預前期 的英文怎麼說

中文拼音 [qián]
預前期 英文
antephase
  • : Ⅰ副詞(預先; 事先) in advance; beforehand Ⅱ動詞(參與) take part in
  • : Ⅰ名詞1 (在正面的) front 2 (次序在先的) first; top 3 (過去的; 較早的) ago; before; preceding...
  • : 期名詞[書面語]1. (一周年) a full year; anniversary 2. (一整月) a full month
  1. Tang shan area of price of pink of this iron essence reduce small, the impact is not big for large to those steelworks, because their early days had prepared many store up goods, and the phenomenon that depends on entrance mine is more and more apparent, but it may be said is deadly biff for the trafficker that has merchandise on hand to still be being put in the hand

    唐山地區此次鐵精粉價格的小幅下調,對于那些大型鋼廠來說影響不大,因為他們已經備了大量的囤貨,且依靠進口礦的現象越來越明顯,但是對于手中還存有現貨的貿易商來說可謂是致命的一擊。
  2. Japanese media had said last week that kiko, 39, was likely to give birth in a caesarean operation around sept. 6, ahead of her late september due date

    日本傳媒上周早已經指稱說, 39歲的紀子,實在很可能會在9月6日後以剖腹生產手術來分娩,她的9月底面。
  3. Slots are opened up one calendar month in advance

    申請中心會提一個月公布遞交申請的
  4. Dan falkner said the for his son was july 14 but had to be moved up

    丹說,她的應該是7月14日,但不得不被提了。
  5. Dan falkner said the due date for his son was july 14 but had to be moved up

    丹說,她的應該是7月14日,但不得不被提了。
  6. The work of pre - project : the feasibility report has been completed. the project has passed the environmental judgement, the foundation selecting and the prejudication

    項目工作:已完成可行性研究報告,並通過環評、選址、審。
  7. In " the campus visiting " the earlier period, propagandizes and conducts the correlation with emphasis the preheating course

    在「校園訪問」,重點宣傳並舉辦相關的熱講座。
  8. Taking into account weather and flood forecast information ; the forecast operation manner is studied under the condition of without the change of the existing flood control standard to realize the conversion of flood control and benefits. ( 4 ) through analyzing runoff and water utilization information during reservoir operation, design flood, and the existin

    水庫汛陽水位動態控制方法研究及其風險分析根據水庫流域天氣報、流域降雨、水庫蓄水、水庫泄水能力和防洪興利要求,利用水庫汛限水位變動范圍,結合洪水報和短降雨報模型,研究水庫汛限水位動態控制方法。
  9. The article structure the landslide prevention and cure, the structure of prestress anchors and its application in detail. basing on the geology condition of fabricating yard, we calculate the solid power and the length of anchor rope. we have worked out the experiment research scheme, and has carried on the earlier stage experiment, field demarcation experiment and has opened pulling the experiment on the spot. ten teams of steel rope to two teams of structure types twist the experimental data that thread internal stress and the total pulling force has been in progress research, and has put forward raising the measure of solid capability of prestress anchor and administering possessing

    本文以川藏公路滑坡路段為研究對象,對滑坡的治理、應力錨索的結構、作用及其在滑坡防治中的應用進行了詳細的分析;基於施工現場的地質條件,對錨索錨固力及錨索最佳錨固段長度進行了理論計算;制定了實驗研究方案,進行了實驗、現場標定實驗、實地張拉實驗;對兩組結構型式的十組鋼絞線內應力及總張拉力的實驗數據進行了研究,提出了提高應力錨索錨固性能的措施,以及具體的施工方案和施工工藝。
  10. This system can be used to monitor the change in the underwater ground profiles during the geotextiles - laying process. all the data related to the process is recorded by the system. the system can predict and analyze the ground sections that have potential impact on the geotextiles - laying, and improve the quality of the geotextiles - laying

    通過水深監視系統,操作人員可以掌握鋪排過程中水下地形的變化情況,對可能影響鋪排效果的地段作出測和處理,提高鋪排的質量,並且記錄鋪排過程中的各種數據,作為檢驗鋪排質量和施工效果的依據。
  11. The affecting features and characteristics of coal mining activity planning in coal enterprises were analyzed, and it ' s theory simulation model based on human - computer conversation was presented, and expounded that knowledge warehouses preparation and the theory simulation process, and application results were estimated particularly

    摘要分析了煤炭企業採煤作業計劃的影響因素和特點,提出了基於人機對話的理論模擬模型,並闡述了模型的知識庫準備及理論模擬過程,最後計了模型的應用效果。
  12. However, it is a prevailing practice in highway projects in our country that the feasibility studies in the preliminary investigation and the appraisal of operation cost in later stage fail to carefully and thoroughly analyze the impact of those indeterminant factors on a proposed project and the probability of those factors. furthermore, in construction period, only those major uncertain factors ( say, wars ) are written in the contract as a part of unpredictable risks so as to rectify the responsibilities of the parties as named in the contract, but the minor factors ( say the change in drawings ) are not singled out but included in other contrast articles

    在國內公路項目可行性研究和後評估運營經濟成本時,只簡單地對一些影響項目的不確定性因素羅列出來而沒有認真分析這些不確定性對整個項目影響的大小和其發生的可能性大小;在項目實施過程(施工階段) ,只是把一些大的不確定性(如戰爭)作為不可見風險成為合同條款雙方分清責任的一部分,而一些小的(如施工圖紙的變更)一般不單獨列出,而包含在其它合同條款中。
  13. Study of the regional stability and preliminary siting of the anqing bridge are the important, basic work prior to the construction of the bridge

    安慶長江公路大橋區域穩定性及選橋位線方案是大橋建設的一項重要基礎性工作。
  14. Later, the doctor told me that the embryo was not correctly positioned, so he arranged for me to have a cesarean section exactly two weeks before the estimated time

    時醫生說胎位不正,並安排剖腹生產,時間恰是兩周
  15. The following aspects are involved in this dissertation : 1 ) properties of convergence of the network model under the circumstance of few rooms, the prediction of the early production tally with the growth of the fire in building on the whole while the prediction becomes most fallacious when the rooms increase to a certain number, for instance, 9. the solution of the net mass flux, positive mass flux and negative mass flux is improved and then mass conservation is strictly maintained so that the prediction of the software become more credible and reliable

    本文主要涉及以下幾個方面: 1 )軟體計算收斂性態在房間數目很少的情況下,軟體開發的成果能在總體上成功測建築火災的發展過程,當房間數目增加到一定的數目(如9 ) ,軟體計算將出現劇烈振蕩的問題,測結果極不理想。本文改進了軟體對凈質量流量、正、負質量流量的求解,保證了三者之間的嚴格守恆關系。經過改進,軟體的測結果更可靠,更可信。
  16. Epc ( engineering, procurement and construction ) tender is normally taken as the way of international power project bid, the management of bid of the turnkey contract ranged from project information collection, agent and sub - contractor selection, pre - qualification confirmation, site investigation, equipment and material price requisition, bid document and offer preparation. especially, the management methods for choice of project, agent and sub - contractor selection, the organization setting and skill of bid offer are difference from domestic project. the ability to manage the international epc bid activity is the key factor to win the project, and is very important to the operation of the wined contract

    涉外電力工程通常採用總承包方式招標,投標涉及項目的跟蹤、代理人及分包商的選擇、資格審、現場踏勘及收集資料、設備詢價、編制投標文件及投標報價等投標全過程的各個方面,特別是項目的選擇、代理人和分包商的選擇、管理組織機構的設置、報價技巧等方面的管理方法與國內總承包工程投標有較大的差別,針對涉外電力項目工程的特點,如何運用管理方法和技巧進行管理,將直接關繫到項目投標的成敗,同時對中標后進行項目的實際操作也具有舉足輕重的意義。
  17. The characteristics of precipitation anomalies in summer, previous and simultaneous ssta and preceding winter accumulated snow depth anomalies corresponding to positive and negative phases of 10 - yr mode and 25 - 30 - yr mode are discussed respectively. no matter for 10 - yr mode or for 25 - 30 - yr mode, reverse characteristics corresponding to positive phases and negative phases appear in the above fields. it proves that the decadal variation of sah have a good relation to the decadal variation of other key element of climate system and we can regard sah as a strong signal of the anomalies in the climate system

    ( 4 )夏季南亞高壓東西振蕩具有明顯的年代際變化特徵,本文分別討論了對應於10年周態的正位相年和負位相年及25 - 30年周態的正位相年和負位相年時夏季我國降水距平、及同海溫距平及冬青藏高原積雪距平的分佈特徵,發現無論是10年周態還是25 - 30年周態,對于夏季南亞高壓東西振蕩的正位相年和負位相年以上各要素場呈現為很好的反位相特徵,說明夏季南亞高壓的年代際變化與氣候系統中其他要素的年代際變化具有很好的關聯性,可將南亞高壓看作氣候系統中大氣子系統異常的強信號,通過分析南亞高壓的年代際異常可以更直接地研究和測區域氣候異常。
  18. Repairing concrete crack through embedded pipe is a new attempt in the field of structure repairing and a preparation for a kind of intelligent concrete with self - healing capability

    摘要埋管混凝土裂縫灌漿修補技術,是混凝土裂縫修補技術中的一種新嘗試,同時也為新型自愈合仿生混凝土材料的研究和開發作準備。
  19. Secondly in enterprise valuation cost method should proceed with book value of the financial statement, regard market value as adjusting orientation and reduce application range of cost method. when income method is adopted, four principles should be paid attention to : a : stage - by - stage income model should be used which is made by early stage income current value added by later stage income increase. b : net profit and net cash flow should be the majority of income volume

    其次為:企業價值評估採用成本法應從財務報表的賬面價值入手、以市場價值為調整目標、減少成本法的應用范圍;採用收益法應以收益現值加後收益額遞增的分階段收益模型,收益額以凈利潤、現金凈流量為主,收益測以企業未來發展潛力分析為提的銷售收入測為主導,折現率堅持不低於無風險報酬率等四項原則,系數以回歸方程的測算為主;市場法中參照物企業選取應以同行業企業為基準、擴大數據來源,注重評估比率可靠性驗證、利用多種比率的配合等。
  20. Alkaline phosphatase ( alp ) activity in the intraradical hyphae could reflect the functional differences among am fungal isolates. alp activity in intraradical hyphae at early growth stage was a useful physiological index for predic

    Am真菌根內菌絲的堿性磷酸酶活性在一定程度上反映了不同真菌功能之間的差異,植物生長的根內菌絲堿性磷酸酶活性可以作為測菌根效應的簡易生理指標。
分享友人