預熱裝置 的英文怎麼說

中文拼音 [zhuāngzhì]
預熱裝置 英文
preheater unit
  • : Ⅰ副詞(預先; 事先) in advance; beforehand Ⅱ動詞(參與) take part in
  • : Ⅰ名詞1 (服裝) dress; outfit; attire; clothing 2 (演員的化裝品) stage makeup and costume Ⅱ動詞...
  • : 動詞1. (擱; 放) place; put; lay 2. (設立; 布置) set up; establish; arrange; fix up 3. (購置) buy; purchase
  • 裝置 : 1 (機器設備的配件)installation; device; apparatus; equipment; arrangement; gear; appliance; rig...
  1. The afterheat, which is collected by recovery devices, in winter can be used as the low level thermal source of heat pump, and in summer can preheat feed water, thus equivalent an economizer. because energy flows in the system so reasonably that energy is used to the most, therefore, its energy conservation effect is significant, and the operating expenditure declines consequently. the sewage can be reused after due treatment, thua it has a certain social and ecological benefit, too

    本研究中選用分離式提供洗浴用水,利用水源,一機兩用,進行空間供和製冷,並通過余回收器對系統內的余進行回收,冬季可作為水源泵的低位源,夏季可對鍋爐給水進行,起到「省煤器」的作用。這樣實現系統內的能量合理流動,從而達到節能的目的,同時洗浴污水經適當的處理后可以回用,因而還具有一定的社會和生態效益。
  2. Firstly, simulate flow field of rear smoke channel, plot velocity magnitude and ash concentration distribution in section of entry of heat pipe air preheater, compare with data which were measured in guiyang power station, verify simulation to be reasonable and right. secondly, simulate all kinds of factors which affect flow field ' s uniformity such as length, thickness, location of diffluent board, ash concentration, ash diameter, and so on, find the chiefly factors. thirdly, install guide board in curve channel in rear smoke channel, then simulate its " flow field, plot velocity magnitude and ash concentration distribution

    在此基礎上模擬在冬夏兩季不同情況下,不同流速對管空氣器壁面溫度的影響;然後對影響整個流場分佈的各種因素:包括分流板長度、厚度、偏離中心流道位的偏離度、飛灰濃度、飛灰粒徑等因素進行數值模擬;最後提出在分流煙道轉彎處加導流板,並模擬加導流板后的流場分佈,得到下級空氣器出口、管空氣器進口處的斷面速度場分佈、濃度場分佈,以論證加導流板能達到流場均勻化的作用。
  3. Abstract : large time delay exists in complicated practical processes. for example, in fccu ( fluidized catalytic cracker unit ) reactor - regenerator, the feed is preheated through heat exchanging from fractional column slurry, thus results in large time delay. a predictive control system is designed for such processes, where the kernal algorithm is dynamic matrix control. application results show that the control behavior is improved than original pid control

    文摘:實際的復雜工業過程,往往具有大的時滯,例如:煉油廠催化裂化的反應再生系統,其原料油通過油漿換實現,因此時滯特別大.本文針對這一類大的時滯過程,設計了以動態矩陣控制為核心演算法的測控制系統,運行實踐表明:這一控制方案比原pid控制在控制質量上有較大提高
  4. Air cannon block clearer is a special device used to prevent and remove the material blast and block of all kinds of bunker, hopper, cement preheating furnace, pipeline y section and mine drawshaft and drawslope

    空氣炮清堵器是防止和消除各類型料倉,料斗、水泥器窯和管道分叉處及礦山溜井、溜坡的物料起拱,粘倉閉塞等現象的專用
  5. " automatic reset n. c. series connected thermal overload protection, two moisture sensing probes, prelubricated shaft bearings and class f insulation. * efficiencies include all mechanical losses including mechanical seals.

    自動重n . c .系列,連接過保護,兩個潮氣檢測探頭,潤滑軸承和f級絕緣。 *效率包括所有機械密封中的機械損失。
  6. It applies level synchronous hoisting devices on the spray system, preheater, tin channel and condesing wind channels of automatic tin stove

    自動錫爐之噴霧系統、器、錫槽,冷凝風口均采水平式同步升降運動
  7. The second chapter studies the economy of ship ' s power plants, based on the aspects of lowering fuel cost, waste heat recovery, the match of ship, machinery and propeller, increasing propulsion efficiency, increasing the economy of ship ' s power plants, etc. the third chapter discusses in detail the control measures of voyage change cost, analysizes systematically the voyage change cost based on the way of fuel cost, harbor cost, voyage venture cost. the fourth chapter studies the structures and control measures of seafarers cost, maintenance cost, spare parts and stores cost, lubricating oil cost, etc. which are relatively easy to be controlled ; based on the state maintenance decision - making, a mathematical model is put forward, the validity and its solve process are discussed. the control measures of spare parts, fuel cost and lubricating oil cost should be based on scientific budget, through the control means of application, reception, usage, store check, try to acquire the inosculation of theory

    第一章主要討論營運船舶運輸成本,對船舶運輸成本的概念、結構、性質與分攤、成本細分進行了分析,從宏觀上闡明了船舶運輸成本的生存環境和生長趨勢;第二章研究了船舶動力的經濟性,在營運船舶降低油耗、廢利用、船機槳匹配、提高推進效率、提高船舶動力經濟性的有效途徑等方面進行了闡述和論證;第三章詳細論述並論證了航次變動成本的控制措施,全面系統地分析和總結了航次變動成本,通過對燃油成本、港口使費、航次風險成本的分析與控制,提出了航次風險成本的概念並論述了若干航次風險成本的控制措施;第四章對船舶營運成本中的船員費用控制、維修保養及其費用控制、船舶備件物料管理及其費用控制等幾個主要可控性較高的成本進行了細致的分析並分別討論了相互的控制措施,提出了基於狀態維修決策的馬爾可夫數學模型並論證了模型的正確性及具體解算步驟,對于備件、燃潤物料的控制堅持以科學的算為前提,以申領、接收、使用、盤存為控制環節,切實做到理論與實踐的密切結合;第五章,結合營運成本的核算的案例,對船舶營運成本的算及核算進行了有益的探討,旨在揭示成本發生的動因,並給出了成本算、核算的編制方法。
  8. Wear resistant layer of cylinder and double - layer liner in catalyst creaking apparatus ( without or with tortoiseshell net can be used ), inner liner of carbon monoxide exhaust - heat boiler, pouring at site for furnace roof with high temperature of heating furnace of steel rolling, different forging furnace, resistance furnace, the prefabricated parts can also be made

    催化裂化中的筒體耐磨層及雙層襯里, (無龜甲網和有龜甲網均可採用)及一氧化碳余鍋爐的內襯,也適用於軋鋼加爐、各種煅造爐、電阻爐的爐頂、爐墻、爐底高溫部位的現場澆注,可製成制構件。
  9. Degassed furnace, sealing furnace, stabilizing oven, mask annealing lehr, blackening furnace, bulb roaster, primary annealing lehr for colour tube funnel, secondary annealing lehr for colour tube funnel, annealing lehr of single - press, annealing lehr of double - press, funnel annealing lehr, colour tube panel annealing lehr, tube - neck sealing and annealing lehr, cut - off machine, necking machine, funnel - loader, lehr preheating unit, neck - loader, funnel auto - pickup, auto - pickup conveyor, funnel auto - loader, neck seal loader, neck - delivery conveyor, rough grinder, fine grinder, fine - polish grinder, panel pickup, button sealing machine, pin sealing machine, funnel annealer loader

    彩管、彩玻設備系列:排氣爐、封接爐、穩定爐、蔭罩退火爐、黑化爐、焙燒爐、彩色玻錐一次退火爐、彩色玻錐二次退火爐、雙壓機退火爐、單壓機退火爐、彩色玻屏退火爐、管頸封接退火爐、割頭機、接頸機、錐、退火爐預熱裝置、管頸載機、屏自動取出、自動取出傳送帶、錐自動載機、管頸封接載機、管頸供給傳送帶、粗研磨機、細研磨機、精拋光研磨機、取屏機、陽極帽封接機、銷釘封接機、錐退火爐載機。
  10. Frame for pre - heater at kiln inlet will adopt steel structure to save investment, accelerate erection speed and beautify building

    改進窯尾工藝布,窯尾器塔架設計為鋼結構,既可加快施工安進度,節省投資,又可美化建築。
  11. The heated-air system provides rapid heating of the air entering the carburetor when the engine is cold.

    發動機處于冷態時,空氣能迅速提供的空氣進入化油器。
  12. Appliances for the instantaneous production of hot water for domestic use operating on propane - air and on butane - air of 25 mj m3 and 24, 3 mj m3 net calorific value respectively and intended for connection to a vmc system mechanical extraction of combustion products

    用25mj m3丙烷氣體和24 . 3mj m3丁烷氣體凈值工作的,並定與燃燒物的vmc系統機械抽排連接的家用快速加供水設備
  13. The essay author consult the lots of national and international related information, and proceed the biomass pyrolysis experiment, predict the biomass heat value and establish the module, and establish the experiment formula through c, h of the independent variableesign, provide the evident and the convenience for calculating the rate of the energy converting and using of the biomass equipment

    本文作者在查閱國內外大量相關資料的基礎上,進行了生物質解的實驗,並做了生物質發測及建模研究,建立了以h和c為自變量的生物質能量測經驗公式,為生物質氣化能量轉化率計算和生物質能量利用率計算提供了依據和方便。
  14. The contents of this paper include the following several aspects : ( 1 ) a model of the fractures leakage is built through counting and analyzing the wealthy geological records of hae field, and a model of the fracture water transporting is also built according to the fracture water condition of its recharge and its runoff and its discharge in hae field ; ( 2 ) this paper studies the chemical behavior and the migration parameters of the elenent sr2 + in ground water in hae field, the main contents include : the presence form of the element sr in ground water is analyzed by way of the rmodynamics ; the absorption mechanism that granite and sand stone absorbs sr element is analyzed based on theory and experiment test the diffusion parameters of the element sr in water and in granite and in sand stone are researched with laboratory experiment test ; the partition coefficient of sand stone and granite to sr is tested by the batch way

    其研究內容包括以下幾個方面: ( 1 )通過對我國hae選處場豐富地質資料的大量統計和分析,建立了該處場的基巖裂隙滲透模型。再根據hae選處場基巖裂隙水的補給、徑流、排泄條件及水位動態特徵,建立了選處場基巖裂隙水水運動模型。 ( 2 )對高毒性鍶元素在我國hae選處場地下水中的化學行為和遷移參數進行系統的研究,其中主要包括運用力學方法分析了鍶元素在地下水中的存在形態,利用理論分析與實驗測試相結合的方法分析了花崗巖和砂巖對核素鍶的吸附機制,採用室內實驗研究了核素鍶在地下水中的擴散參數以及在花崗巖和砂巖中的本徵擴散參數,採用靜態批式法研究了鍶在砂巖和花崗巖中的分配系數。
  15. The second feeding for pre - heating device, water - cooling device for laminated film

    第二放料有預熱裝置,復合成品有水冷
  16. The invention is characteristic of the process of manufacturing hot water, in which water in multi - stage recirculating water - heating tank for collector and / or multi - stage confluent water - heating tank, as a whole or separately, can be heated by solar energy collector, or a heat pump, or an electrical heater

    其特徵在於,水製作過程可以是經太陽能集器、或泵、或電加同時或分別對分級加式集器循環加水箱、分級加式匯流水箱中的水進行分級加的組合,並且,水的製作與水的使用採用分時制,即經周期性分級加所制得的定量的先製作后儲存在分級加式匯流水箱及儲能水箱中用作下一個周期的分時水供應。
  17. The warm - up device can reduce the temperature difference between the cloth and the molten film, so it improve the intensity of antis tripping, reduce the gaffer of the film

    預熱裝置縮小了材料和熔融薄膜的溫度差,保證了塗覆后抗剝離強度高,減輕塗覆后的皺褶。
  18. Adding an optional heating attachment enables you to maintain preheated samples at temperatures up to 80 c. this allows you to fill samples which are highly viscous at ambient temperature

    選配一臺進樣口加,則可保持樣品的溫度在80 c ,這使得高粘度樣品在室溫條件下就能順利進樣。
  19. The major influencing factors of felting quality are pre - heating temperature and glue depth, and the installation of the temperature raising set in the felting parts

    經分析確定了影響粘接質量的主要因素是加溫度與打膠深度,對粘接部分增加了
  20. Terms for railway vehicle parts - heating - part 4 : preheating and heating device

    鐵路車輛部件術語.加.第4部分:和加
分享友人