,礦物及其共生組合在時間上和空間上的分佈和演化規律,礦物成分、結構、形貌、物性等的分析測試方法,礦物地質溫度計和地質壓力計對其形成環境的表徵,不同體系(封閉體系、開放體系)條件下,礦物的穩定范圍和彼此替代順序的共生分析,重點介紹黃鐵礦、石英、石榴石、輝石、角閃石、雲母、長石等礦物(族)在成因上的宏觀標志和微觀信息,以及其成因信息在成巖作用和成礦作用中的地質意義。Then following reality constituent of engine and connecting component interface, a nonlinear signal cylinder engine model has been created, though fire interval and fire order, a control - oriented four cylinders engine is build. following dynamometer is seen as load, performance of engine is simulated and researched under the condition of constant torque and speed, validation of the math and simulation model have been confirmed by comparison result between simulation with test result of engine performance simulation software dyno
按照發動機的實際組成,根據各部件的介面類型連接模型庫中的部件,建立了單缸發動機非線性模型,在此基礎上,依據發動機實際發火間隔和順序,建立了面向控制的四缸汽油機模型,並以測功器為負載,通過恆轉矩和恆轉速方式進行了發動機性能模擬和研究,模擬結果和發動機動力性能模擬軟體dyno測試結果的對比驗證了數學模型和模擬模型的正確性。Place all testing devices on the testing machine in the following order : bearing plate, emery cloth ( with the granular surface facing upward ), the resilient pad to be tested, emery cloth ( with the granular surface facing downward ), short rail ( make sure the short rail is placed within the action area of the resilient pad to be tested )
把試驗裝置安放在試驗機上,安放順序為:支承鋼板、砂布(有砂粒面朝上) 、被測彈性墊層、砂布(有砂粒面朝下) 、短鋼軌(確保短鋼軌放置在被測軌下彈性墊層起作用的區域) 。2. ns - 4688tests bnc, rjh and rj45 ; ns - 468 tests rj 11and rj45 ; ns - 468n tests rj45 and bnc, st - 248 tests rj45 and bnc, st - 248 tests rj45 and bnc. ii. test of double - twisted cables ; switch on the power. s is slow and remote tester. the lights of the main tester will turn on. sequently from 1 to g
3在接線正確的情況下,則主測試器指示燈和遠程測試器指示燈從1至8順序逐個閃亮並循環,若gnd連線,則指示燈從1至g按順序逐個閃亮。The findings : the hippocampus is involved in processing memory for context ; the anterior cingulate cortex deals with retaining memories of unpleasant stimuli ; the amygdala consolidates memories more broadly and influences the storage of both contextual and unpleasant information
測試結果表明,老鼠大腦的海馬區參與了記憶內容的處理過程而前扣帶腦皮質主要負責記憶不快樂的刺激杏仁核存儲的記憶則更為廣泛,它影響記憶內容的先後順序以及不快樂刺激的存儲。Numerous laboratory investigations were carried out to enable operating strategy to be formulated, including rig experiments to examine the effect of formed coke on stack permeability with various burdens, model work to determine optimum charging sequences for coke and briquetts with the selected burden, pilot - coke - oven trials to determine the most suitable coal blend for the base period coke
為了使操作可以程式化,我們已經進行過許多實驗性研究,包括用鉆探試驗來檢測型焦在不同負荷下對疊加浸透性的影響,用模型製作來確定在特定負荷下焦炭和煤磚的最佳加料順序,和用先導煉焦爐試驗來確定基期焦炭所需的最適合的煤混合量。Ordered tests have the extension. orderedtest
順序測試的擴展名為. orderedtest 。An ordered test guarantees a specific execution order
順序測試可保證一個特定的執行順序。The ordered test is ready to run
順序測試已經就緒,可以開始運行了。The ordered test opens in the main document editing window
將在主文檔編輯窗口中打開該順序測試。For ordered tests, i want to know
對于順序測試,要了解:Viewing the results of ordered tests
查看順序測試的結果An ordered test can contain any test type except load tests
順序測試可包含除負載測試之外的任何測試類型。En 1414 touch and close fasteners - cycling procedure for subsequent testing
觸模式拉鎖.順序測試的循環程序How to : create an ordered test
>如何:創建順序測試You can add the same test multiple times to the same ordered test
可以將同一個測試多次添加到相同的順序測試中。Xitron ballast analyzers have the speed and versatility to completely change the way ballasts and tubes are being tested
Xitron鎮流器分析儀擁有其處理器與軟體從而提供順序測試,控制電源來源及使測量同步化于負載功率應用Leaving continue after failure unchecked means that the ordered test will stop running after the first occurrence of a test failure
不選中「失敗后繼續」表示在首次發生測試失敗后,順序測試將停止運行。An ordered test contains other tests that you want to run in a specific order
順序測試包含要以特定順序運行的其他測試。A container test, specifically a load test or an ordered test, is empty and therefore could not be run
由於容器測試(具體是指負載測試或順序測試)是空的,因此無法運行。分享友人