預期實際標準 的英文怎麼說

中文拼音 [shíbiāozhǔn]
預期實際標準 英文
expected actual standard
  • : Ⅰ副詞(預先; 事先) in advance; beforehand Ⅱ動詞(參與) take part in
  • : 期名詞[書面語]1. (一周年) a full year; anniversary 2. (一整月) a full month
  • : Ⅰ形容詞1 (內部完全填滿 沒有空隙) solid 2 (真實; 實在) true; real; honest Ⅱ名詞1 (實際; 事實...
  • : Ⅰ名詞1 (靠邊的或分界的地方) border; boundary; edge 2 (里邊; 中間) inside 3 (彼此之間) betwe...
  • : Ⅰ名詞1 [書面語] (樹梢) treetop; the tip of a tree2 (枝節或表面) symptom; outside appearance; ...
  • : Ⅰ名詞1 (標準) standard; guideline; criterion; norm 2 (目標) aim; target Ⅱ動詞1 (依據; 依照)...
  • 預期 : expect; anticipate
  • 標準 : (衡量事物的準則; 榜樣; 規范) standard; criterion; benchmark; pip; rule; ètalon (衡器); merits
  1. Because the supply water system is large - scale, the pump stations are many, the ways of supply water are complicated, and the adjustable spare is large, the whole data in the optimization of supply water, the flux and its variety regulations in the control stations ca n ' t be acquired. the paper predicts supply water during the process based on the theory of artificial neural network control. the optimization has two steps

    供水系統中很難確地獲取整個管網的所有基礎數據,主要難以知所有節點的逐時流量及其變化規律,因此成為供水系統的優化調度的難點,本文採用人工神經網路對供水量進行測,應用二級優化調度,第一級以整個供水系統的費用最小為目,用回歸方法求出各供水節點的供水量;第二級利用流量跟蹤的方法對每個供水節點(泵站)現優化運行,以在泵站內達到最大節能目的。
  2. In this paper, first discussed are the corresponding results in highway and dam constructions and the engineering characters of rock - fills are deeply analyzed, especially the relationships between gradation, strength and maximum dry density, long - term stability of fillers including earth - fillers and rock - fillers and some conclusions of use are drawn. by in - situ tests and researches on compacting mechanism of high - filled rock embankments, effecting factors on compaction, construction technology and shock compacting technology, obtained in this paper are the compacting technology of high - filled rock embankment and the optimal parameters of rolling compaction. by deeply research on the theory and methods of quality control of high - filled embankment, settled are the questions as quality detection method and control standard of high - filled rock embankment

    本文首先總結和分析了國內外公路和壩工行業已有的相關成果,深入探討了填石料的工程性質與最大幹密度、長穩定性等之間的關系,得到了一些有益的結論;通過現場試驗路堤的試驗和對高填石路堤壓機理、填石路堤壓效果影響因素、施工工藝和沖擊壓技術等研究,解決高填石路堤壓工藝和最優碾壓參數控制等技術問題;通過深入研究填石路堤壓質量控制原理和方法,解決高填石路堤壓質量檢測方法和控制技術難題;解決高填石路堤沉降觀測技術問題,並根據沉降觀測結果研究高填石路堤地基和路堤沉降變化規律,得到了能測沉降變化規律的「龔帕斯」成長曲線測模型;根據工程,深入研究了邊坡穩定性的影響因素,得到了有益的結論。
  3. On the basis of the analysis, the paper point out the developing strategy, make clear the future business developing direction, describe the strategic orientation including market orientation, social orientation, industry orientation. taking the term from now to 2008 as the first strategic term, the paper depict the important measures in order to achieve the goal after turning the corporation vista into the interior detailed target. the last part of the paper put forward some new ideas for the farther study as the necessary supplement

    在完成內外多方面的比較分析基礎上,進入的戰略制定過程,提出集團戰略展望,指明公司的未來業務,從而為公司提出一個長的發展方向,以清晰、確的文字描繪集團戰略定位,包括市場定位、社會定位、產業定位;建立目體系,並將2008年發展作為戰略施前,將公司的戰略展望轉換成集團內部各方面具體業績;同時,較為詳細的敘述了為達到既定戰略目所需採取的多項重要措施,以達到戰略規劃效果。
  4. 1 room reservation will be made according to arrival and departure dates, unless specified. reservation confirmation depend on availability

    除非另行指明,酒店房間將安抵港及理港日訂。訂的房型及按房間情況決定。請參會代表盡快確定。
分享友人