預測延遲 的英文怎麼說
中文拼音 [yùcèyánchí]
預測延遲
英文
prediction lag- 預 : Ⅰ副詞(預先; 事先) in advance; beforehand Ⅱ動詞(參與) take part in
- 測 : 動詞1. (測量) survey; fathom; measure 2. (測度; 推測) conjecture; infer
- 遲 : Ⅰ形容詞1. (緩慢) slow; tardy; dilatory 2. (晚) late; delayed 3. (遲鈍) slow; obtuseⅡ名詞(姓氏) a surname
- 預測 : calculate; forecast; prognosis; divine; forecasting; foreshadowing; predetermination
-
Network bandwidth, latency, measured and predicted
網路帶寬、延遲、是否可測量與可預報。For reducing the disadvantageous influence of the the relaxation of strain and the lose of pretension on the structure, the time span of delaying scene torsional moment checx and accurate maintence method are given
為減少高強螺栓預拉應變鬆弛和預拉應力損失對結構的不利影響,給出了延遲現場扭矩檢測的時間區間和正確維護的方法。To cope with the increased burden, the report ' s authors suggest nurse practitioners, physician assistants and hospices pick up some of the workload ; primary - care doctors monitor patients who ' ve finished treatment for recurrence ; older oncologists delay retirement ; more cancer specialists be trained ; and technological advances, such as electronic medical records, be employed to free up more of doctors ' time for patient care
為了應付日益增加的負擔,該報告的作者建議從業護士,醫師助理和救濟院提升部分工作量;初級保健醫生負責已經完成預防腫瘤復發治療病人的監測;老的腫瘤專家延遲退休;更多的癌癥專家接受培訓;利用技術進步,例如電子病歷來幫醫生騰出更多的時間去照顧病人The algorithm and its implementation of the leading zero anticipation are very vital for the performance of a high - speed floating - point adder in today s state of art microprocessor design. unfortunately, in predicting " shift amount " by a conventional lza design, the result could be off by one position. this paper presents a novel parallel error detection algorithm for a general - case lza
目前國際上已有很多演算法對前導0預測演算法進行了研究,但是出於設計方法和延遲等方面的限制,大部分前導0預測演算法都為非精確演算法,其預測結果可能與真實加法結果中前導0的個數產生一位的誤差,這個誤差需要在浮點加法的后規格化過程中進行修正,因此反過來又增加了浮點加減演算法的關鍵路徑延遲。Estimation method for coke yield in delayed coking unit
延遲焦化裝置焦炭產率的預測方法We build a close vibration compensation system which can successfully achieve the measurement of interference fringes movement and - vibration compensation. it puts forward pre - setting fill - in pulses method to implement phase shifting with the same pzt. with this new method, the interference fringe can be stabilized at any pre - setting phase position
提出了填充脈沖數預設定的方法,可以將干涉條紋鎖定在任意設定的位相位置,實現了用pzt同時實現振動補償和移相測量;深入分析討論了pzt的延遲問題,創造性地提出了用多次逼近補償的辦法,給出了反饋補償的演算法,解決了補償過程中存在的系統不穩定和過補償的問題。In this article, an equivalent definition of reconstruct function is drew in the state space reconstruct by time delay chaotic time series, that lead the prediction more conveniently. then introduce a weighted distance to depict neighbour points of prediction which insured the similarity of the neighbour points
本文在時間序列坐標延遲后重構的相間中,作出重構函數的等價定義,提高了預測的可操作性;並在此基礎上,引入了加權距離來刻畫預測向量的鄰近點,保證了鄰近點的相似性。There are many plants that have the character of time - varying, large delay, large inertia in the process of production of modern power station such as the superheated steam temperature, the reheated steam temperature, the water treatment of boiler and the load regulation. some of them have the strong character of nonlinear and some of them are multivariable coupling systems it is very difficult to obtain good effect of control by conventional pid control. it is necessary to set up the mathematics models of controlled plants if applying control means of modern control theory such as self - adaptive control, optimal control , decoupling control and predictive control. and these control systems have large calculation and bad character of real time in general. these disadvantages make them be not able to meet the need of real production process and limit the application of them in modern power station. now the generator units are developing towards large capacity and high parameters. many new kinds of generating electricity means are coming into being. the characers of production units of power station become more and more complex but the demand to quality of control becomes more and more strict. the new control means are in bad need to control them effectively
現代電站的生產過程中存在過熱汽溫、再熱汽溫、鍋爐水處理、負荷調節等許多大遲延、大滯后、特性時變的對象,它們中有些還是具有強非線性特性的對象或多變量耦合系統,採用常規的pid控制手段很難取得良好的控制效果。若應用現代控制理論中的自適應控制、最優控制、解耦控制、預測控制等控制手段,則需要建立被控對象的數學模型,而且往往控制系統的計算量大、實時性差。這些缺點使其很難滿足實際生產過程的需要從而極大地限制了其在現代電站中的應用。In those experiments wave shapers have been utilized to modify the incident wave so that the condition of constant strain rate is satisfied more sufficiently. the effect of outer factors on the stress equilibrium of early stage in the specimen was analyzed, and the methods to improve the uniformity of stress in specimen at early stage were given. the elastic wave velocity of specimens can be determined by the wave shape fitting of the predicted transmitted wave with the measured transmitted wave at the early stage, furthermore, the shifting - time in shpb data processing can be determined
在shpb實驗中採用波形整形技術使入射波的上升沿變寬;分析了影響shpb實驗中試件早期應力平衡的外部因素,給出了改善早期應力均勻性的方法;採用透射波的早期預估波形與實測波形作對比的方法確定了shpb實驗數據處理中的延遲時間;因而在實驗中得到了比較準確的應力應變曲線。Thirdly, with the simplest single - input discrete system as the model, we analyze and discuss the effects for control - delay on the discrete variable structure control systems, and bring forward the design method of discrete variable structure control based on the system state forecast ; simulations show that the above solution avoids adverse influences for control - delay on the performance of variable structure control systems with control - delay, and control effect is fine
第三,本文以最簡單的單輸入離散系統為模型,分析討論了控制量延遲對離散變結構控制系統的影響,提出了基於系統狀態預測值的離散變結構控制設計方法;模擬表明該方法設計的具有控制滯后的變結構系統避免了控制量延遲對系統動靜態的不利影響,控制效果良好。Renal allograft long - term function protection with enalapril
腎移植患者發生移植腎功能延遲恢復的危險因素分析及預測The proposed approach enables parallel execution of conventional lza and its error detection, so that the error - indication signal can be generated earlier in the stage of normalization, thus reducing the critical path and improving overall performance. the circuit implementation of this algorithm also shows its advantages of area and power compared with other previous work
本文提出了一種新型的基於錯誤糾正機制的前導0預測演算法,該演算法在傳統非精確演算法的基礎上增加了對其結果出錯時的預判機制和規格化過程中的實時糾正機制,從而實現了尾數和規格化時的精確移位,降低了浮點加減運算的關鍵路徑延遲。It provides guidelines for contracting strategies, work breakdown, project cost accounting and forecasting, and handling changes, risk, and the impact of delays
它提供了縮減策略、工作故障、項目成本計算和預測、變故與風險處理以及延遲的影響等各方面的指南。Based on the delay - coordinate reconstruction and bilinear expressions in the phase space of a chaotic system, a bilinear adaptive filter was designed to predict low - dimensional chaotic time series
摘要基於混沌動力系統相空間的延遲坐標重構和雙線性表達式,設計了預測混沌時間序列的雙線性自適應預測濾波器。Then based on the practical test technique of emt, it checks up whether chinese securities market is at weak - form - market phase by analyzing that whether the price is random whether the yield can be forecasted by the characters of company, whether the information lingeringly or overly reacts and whether the technical analysis is efficient. the result expresses that the securities market has not reach weak - form - market, it still has low efficiency
接著根據證券市場效率理論的實證檢驗方法,通過價格是否隨機性、是否可用公司特徵來預測收益率、信息是否存在延遲與過度反應、技術分析是否有效等檢驗方法對我國證券市場是否處於弱式有效階段進行實證檢驗,結果表明我國的證券市場尚未達到弱式有效,依然處于低效率之中。First, calculating time delay and embedding dimension to reconstruct phase space. second, based on chaos theories, the artificial neural network is used to build one - step and multi - steps predictive model. third, combining with an adaptive filter, predictive error is processed so that weak signal is extracted from strong chaotic noise
研究的內容分為三個方面: ( 1 )確定嵌入維數和延遲時間重構相空間; ( 2 )將混沌理論與人工神經網路結合,建立混沌時間序列(混沌背景)的一步與多步預測模型; ( 3 )結合自適應信號分離器對預測誤差進行處理達到檢測微弱信號的目的。The experimental results show that the effect of ib is much larger than that of the noise on estimating ionospheic delay, and ib can cause ionospheric delay measurements to include systematic errors of the order of several meters. therefore, one must significantly take notice of ib and remove its negative effect, and should not casually consider ib as part of noise whenever gps data are used to fit ionospheric model or to directly calculate ionospheric delay. ( 3 ) stability of ib is studied with a refined method for separating it from ionospheric delay using multi - day gps phase - smoothed code data
算例表明,新方法通過採用平均去噪分離方法后處理相位丞于g陀的電官唇監剝及延遲改正工論與方法的研究平滑測碼數據,求出儀器偏差並對需要實時處理儀器偏差的觀測數據進行預報改止,直接利用觀測值確定電離層延遲量,待估參數少、能消除儀器偏差的大部分影響,具有較好的精度,可作為waas及其他gps網路系統確定電離層延遲的可行的參考方案。If the previous instruction was a branch, the btb is always accessed, regardless of the prediction from the pht, to prevent the additional delay accuracy decrease
如果前一條指令是一個分枝,則無論pht的預測是否執行, btb總被訪問,以防止額外的延遲精度下降。The financial secretary has, in fact, heeded recent public opinions and maintained a higher expenditure growth of 3. 5 percent. this reflects the fact that at a time of economic recession, the immediate demand for social services may increase rather than decrease. but instead, it will add pressure to a more drastic reduction in expenditures during the next two years in order to broadly balance the budget
去年預算案中的預測數字顯示,公共開支的增長在今年將大幅回落至1 . 2 % ,但結果財政司順應民意,現時選擇了仍將開支訂定於3 . 5 %增長,除了反映經濟衰退時,社會服務需求可能不減反增的現象外,亦在未來兩年的中期內,有更大延遲壓力,去調低開支,求取預算的大致平衡。To overcome the bad effect of long delays, a prediction and compensation method based on an adaptive filter, which uses lms algorithm and structure of transversal filter is provided. performance of convergence of the algorithm is analyzed
為提高跟蹤精度,克服延遲的影響,提出了基於橫向濾波器結構和lms演算法的延遲自適應預測補償方法,並分析了演算法的收斂性。分享友人