預裝填 的英文怎麼說

中文拼音 [zhuāngtián]
預裝填 英文
prefill
  • : Ⅰ副詞(預先; 事先) in advance; beforehand Ⅱ動詞(參與) take part in
  • : Ⅰ名詞1 (服裝) dress; outfit; attire; clothing 2 (演員的化裝品) stage makeup and costume Ⅱ動詞...
  • : 動詞1. (墊平或塞滿) fill; stuff 2. (補足; 充滿) replenish; supplement; complement 3. (填寫) fill in; write
  • 裝填 : stuffing; filling; priming; loading; tucker; seat; load; ram; pad
  1. This paper illustrates detailedly the thin groupware auto - adaptive recognition system ; it also illlustrates the procession of capture image and take indispensable foreclose to wipe off noise in order to get boundary easilyer. the recognition system uses " hough " transform method to make the recognition area orientation, and according to the unstable environment such as lights which leads to the change of the image ' s brightness, thresholds picture using an iterative selection method and then growing process for cell image segmentation based on local color similarity and global shape criteria, adaptively gets the best threshold to divide the washer off the background. the recognition system uses the classifier based on minimal - error - ratio bayes method to make decision after getting image characteristic

    本文詳細介紹了薄形組合件自適應識別系統;闡明了圖像的分通道自動採集過程,以及對採集到的原始圖像所進行的處理方法。通過採用哈夫變換去除偽邊緣點的方法,有效地解決了識別區域的定位問題。針對配零件(主要是墊片)薄、小導致圖像信息少、識別難度大,以及材質不一導致採集到的組合件圖像亮度波動等問題,提出了使用最佳閾值迭代法和使用種子充的圖像串列分割技術,自適應地找出最佳閡值,使墊片和背景分離,從而提取墊片數目信息。
  2. The paper researches the relations between blasting effect and blasting parameters, including diameter of drill, non - coincidence coefficient, hole spacing, hole row - spacing, cartridge diameter, charge per hole, density of line charge, charging structure and detonating manner, and how to adjust the blasting parameters to get the best blasting effect under the given geological condition

    本文在重慶市某高速公路合同段進行了現場裂爆破試驗的基礎上,研究了炮眼直徑、不耦合系數、炮孔間距、炮孔排距、藥卷直徑、單孔藥量和線藥密度、結構、起爆方式等爆破參數與爆破效果之間的聯系,以及如何在給定的地質條件下調整爆破參數獲得最佳的爆破效果。
  3. Finally, two examples show that, the availability and practicability of the new model is verified. the analysis of calculation result of berthiervill test embackment shows different part of compression curve have different influence upon the course of consolidation, and correct coefficient and viscous effect have great significance on deformation forecast. associated with the wenzhou airport runway engineering, the reason of increasing of pore - water pressuer in under - lying soft layer and post - construction settlement are given

    最後,通過兩個工程實例的分析來說明本文模型的有效性和實用性:一是對berthiervill土試驗場的軟基實測數據和理論成果進行對比分析,闡明考慮結構性擾動和粘滯性效應對分析天然粘土固結壓縮性的重要性;二是對溫州機場袋砂井超載壓工程進行數值模擬,指出停荷壓期間下臥層孔壓增加和工后沉降大的原因。
  4. Answer : preparative job includes : understands workplace one, the moving circumstance of 2 equipment, this job has with moving equipment without direct connection, have the job that cooperates without need with other team and group ; makes working priority discipline and the blemish that prepare to solve and weak point ; the staff member makes clear to divide the work and be familiar with the concerned data such as blueprint and test gauge cheng ; should be had the blueprint that agrees with actual state, record that examines last, newest rectify spare parts of the instrument that decides requisition, test gauge cheng, qualification, machine parts or tools kept in reserve, tool and join lead to wait ; is a few righter important equipment, especially complex protector or couplet jumps loop protector, should weave test program, working controller should fill in ticket of protection safety precaution, examine and approve via technical chief, just can carry out

    答:備的工作包括:了解工作地點一、二次設備的運行情況,本工作與運行設備有無直接聯系,與其他班組有無需要配合的工作;制定工作重點項目及備解決的缺陷和薄弱環節;工作人員明確分工並熟悉圖紙與檢驗規程等有關資料;應具備與實際狀況一致的圖紙、上次檢驗的記錄、最新整定通知單、檢驗規程、合格的儀器、備品備件、工具和連接導線等;對一些重要設備,非凡是復雜保護置或有聯跳迴路保護置,應編制試驗方案,工作負責人應寫繼電保護安全措施票,並經技術負責人審批,方能實施。
  5. Testing of packaging ; determining the filling ratio of standard capacity prepacks ; prepacks whose contents are indicated by weight

    檢驗.第1部分:標準容量充率的測定.
  6. The coefficient of compaction is 1. 22 on mechanical loader ; ( 6 ) the analysis settlement of roadbed used the xigeda filler, predict that tolerable settlement is 5. 5cm, total settlement is 11. 4cm, it is meet a criterion ; ( 7 ) the analysis stable of roadbed used the xigeda filler include water and slope the result show the xigeda filler is stable

    採用載機攤平,昔格達料的松鋪系數為1 . 22 ;昔格達料路堤沉降觀測分析。測昔格達料工后沉降為5 . 5cm ,總沉降為11 . 4cm ,滿足沉降要求;昔格達路堤水穩定性和邊坡穩定性分析,分析表明昔格達料路堤是穩定的。
  7. Blasting stress wave of bedded composite rock spread rules and rock damage situations are studied. the inflection of manner and structure of detonation of pre - splitting and step blasting on blasting effect have been studied

    分析了層狀復合巖體中的爆炸應力波的傳播規律和爆破前後巖體損傷狀況,並研究了層狀復合巖體中裂爆破和臺階爆破技術的藥方式和結構對爆破效果的影響。
  8. The characteristics of pressure drop of wire packing rotating packed bed absorber in air independent propulsion ( aip ) system are analyzed under counter - current condition and the model of pressure drop is built

    摘要對不依賴空氣動力置( aip )系統不銹鋼波紋絲網料旋轉床吸收器在氣液兩相逆流條件下的氣相壓力降特性進行了分析,建立了壓力降報理論模型。
分享友人