預置周期 的英文怎麼說

中文拼音 [zhìzhōu]
預置周期 英文
during cycle
  • : Ⅰ副詞(預先; 事先) in advance; beforehand Ⅱ動詞(參與) take part in
  • : 動詞1. (擱; 放) place; put; lay 2. (設立; 布置) set up; establish; arrange; fix up 3. (購置) buy; purchase
  • : Ⅰ名詞1 (圈子; 周圍) circumference; periphery; circuit 2 (星期) week 3 [電學] (周波的簡稱) c...
  • : 期名詞[書面語]1. (一周年) a full year; anniversary 2. (一整月) a full month
  1. Remember there was ever the instruction to those peoples that were to hold to that that would bring for the spiritual forces, rather than the abuses of the abilities - as those with familiar spirits, as those that spoke to or partook of the divinations of those that had passed from the earth ' s plane, or those that partook of the animal magnetism - that came from the universal consciousness of animal matter as passed into its experience, in its interchange through those periods of integration and disintegration - and the spirit forces possessing those that would lay themselves open to such conditions, for these are as real as physical bodies if the attunements of the entity are such that it may vision them

    記住曾經給致力於精神力量修持的那些人們指導介紹過,而不是濫用各種能力-就像熟悉精神的那些人一樣,就像宣講真相的那些人或者共同分享已經傳遞到地球平面的言的那些人一樣,或共同參與動物磁性說的那些人一樣-來自已經傳遞了它的經驗的動物物質的宇宙意識,通過集成和崩潰的那些的交換-並且精神力量支配那些將自己於心靈開放條件下的人,因為這些精神力量就跟物質身體一樣真實,如果實體是協調一致的話可以顯現看見精神力量!
  2. This paper analyzes the character of the transformer load and presents the control means to reduce the comprehensive power loss to minimum by controlling the transformer operation status, which forecasts the daily load of transformer by periodical auto - regression model ( par ) and divides the daily flow line automatically into two typical phases. then, this paper simulates the par by matlab. at last, a real intelligent control device based on the ti ’ s tms320lf2407 dsp has been completed

    論文分析了配電變壓器的負載特點;提出採用自回歸模型測配電站用電日負荷,根據負荷測結果和用電時段,以綜合功率損耗最小為目的變壓器經濟運行控制方法;以ti公司的tms320lf2407dsp為基礎,完成了配電站變壓器經濟運行智能監控裝的研製。
  3. A comprehensive set of standards and guidelines has been established for supporting different activities of the whole software life cycle including project management, system development ( either by structured systems analysis and design, rapid application development or object oriented methodology ), software testing, maintenance, quality management, resources estimation, software configuration management, etc

    一套涵蓋廣泛的標準和指引已經建立以支援軟體生命之各種不同活動,包括計劃管理,系統發展(運用結構化系統分析及設計方法,應用系統快速發展法或物件導向法) ,軟體測試,維修,品質管理,資源算,軟體配管理等。
  4. The invention is characteristic of the process of manufacturing hot water, in which water in multi - stage recirculating water - heating tank for collector and / or multi - stage confluent water - heating tank, as a whole or separately, can be heated by solar energy collector, or a heat pump, or an electrical heater

    其特徵在於,熱水製作過程可以是經太陽能集熱器、或熱泵、或電加熱裝同時或分別對分級加熱式集熱器循環加熱水箱、分級加熱式匯流熱水箱中的水進行分級加熱的組合,並且,熱水的製作與熱水的使用採用分時制,即經性分級加熱所制得的定量的熱水先製作后儲存在分級加熱式匯流熱水箱及儲能水箱中用作下一個的分時熱水供應。
  5. Thirdly, the short - term and long - term financial early - warning system is established based on the financial statements of marketing corporation in electric power, medicine and general merchandise. systematic method, efficiency coefficient method and linear regression method are applied in the short - term financial early - warning system from the aspect of cash flow, operating performance and function model ; growth periods method and management grade method are applied in the long - term financial earl y - warning system from the aspect of growing capability and financial stratagem. finally, lots of examples are given to validate these early - warning models, and some countermeasures are discussed for avoiding and eliminating the distress of enterprise

    首先,介紹了企業財務警的概念、功能和國內外的研究現狀;其次,闡明了企業財務警的原理、程序和方法;再次,它以電力、醫藥和百貨行業的上市公司報表為資料,按照指標選取、標準判斷、警限設和警度報的步驟,從企業的現金流量、財務業績和函數模型三方面,分別運用系統化方法、功效系數法和線性回歸法構建了企業短財務警系統,從企業的成長能力和財務戰略兩方面,分別運用波動法和管理評分法構建了企業長財務警系統;最後,舉了大量實例對構建的各個警模型進行考證,並從財務角度探討了企業的防警和排警對策。
  6. It is one of the important parts for the control of hupqc to detect the reference compensation signal. the predictive strategy is presented based on wavelet theory, that means tracing the fundamental signal and replacing with sampling data every half cycle. the fundamental signal is forecasted step - by - step in a half cycle earlier

    補償指令信號的檢測是電能質量調節裝的控制環節之一,本文提出了基於小波理論的測檢測策略,跟蹤基波信號,以半為采樣更新速度,應用小波變換法對信號的基波分量進行遞推式報,並取其與實時信號之差做為參考,然後產主與之大小相等、相位相反的信號作為hupqc的實時補償指令信號。
  7. Firstly, the target cost of product is product life cycle cost ( lcc ) calculated with the principle of abc. secondly, managing activity help to design manufacturing line reasonably and promote reengineering ( re ). thirdly, abb can forecast the quantity 、 acquisition and consuming way of resources accurately and help management authority < wp = 8 > to acquire and use these resources

    作業算( abb )對目標成本規劃的支持表現在:第一,產品的目標成本是依作業成本計算原理計算的生命成本( lcc ) ;第二,管理作業以合理設生產組裝線和推動工程再造( re ) ;第三, 「精確」地計資源消耗量和取得、消耗方式,以至更有效地獲取和使用這些資源。
  8. The callup would ostensibly take the roster spot of first baseman doug mientkiewicz, who was officially placed on the 15 - day disabled list before monday ' s game and is expected to be out of action for at least six to eight weeks

    這個召喚上來的人將會公開的取代一壘手長名字先生的守備位,星一比賽前,長名字先生官方將他放入15天的傷兵名單內,計他將會有六到八無法上場。
  9. We can ration analyze and estimate hardware configure chosen in design such as machine tool, the capacity of buffer, the route of transport system etc, and personnel deployment of product line. we can forecast the produce cycle of product, analyze and forecast produce capacity of work - flow, simulate all kinds of predictable or random malfunction, finding bottleneck of system etc. we can also forecast the capability of work - flow under different scheduling strategy

    通過對流水線的模擬,我們可以對各種設計方案進行評估,可以定量分析與評價設計中所確定的硬體配(如機床、緩沖庫容量、運輸系統路徑等)及生產線人員配備情況,測產品生產,分析與測生產線的生產能力,模擬各種可見的或隨機的故障,發現系統瓶頸等。
分享友人