預定計劃 的英文怎麼說

中文拼音 [dìnghuà]
預定計劃 英文
preset programme
  • : Ⅰ副詞(預先; 事先) in advance; beforehand Ⅱ動詞(參與) take part in
  • : Ⅰ形容詞1 (平靜; 穩定) calm; stable 2 (已經確定的; 不改變的) fixed; settled; established Ⅱ動詞...
  • : Ⅰ動詞1 (計算) count; compute; calculate; number 2 (設想; 打算) plan; plot Ⅱ名詞1 (測量或計算...
  • : 劃動詞1 (撥水前進) paddle; row 2 (合算) be to one s profit; pay 3 (用尖銳的東西在別的東西上...
  • 預定 : 1. (預先規定或約定) fix in advance; predetermine; schedule 2. [計算機] reserve
  • 計劃 : 1 (工作、行動以前預先擬定的內容和步驟) plan; project; programme; device; devisal; design 2 (做...
  1. A revolution must come on the due instalments plan

    革命必須按照預定計劃分幾個階段進行。
  2. We have slipped behind schedule.

    我們無形中已落後于預定計劃
  3. Information publication planning budget, selecting channels, contacting advertisement agencies, proofreading documents, assessing effects recruiting participating job fairs, collecting resumes, contacting interviewees, responding emergencies

    信息發布媒體選擇廣告代理商接觸稿件的校對效果測招聘人才招聘會的參加簡歷的整理面試者的聯系緊急變化的對應
  4. Budgets compel managers to plan, coordinate activities, and communicate plans throughout the company : aid performance e - valuation ; and motivate employees to achieve goals

    算促使管理者制、協調活動和在全公司范圍內進行交流;有助於業績評價;激勵雇員完成目標。
  5. I must go about my work or i ' ll fail behind my schedule

    我必須著手工作,否則就完不成預定計劃
  6. But the draft went off on schedule in three transports, with no disturbance.

    但是這次征工按照預定計劃已經遣走了三批人,並沒什麼騷動。
  7. The main procedure and steps are following as : according the random characteristic of the time spent by each work procedure, computer simulation is applied to produce the most possible scheduling network. and by corresponding optimization and adjustment on the network, the cost and scheduling construction network can be obtained ; during the practical construction according to the network, the warp between the actual cost and expected scheduling is tracked dynamically. then the computer simulation system is used to predict the future cost and progress operation, and take corresponding precautionary measures to control beforehand

    其主要思想與步驟為:首先運用算機模擬技術來模擬工序作業時間的隨機特性,產生概率最大的施工網路,並對其進行優化和調整,以獲得滿足工期、質量要求的成本及網路;在施工過程中動態跟蹤施工實際成本與進度與目標所發生的偏差以及質量問題,然後根據已出現的偏差,利用算機模擬技術對項目未實施部分進行進度、成本的測和分析,根據現有信息對網路未完成部分進行調整和優化,以盡可能把各項費用控制在預定計劃成本之內或使工程的綜合指標最優。
  8. Participate in the implementation of planning maintenance programs and designing the preventive maintenance system

    參與制性維修程序和草擬防性維修系統
  9. Chapter two and chapter three analyze the requirements of different types of enterprises, including mass production, middle and small batch production, single production. based on this, the main function frame of master production scheduling and job shop scheduling is established. four methods of drawing master production scheduling and four modes of formulating job shop scheduling are proposed, and most of them are discussed in details at aspects such as theory, realization and data store, etc. not only is it important for master production scheduling and job shop scheduling to support different types of enterprises, but also for other support functions

    第二章通過對不同類型企業(包括大量生產、多品種中小批量生產、單件小批生產)的主生產編制方式和功能的需求分析,提出了能夠適應多種生產類型企業需求的主生產管理子系統的總體功能框架,重點研究了分別適應不同生產類型企業需求的固周期、滾動、零部件、投產等四種主生產編制方式,並實現了數據庫的設
  10. Our schedule went completely off the rails during the strike.

    我們的預定計劃在罷工期間完全被打亂了。
  11. C. 2 - note 1 : the new product introduction program should include provisions for such programs as : quality and reliability prediction studies, pilot production, demand and capacity studies, sales and service personnel training, and new product post - introduction evaluations

    註解1新產品介紹程序應包括以下程序:質量及可靠性,試制產品,需求及產量,銷售及服務人員培訓,新產品位估
  12. Two years behind schedule, airbus has lost more than an estimated $ 6 billion in forecasted profits that the a380 was supposed to generate

    比原推遲兩年發布,空客較期利潤已估損失約60多億美元。
  13. Three major benefits of budgeting are : budgeting, by for ? malizing the managers ' responsibilities for planning, compels them to think ahead. budgeting provides definite expectations that are the best framework for judging subsequent performance. budget ? ing aids managers in coordinating their efforts, so that the objectives of the organization as a whole harmonize with the objectives of its parts

    算編制的三個主要優點是: 1 ,算編制使管理人員制的責任正式化,從而迫使他們事先思考; 2 ,算編制明確了期目標,而這是評價以後經營活動的最佳標準, 3 ,算編制有助於協調管理人員所作的努力,從而使各部門的目標與企業的總體目標一致。
  14. These two models were used jointly to obtain some metricable characteristics of the process, including information on organization of standard software process, such as software scope, labor consumption and cost estimation. the aim of this combination is not only to perform statistics and metric after the process, but also to do estimation analyses when the program was established. thus, management and control of the process can be achieved

    在獲取過程的一些可度量特徵,如與組織標準軟體過程的使用有關的信息:軟體規模、工作量、成本的估值時,考慮將這兩種模型結合使用,從而真正達到管理和控制的目的,不僅在事後進行統和度量,而且在制時對要度量的軟體進行估分析,有利於軟體過程評估; 3
  15. Organizes regular visits in accordance to a predetermined plan

    按照預定計劃期組織銷售拜訪。
  16. ( 2 ). wbs is an important basis in project management and a necessary clue of activity chain. taking the aim and function of the srttep plan as a starting point in consideration, with the introduction of the prearranging ideas such as concept design, detailed design and rolling design, the thesis puts forward project working structure resolving method based on wbs three - class model, thus realizing the working structure resolution by using gradually - deepened gradation model and laying foundation on better plan, staff disposition and budget plan

    ( 2 )項目工作結構分解( wbs )是項目管理的重要依據和活動鏈接的必要線索,本文從川塔施建工程項目工作的目的和作用出發,引入概念設、詳細設、滾動設的事前規思想,提出了基於wbs三級模型的項目工作結構分方法,利用逐級深入的層次模型實現項目的工作結構分解,為項目進一步的進度、人員分配、了堅實的基礎。
  17. On the basis of the preset plan of software testing engineers, the automated software testing system is expected to conduct the automated testing by means of automated testing tools or other methods ; thus lightening the intensity involved in the labour of by - hand testing and enhancing the quality of software

    自動化測試就是希望能夠通過自動化測試工具或其他手段,按照測試工程師的預定計劃進行自動的測試,從而達到減輕手工測試的勞動量、提高軟體質量的目的。
  18. We gotta get back for the falcon game. come on

    我們比預定計劃慢了快點
  19. A year, in short, ahead of schedule

    也就是說,比預定計劃提前一年實現
  20. According to schedule

    按照預定計劃
分享友人