預應力錨 的英文怎麼說

中文拼音 [yīngmáo]
預應力錨 英文
prestressed anchor
  • : Ⅰ副詞(預先; 事先) in advance; beforehand Ⅱ動詞(參與) take part in
  • : 應動詞1 (回答) answer; respond to; echo 2 (滿足要求) comply with; grant 3 (順應; 適應) suit...
  • : Ⅰ名1 (力量; 能力) power; strength; ability; capacity 2 [物理學] (改變物體運動狀態的作用) forc...
  • : 名詞(鐵制的停船設備) anchor
  1. Design specification for hydraulic prestressed anchorage

    水工預應力錨固設計規范
  2. Strengthening ill geologic section road chasm side slope with prestressed achor pile grid beam

    預應力錨桿格梁加固不良地質地段路塹邊坡
  3. Stability calculation methods for grillage supporting structure with prestressed anchor and its application

    框架預應力錨桿邊坡支護結構穩定性計算方法及其
  4. This article comtined the practice of the projtct of jiaojiang bridge and analyzed strand wire with high strength and low laxation, the anchorage system, the tentioned technice in the construction, and the principle of anchorage

    摘要本文結合椒江大橋工程實踐,分析了國產高強度低鬆弛鋼絞線和預應力錨固體系,在施工中的張拉工藝、固原理。
  5. The construction technology for the prestress anchored retaining wall

    預應力錨索樁板墻施工技術
  6. Technology of pre - stressed bolt support for rock floor gateway in deep mine complicated conditions

    深井復雜條件下底板巖巷預應力錨桿支護技術
  7. It is the " prestress anchor ribbed beam support system " that gave a new practical support system to both of them

    預應力錨桿肋梁支護技術為這兩類基坑提供了一種實用的支護體系。
  8. " prestress anchor ribbed beam support system " is a new practical support technology which came from soil nailing walls system and un - embedded rank of piles with anchors support system that has been used successfully for 4 years by the author and his company named qingdao deep foundation stabilization engineering co., ltd. it " s mechanism is similar to rank of piles with anchors support system that can not be inserted into the bottom of foundation trench, but it " s ribbed beams are used to replace rank of piles made before excavation so the work cycle can be shortened and the support system cost can be reduced ; meanwhile this system maintains the soil nailing wall " s convenience of digging and supporting

    預應力錨桿肋梁支護技術」是筆者及所在單位歷時四年在土釘墻和無嵌入多排樁兩種支護體系基礎上開發用成功的一種新型實用性支護技術。其支護機理類似於未嵌入坑底的排樁多支護,只是由肋梁代替了開挖前施工的排樁從而提前工期並降低支護造價;同時繼承了土釘墻隨挖隨支護的機動靈活性。自1998年至今該技術已在青島、濟南、煙臺等十幾個深基坑和高邊坡工程中成功用。
  9. The company the author worked in is applying a practical patent for the " prestress anchor ribbed beam support system ". so far this technology is still a technical and commercial secret. so there is a special announcement here, this thesis is only offered to professors for examination, so any copy and spread to the same project companies is not allowed, the author gave a gratefulness to the professors who hold this thesis here

    筆者所在公司正在就「預應力錨桿肋梁支護技術」申請國家級實用專利,該技術暫屬技術和商業機密,因此特別聲明:本文僅作為碩士論文供教授評審使川,論文不能翻印或傳至同行業其他單位中,筆者特向擁有本人論文的教授們表示感謝。
  10. We can say that it can develop the usage of soil nailing wall fill the rank of piles disadvantage a bright future of developing and using. the development, application, advantage and disadvantage about the " prestress anchor ribbed beam support system " is introduced in chapter 1 : it " s supporting mechanism and structural feature is introduced and compared with the soil nailing walls and un - embedded rank of piles in chapter 2 ; design and computer steps and more details about the design methods of the support system are introduced in chapter 3 ; the two important parts named draperies and anchors are introduced on their construction technology in chapter 4 ; three foundation trenches " instances with different depth in different soil are showed in the last chapter 5

    本文在第一章概論部分介紹了「預應力錨桿肋梁支護結構」的發展、用和優缺點;第二章分析其支護機理、結構特點,並與土釘墻和無嵌入排樁多支護進行了結構受對比分析;第三章介紹該支護結構的設計計算方法步驟,詳細介紹了支護結構各部分的設計方法;第四章介紹預應力錨桿肋梁支護系統最重要的兩個部分:帷幕和桿的施工技術;第五章介紹了不同土層不同深度的有代表性的三個基坑工程實例。
  11. The article structure the landslide prevention and cure, the structure of prestress anchors and its application in detail. basing on the geology condition of fabricating yard, we calculate the solid power and the length of anchor rope. we have worked out the experiment research scheme, and has carried on the earlier stage experiment, field demarcation experiment and has opened pulling the experiment on the spot. ten teams of steel rope to two teams of structure types twist the experimental data that thread internal stress and the total pulling force has been in progress research, and has put forward raising the measure of solid capability of prestress anchor and administering possessing

    本文以川藏公路滑坡路段為研究對象,對滑坡的治理、預應力錨索的結構、作用及其在滑坡防治中的用進行了詳細的分析;基於施工現場的地質條件,對索最佳固段長度進行了理論計算;制定了實驗研究方案,進行了前期實驗、現場標定實驗、實地張拉實驗;對兩組結構型式的十組鋼絞線內及總張拉的實驗數據進行了研究,提出了提高預應力錨固性能的措施,以及具體的施工方案和施工工藝。
  12. The structure of prestressed anchor - rope and groundsill is one of the most effective sheathing works, it is used wildly in some slop protection works. the structure is made up of prestressed anchor - rope and groundsill. the combined structure can utilize the latent energy of rock or soil mass

    預應力錨索地梁結構是一種極其有效且正推廣用於各工程部門的支擋防護體系。該結構由預應力錨索和地梁共同組成。
  13. Internal force calculating method of prestressed - cable beam - on - foundation for high rock slope

    巖石高邊坡預應力錨索地梁的一種內計算方法
  14. Based on the research of influenced parameters on constant and varying depth solid web box girder before, the shear lag aroused by the parameters including width - span ratio, outstanding flange on base slab and the position of the tendons are further studied. the investigation show that shear lag values diminish along with the decease of width - span ratio and the departure from the symmetrical axis of anchor position, but outstanding flange is contrary to the former

    在前人對等截面、變截面實腹箱梁剪滯效影響參數研究的基礎上,本文進一步對腹板開孔的連續箱梁的寬跨比、底板翼緣伸出以及預應力錨固位置改變等參數對箱梁剪滯的影響進行研究。
  15. Construction technology for pre - stressed anchor - rope in buttressed retaining wall

    預應力錨索在扶壁式擋墻中的施工技術
  16. Reinforcing collapsing blocks of laitan cliff by prestressed anchor

    預應力錨桿技術加固淶灘摩崖造像危巖體
  17. Abstract : this paper introduces four typical light - retaining structures. they are frame girder with prestressed anchor ropes, antislide pile with preslressed anchor ropes, anchored nelwork with jetting concrete and retaining wall with root piles. these structures are successfully applied to the national highway no. 107 in guangdong province

    文摘:以國道107線清連一級公路上四個典型的邊坡病害治理工程為例,介紹預應力錨索格構梁、預應力錨索抗滑樁、噴掛網支護、樹根樁擋土墻等輕型支擋結構在公路邊坡病害治理工程中的
  18. Strengthening steep slope at new putaojing tunnel using prestressed anchor ropes

    新葡萄箐隧道陡崖病害的預應力錨索加固
  19. The author hoped professors give some precious advices for the thesis and this technology to develop it

    最後學生懇請教授們對論文及「預應力錨桿肋梁支護技術」提出寶貴意見,以使該技術能進一步完善成熟。
  20. Basic tests on the prestressing force anchor of a high slope project

    路塹高邊坡固工程預應力錨索基本試驗
分享友人