預期負載 的英文怎麼說

中文拼音 [zǎi]
預期負載 英文
anticipated load
  • : Ⅰ副詞(預先; 事先) in advance; beforehand Ⅱ動詞(參與) take part in
  • : 期名詞[書面語]1. (一周年) a full year; anniversary 2. (一整月) a full month
  • : Ⅰ名詞1 (負擔) burden; load 2 (虧損) loss 3 (失敗) defeat Ⅱ動詞1 [書面語] (背) carry on th...
  • : 載Ⅰ名詞(年) year : 一年半載 six to twelve months; six months to a year; 三年五載 three to five ...
  • 預期 : expect; anticipate
  • 負載 : [電學] load
  1. Equipped with electronic controller fini tronic and preset for remote control for two or more compressors. it offers working pressure and oil mist separator tank inner pressure indication, separator filter clogging lashing alarm before overpressure e - stop, electric motor temperature control, maximum screw assembly temperature control, air temperature on pressure end indication, electric motor direction of rotation check, time to scheduled maintenance term, total operating hours and operating hours under load, alarm log of last five failure events

    設為丙臺以上空壓機聯機遠程控制,有工作壓力和油氣分離器罐內壓指示,分離器過濾器阻塞報警,電機溫控,螺桿總成溫控,壓力端空氣溫度指示,電機轉向檢查,維護周油,油過濾器,空氣過濾器,分離器過濾器,總運行時間和運行時間,記錄上五個報警故障等。
  2. Among the improper adjustments discovered by the investigators were the creation and release of accruals and reserves, the transfer of express accruals from one liability account to another, and the use of excess balances to offset unrelated expenses in later periods

    在內部調查中所發現的不當調整有:虛構及核銷和盈餘;將特殊的由一個債帳戶轉移至另一個債帳戶;將收入余額沖銷後不相關的費用等。
  3. This paper analyzes the character of the transformer load and presents the control means to reduce the comprehensive power loss to minimum by controlling the transformer operation status, which forecasts the daily load of transformer by periodical auto - regression model ( par ) and divides the daily flow line automatically into two typical phases. then, this paper simulates the par by matlab. at last, a real intelligent control device based on the ti ’ s tms320lf2407 dsp has been completed

    論文分析了配電變壓器的特點;提出採用周自回歸模型測配電站用電日荷,根據測結果和用電時段,以綜合功率損耗最小為目的變壓器經濟運行控制方法;以ti公司的tms320lf2407dsp為基礎,完成了配電站變壓器經濟運行智能監控裝置的研製。
  4. Footing or anchorage for scaffolds shall be rigid, and capable of carrying the maximum intended load without settling or displacement

    腳手架的地腳或固定地必須穩固,能夠在承最大的情況下不發生沉降或位移。
  5. In the paper, prescale technology, interpolate method, averaging method and multiple period synchronization method are used to measure the frequency accurately. diode demodulating technology, and power attenuated method or probe coupling & water load technology are employed to measure the power of high power microwave. isothermal technology is used to improve the stability of demodulator and to expend the range of square linear region

    本文採用分頻法、內插法、多周同步法、平均法實現了頻率的精確測量;利用二極體檢波技術,結合衰減法或探針耦合+水技術實現了大功率微波功率的測量;採用恆溫技術提高了二極體檢波器穩定度;完成了單片機串口通信協議設計和系統電磁兼容的分析和設計。
  6. 3 government s contingent liabilities at 31 march 2003 and estimates of these at 31 march 2004 and 31 march 2005 are provided in section iv of this appendix as supplementary information to the mrf. 4

    有二三年三月三十一日政府或有債,以及在二四年三月三十一日和二五年三月三十一日政府或有債的估計,作為中測的補充資料。
  7. 3 government s contingent liabilities at 31 march 2002 and an estimate at 31 march 2003 and 31 march 2004 respectively are provided in section iv of this appendix as supplementary information to the mrf. 4

    Iv部有二二年三月三十一日政府或有債,以及在二三年三月三十一日和二四年三月三十一日政府或有債的估計,作為中測的補充資料。
  8. It is well known that internet can only provide best - effort service. in this way, all traffic flows are treated fairly and they contend for the same network resources, so the expected qos only depends on the current traffic load of the link

    眾所周知,傳統的因特網提供的是一種「盡力而為」的單一服務方式,所有的數據流被「一視同仁」 ,公平的競爭網路資源,的服務質量qos只能依賴于鏈路上當前流量的情況來決定。
  9. As the ratio of peak samples to total training samples is low, the prediction accuracy of peak load is poor when applying support vector machine ( svm ) model to predict a periodical load

    在應用svm模型于具有周荷的測時,由於在訓練樣本中峰值或谷值樣本所佔比例很少,從而導致峰值荷測精度不高。
  10. Pavlova viridis, isochrysis zhanjiangensis and isochrysis galbana 3011 were cryopreserved in liquid nitrogen using encapsulation - dehydration. algal cells in early stationary phase were encapsulated in 3 % ca - alginate beads with 30 nacl, 2 million cells in one bead. beads were desiccated with silica gel then directly immersed in liquid nitrogen. the cell viability after warming was evaluated by chlorophyll content. the main factors influencing the cell viability, such as water content of beads, dehydration rate, dehydration procedure, preculture and recovery methods after thawing were studied. the results are as follows : 1

    本文以綠色巴夫藻( pavlovaviridis ) 、湛江等鞭金藻( isochrysiszhanjiangensis )和球等鞭金藻( isochrysisgalbana3011 )等三種餌料金藻為試驗材料,用包埋脫水法進行冰凍保存。選擇靜止初的藻細胞包埋在含有30氯化鈉的3 %的褐藻酸鈣膠球中,細胞約200萬個細胞/膠球,經過硅膠吸濕法脫水后,探討了膠球含水量、脫水速率、脫水程序、培養以及化凍后恢復方法對冰凍保存存活率的影響。
  11. The electro - hydraulic load simulator of fin stabilizer is physical half - objective simulative system. its function is to simulate, under laboratory conditions, different kinds of hydrodynamic force exerted on the fin stabilizer so as to detect technical performance index of the driving system of fin stabilizer. thus the classical self - destructing all - objective experiment will be converted to half - objective forecasting experiment in laboratory to achieve the aims such as shortening lead time, saving developing funds, enhancing reliability and success proportion

    減搖鰭電液模擬臺是一種半實物物理模擬系統,其功能是在實驗室的條件下,模擬船舶航行過程中減搖鰭所受的海浪水動力荷譜,從而檢測減搖鰭驅動系統的技術性能指標,將經典的自破壞全實物實驗轉化為在實驗室條件下的半實物測性實驗,以達到縮短研製周、節約研製經費、提高可靠性和成功率的目的。
  12. In the paper, through the example of the waiting hall of xt an international airport, several main questions meet in the design have been discussed, analyzed and solved, which include in negative friction force around pile in collapsible loess, the calculating method of bearing capacity of pile. the crack control methods of analysis and design in the super - length reinforced structure have been tested in the project, and reached the effect to be hoped

    本文通過西安咸陽國際機場新航站樓工程設計的具體實例,分析、論述了建築結構在設計中遇到並解決的幾個主要問題:如自重濕陷性黃土場地樁基摩阻力問題;淺層土雖經強夯但下層土仍有可能產生摩阻力時樁的承力計算方法;對鋼筋混凝土結構的裂縫控制實現超長設計的分析和設計對策,經過工程驗證,達到了的效果。
  13. To avoid the actuator, a capacitor load being charged up by the drift current of the amplifier, a secondary feedback from the output of the amplifier has been used and expected result has been gotten

    針對驅動器輸出電流漂移造成的壓電作動器(容性)電荷積累,文中引入了抑制驅動器電流漂移的反饋環節,取得了的控制效果。
  14. Main content includes : first, improve the understanding of the necessity and urgency about the youth ' s ideological and political work ; second, set up a goal system of the youth ' s ideological and political work, gearing to actual circumstances ; third, study the youth ' s thought state scientifically to strengthen the predictability and perspective of the work ; fourth, explore and utilize the new carrier of the work energetically, especially to capture the position of internet voluntarily ; fifth, combine the era ' s requiring and the youth ' s reality closely, and promote the work pertinently ; sixth, strengthen organizational support of the work and combine the innovating of the communist youth league ' s constructing with the ameliorating of the youth ' s ideological and political work ; seventh, continue and deepen teenagers " mass activity of establishing spiritual civilization ; eighth, make great efforts to build a good atmosphere for the youth ' s ideological and political work, mobilizing the whole society, with a responsible attitude towards the young generation and the country ' s future, optimize the environment the youth growing up in

    第三,就如何做好新時青年思想政治工作提出了對策。主要內容包括:一是要切實提高對青年思想政治工作必要性、緊迫性的認識;二是切合實際地建立青年思想政治工作的目標體系;三是科學地研究青年思想狀況,加強青年思想政治工作的見性和前瞻性;四是大力發掘和利用青年思想政治工作的新體,特別是要主動占領網際網路這個陣地;五是緊密結合時代要求和青年實際,有針對性地開展工作;六是著力加強青年思想政治工作的組織依託,將團建創新與改進青年思想政治工作結合起來;七是繼續深化青少年群眾性精神文明創建活動;八是努力營造青年思想政治工作的良好氛圍,全社會動員起來,以對青年一代、對國家未來責的態度,優化青年成長的環境。
  15. From the experiments, the number and width of fracture are obviously decreased, and pasting cfrp laminates play important role in improving rc construction durability ; with anchoring, premature is prevented and the ultimate shear capacity is increased ; taking properly anchoring measure, the ultimate shear capacity of rc t - section beams of initial loads is higher than that of no initial loads ; under non - anchoring case, because the rehabilitation of rc t - section beams with cfrp laminates are destroyed suddenly, the reinforcement effect maybe decrease

    試驗結果表明,粘貼碳纖維布顯著減小了鋼筋混凝土t梁的裂縫數量和寬度,抑制了裂縫的開展,對提高普通鋼筋混凝土構件耐久性有重要作用;採用適當的錨固措施可以有效防止構件發生早破壞,提高構件的極限抗剪能力;對于有錨固的粘貼方式,有的t梁抗剪極限承力明顯高於無的t梁。試驗還表明,在無錨固的情況下,用碳纖維布作抗剪加固后的t梁破壞較突然,有可能使梁的加固效果出現效應。
分享友人