預編程序 的英文怎麼說

中文拼音 [biānchéng]
預編程序 英文
preprogramme
  • : Ⅰ副詞(預先; 事先) in advance; beforehand Ⅱ動詞(參與) take part in
  • : Ⅰ動詞1 (編織) weave; plait; braid 2 (組織; 排列) make a list; arrange in a list; organize; gr...
  • : 名詞1 (規章; 法式) rule; regulation 2 (進度; 程序) order; procedure 3 (路途; 一段路) journe...
  • 程序 : 1 (進行次序) order; procedure; course; sequence; schedule; ground rule; routing process 2 [自動...
  1. Considering to the continuous rigid - frame bridge construction characteristic, putting forward the idea of reverse to optimize prestressed steel. according to different construction phases, the paper gets the formual of the cantalever phase, join two section of a bridge phase and the vertical prestressed steel, and works out corresponding program

    考慮大跨徑應力混凝土連續(剛構)橋施工的特點,提出了基於倒裝方法的應力靜定束、合龍束以及豎向束的優化設計理論,並制了相應的計算
  2. ( 2 ) the liman problem is normally adopted to check the liability of numerical method. the calculation error was within 9 % by comparison with the theoretic solutions of liman problem in the following case, the dimensionless calculation length was 2 with high pressure zone 0. 8, and the dimensionless state parameters were p1 = 2, p2 = 1, p1 = p2 = 1, u1 = u2 = 0. experiment results in literature [ 8 ] were used to check the adaptability of the numerical model developed here for unconfined gas cloud explosions and the calculation error was within 13 %

    ( 2 )數值方法的可靠性通常用黎曼問題的解析解檢驗,本文以無量綱計算區長度為2 ,高壓區長度為0 . 8 ,狀態參數為p _ 1 = 2 , p _ 2 = 1 , _ 1 = _ 2 = 1 , u _ 1 = u _ 2 = 0條件下的黎曼問題解析解對所制的爆炸場計算進行了考核,結果表明該的計算誤差在9以內;為考核本文計算模型測開敞空間氣雲爆炸的適用性,以文獻[ 8 ]的實驗數據進行了校核,計算誤差在13以內。
  3. The computer can be preprogrammed (hard-wired)to draw macros.

    計算機可按預編程序(「硬線化」)繪出宏指令表示的內容。
  4. The basic theory and step of whole process analysis of reinforced concrete beam section flexural rigidity is stated, the realization program is worked out and the academic example is analyzed. 4. based on the static - state load test result of two practical projects, the application of the reinforced concrete beam system bridge structure disease examination and structure damage evaluation method is stated, and satisfaction result is gained

    1 、綜述了當前混凝土橋梁結構檢測及損傷識別的各種方法體系,並簡要評價了各方法體系的應用與不足; 2 、論述了基於靜載試驗的梁分段剛度系統識別的基本原理,制了實現,並進行了數值算例分析,提出基於本原理的梁橋結構損傷識別與結構評價方法體系; 3 、闡述了鋼筋混凝土梁截面抗彎剛度全過分析的基本原理和方法步驟,制了實現,並進行了相關算例分析; 4 、結合兩片工實例梁的靜載試驗,詳述了梁橋結構損傷識別與結構評價方法的應用過,得到了期的效果。
  5. Based on the budget setting process, the enterprise budget can be divided into imposed budget and participative budget, which both have its own virtue and deficiencies. the business can choose the appropriate method, complied with such factors as its own operation character, market environment, and target level of budget. according to budget preparative method, the enterprise budget can also be divided into fixed budget, flexible budget, probabilistic budget, rolling budget, and zero - based budget, etc. different methods apply to budgeting of different demand and content, which make choices diversified

    根據制的企業算可分為參與性算和強加性算,兩種方式的算各有優缺點,企業應根據自身生產經營特點、所處的市場環境、算的目標層次等各方面因素來選擇適合於自己的方式;根據制的方法,企業算分為固定算、彈性算、概率算、滾動算、零基算等。
  6. Linux can use prepackaged binary files, or you can compile programs directly from source code

    Linux可以使用先包裝的二進制文件,或者您可以用源文件自己
  7. Whereas conventional devices with a fixed program only permit changes to given values, the austromat

    在傳統的設備上,運行過已經寫好,只允許改變其數值在austromat
  8. With curvature - force method, this thesis designs the program for nonlinear analysis and simulates the test

    然後本文利用曲率力法制的非線性分析,模擬了應力框架試驗。
  9. And ad - link acl - 8112hg data acquisition card is used in gas road exchanging controlling to make this exchange reposefully in the system experiments, tests are given by system control programme

    對準實驗方面,制控製,利用光學顯微鏡測量對心和對缺口偏差,計算系統對準重復精度,結果達到了技術要求。
  10. These data sets were used to evaluate five ab initio gene prediction programs : ricehmm, glimmerr, genemark, fgensh and bgf

    用這兩個測試數據集合評估了5個在水稻基因組中測基因的: ricehmm glimmerr genemark fgenesh和我們自己寫的bgf 。
  11. Thus, inversion reliability and accuracy of multiparametric identification can be enhanced. then, based on the direct back analysis program dbapm of japan edition in construction forecast, the constrained optimization back analysis program cobap is developed. and the more reliable and accurate inversion forecast can be obtained when cobap is used in information construction and design in geotechnical engineering

    基於上述研究,在日本版的施工報直接反分析dbapm基礎上,擴充製成了約束優化反分析cobap ,通過dbapm和cobap的數值反演比較及工應用,說明cobap在信息化施工與設計領域具有更為合理可靠的反演報功能與應用價值。
  12. Article 13 the personnel expenditures required by the ncc shall be budgeted in accordance with budgetary procedure prescribed by law

    條本會所需之人事費用,應依法定定。
  13. The consciousness of university budget management should be established, and budget management should be leaded by strategy, and budget program and methods also should be improved, executions of budget should ha strengthened, moreover, university budget should properly deal with some basic relations on financial budget under the guidance of development strategy of the university

    因此,高校算管理應樹立各部門及領導的算意識,以學校戰略規劃為指導,改進制方法,加大算的執行力度,並處理好財務算的幾種關系。
  14. Whereafter, based on the analysis on the flood influence for traffic lines, the research is centered on the following parts : firstly, the destroying modes, reasons and mechanism of flooded lines are discussed, and the frameworks and countermeasures of preventing and controlling hazards system are put forward ; secondly, the ways of region forecasting for the landslide are analyzed and the automation of landslide forecast for certain site through visual programming is realized. furthermore, the function of dynamic segmentation in arc view is made use of to realize the forecast result ' s visualization ; thirdly, the reasons and patterns of roadbed subsidence are discussed and the methods of forecasting subsidence based on the gm ( 1, 1 ) model are put forward. then the applications of the arcview software and its extended module on the study of roadbed subsidence are debates upon ; fourthly, an analysis on the sources of flood for traffic lines, which situate in the reservoir coverage area, is given

    接著,論文探討了山區交通線路災害的特點、分類、時間和空間分佈規律以及災害的防治原則和對策等;然後,以洪水災害對交通線路的毀壞為主線,重點研究和分析了以下幾個問題:第一,探討了洪水對交通線路的破壞方式,水毀原因以及水毀機理,並提出了交通線路水毀防禦系統框架和對策;第二,分析了雨季邊坡塌方災害的區段測方法;通過可視化制了雨季邊坡塌方災害的工點,並結合arcview實現了測結果的可視化;第三,對路基沉陷原因和模式進行了分析,並提出利用gm ( 1 , 1 )模型對路基沉陷區進行分析和測,最後論述了arcview軟體及其擴展模塊在沉陷區研究分析中的應用;第四,對汛期庫區線路災害的原因進行了分析,並探討了利用數量化理論對路基防護工抗洪能力進行測的意義;第五,提出從風險的角度對交通線路的防災減災進行管理,對風險估計的相關問題進行了論述,並探討了交通線路水害危險區段的劃分問題。
  15. This paper adopts visual basic 6. 0, compiles predicting model of operating speed and analyzes the consistency of a section of a highway, considering the shifting of practicing car

    本文利用visualbasic6 . 0 ,考慮駕駛員在實際操作中的換檔原則,制了運行速度,並利用對某路段進行了公路線形的連續性分析。
  16. The computer program has following advantage : the solution of main blade is by iterative scheme in time domain, the kutta condition is used by explicit equal pressure condition, the jacobian matrix which can reflect the influence on the difference between the upper and lower surface at trailing edge by dipole is calculated in each iterative procedure, in order to improve the convergence of iteration

    本文制的螺旋槳非定常性能是針對主葉在時域中迭代求解的, kutta條件採用的是顯式的等壓條件,求解中為了提高迭代的收斂性,在每次迭代中都重新計算反映偶極子強度對尾緣處上下表面壓力差影響的jacobi矩陣。
  17. The computer can be preprogrammed ( hard - wired ) to draw macros

    計算機可按預編程序( 「硬線化」 )繪出宏指令表示的內容。
  18. The forecast program of long - term average concentration of air pollutant and its application

    大氣污染物長期平均濃度制及應用
  19. He says it contains 3, 000 preprogrammed answers, its file size is about half a megabyte, it was written in c language, and it runs on a pc

    他說該包含了三千條的應答語句,其文件大小大約有0 . 5兆位元組,使用c語言寫,可以在pc上面運行。
  20. A functional programmable unit that consists of one or more associated processing units and peripheral equipment, that is controlled by internally stored programs, and that can perform substantial computation, including numerous arithmetic operations or logic operations, without human intervention

    由一臺或多臺相聯的處理機和外圍設備組成的一種可的功能裝置,這種裝置由內部存儲控制,可執行大量的計算(許多算術運算和邏輯運算)而無需人的干
分享友人