預計工作量 的英文怎麼說
中文拼音 [yùjìgōngzuòliáng]
預計工作量
英文
projected workload- 預 : Ⅰ副詞(預先; 事先) in advance; beforehand Ⅱ動詞(參與) take part in
- 計 : Ⅰ動詞1 (計算) count; compute; calculate; number 2 (設想; 打算) plan; plot Ⅱ名詞1 (測量或計算...
- 工 : Ⅰ名詞1 (工人和工人階級) worker; workman; the working class 2 (工作; 生產勞動) work; labour 3 ...
- 量 : 量動1. (度量) measure 2. (估量) estimate; size up
- 預計 : estimate; calculate in advance; expect
-
This paper researches the basic statistical rule of oil - gas dynamic system from the systematic theory, combining with the common characteristic and structure characteristic of oil - gas dynamic system, taking the design requirement of oil field development programming into consideration, by using of functional simulation principle ( including nn method, differential simulation method ) and historical data of oil field, establishes the in - out conjunctional relationship of dynamic index of oil field development, and researches the two level index prediction of development dynamic with both oil field and oil production plant on the basis of the in - out conjunctional relationship. furthermore, this paper analyzes the " decision - making variable ", " object " and " restriction terms " by the optimization theory and set up several optimal models which compose the oil field development programming, it is following : optimization model of the production composing ( solving the optimal composing of each subentry production and cor responding cost, workload, including the onshore thin oil production, the heavy oil thermal process production, tertiary oil recovery production, and the offshore production ) ; optimization model of measure production structure ( determining the optimal composing of each measure production and measure workload, which is composed of fracture, acidulation, capital repair and so on ) ; optimization model of the production distraction ( optimal distribution of the whole oil field production to each oil production plant ) and the integrated development programming model of oil field
本文從系統理論出發研究油氣動態系統基本統計規律,結合油氣動態系統的一般特點,結構特點,兼顧油田開發規劃設計的要求,利用功能模擬原理(含神經網路方法、微分模擬方法) ,依據油田歷史數據,建立了油田開發動態指標間的輸入輸出關聯關系,並在此輸入輸出關聯關系的基礎上研究了油田及採油廠兩級的開發動態指標預測,同時利用最優化原理,在分析「決策變量」 、 「目標」及「約束條件」的基礎上建立了多個構成油田開發規劃的「優化模型」 ,這些優化模型包括:產量構成優化模型(解決陸上稀油產量、稠油熱采產量、三次採油產量、海上產量及對應的成本、工作量的最優構成問題) ;措施產量結構優化模型(解決壓裂、酸化、大修等各項措施產量及措施工作量的最優構成問題) ;產量分配優化模型(將油田的產量最優地分配到各採油廠)以及油田綜合開發規劃模型。Moreover, there are drawbacks like difficulties in stimulation, complexity of calculation and heavy work in all these models because of many other factors. for example, the complexity of the dam structure, difficulties in measuring the physical and mechanical parameters of building materials and subgrade soil, stimulating the geologic structure of subgrade, predicting effects of loads, construction and environment on the dam and so on
此外,由於大壩結構復雜,建築材料和地基巖土的物理力學指標難以測定,復雜地基的地質構造還很難模擬,荷載、施工及環境因素對水工建築物的影響還很難準確預測,應用各種模型都存在著模擬困難、計算復雜、工作量大等不足。For the existing transformer cooling control system has many shortcomings such as the complicated system control circuit, the low reliability, the protection methods of blower fan being so simple, large control error, high fault rate, massive maintenance work and no method to realize telecommunication, this thesis develops a novel intelligent power transformer air - cooled control system based on the center of microprocessor through all - round technology analysis and research
本文針對變壓器冷卻系統使用常規控制系統存在的系統控制迴路復雜、可靠性低、風機的保護方式簡單而無法進行故障預測、主變壓器油溫測量精度低造成控制誤差大、故障率高、維護工作量大、無法實現遠程通訊等問題,經過多方面的技術分析和調研,設計開發了新型的以微處理器為核心的智能式電力變壓器風冷卻器控制系統。The mathematical statistical analysis was adopted in analyzing and forecasting of power market loads and electricity quantity to establish mathematic models
就電力市場負荷和電量分析預測工作中運用數理統計分析方法建立數學模型、進行分析預測作了詳細介紹。5 the tender shall complete schedule ii - estimated contract payments and shall substantiate the tabulation of this schedule by attaching a table indicating anticipated major quantities of work performed over the duration of the works
(五)投標者應在表二寫明預計合同支付款額,且在表中附上工程進行過程中預計的工作量。Using this method, the global stiffness matrix is established, decomposed and applied only once so as to greatly reduce the calculating work
這種簡捷計演算法在分析各種預應力工況時,只要一次性建立、分解和應用網架的總剛度矩陣,使計算工作量大為簡化。At the same time, according to the actual situation of one power supply company in our country, the software of " the operational analysis system of the power supply companies simulating market " is developed. the information technology is applied to the software and it combines the analysis of economy activities in separated departments of power supply ' s company into an integrated system
同時,根據某供電公司的實際情況,設計開發了《供電企業模擬市場運營分析系統》軟體,運用信息技術,把原來供電企業內部各個部門的分散的經濟活動分析結合成一個比較完整的分析預測系統,大大節省了工作量,提高了工作效率。In the paper, the following main factors are studied, such as developing the expert knowledge - base based on the special knowledge of the explosive demolition of frame building, designing the object - oriented expert system of the explosive demolition of frame building, developing the neural network training example base based on projects, developing the forecasting mode of blast effects with matlab 6. 1, developing the expert system of explosive demolition of frame building with visual b 6. 0, carrying out the connection of the expert system and forecast mode. the system consisted of eleven functional modules, such as the input of initial parameters module, the choice of the blasting method module, the choice of blast mode module, the design of blasting parameters module, the design of charge module, the verifying blasting safety module, the calculating safety of tumble module, the design of detonating net module, the blast effects forecasting module and the calculating volume module
本文的研究內容有:以框架結構樓房拆除爆破領域的專業知識為基礎製作專家系統知識庫;設計一般面向對象的框架結構樓房爆破拆除設計的專家系統;搜集相關爆破工程實例製作用於爆堆效果預測神經網路訓練的樣本數據庫;選取適當的輸入輸出因素,用matlav6 . 1構建爆破效果預測神經網路模型;用vb6 . 0編程開發出框架結構樓房拆除爆破專家系統,並實現爆破效果預測神經網路模型和專家系統的鏈接。該系統由初始參數輸入、倒塌方法選取、倒塌方案確定、孔網參數設計、缺口形狀及參數、爆破安全校核、傾倒安全校核、爆破網路、爆破效果預測、工程量計算、計算設計說明書等十一大功能模塊組成。The contractor shall submit work plans for the work to be undertaken in compliance with the quality assurance requirements of the contract conditions including off site precasting
承包商應按照合同條件中的質量保證要求遞交工作計劃,包括工地場地外的預制工作。Budgeted cost of work scheduled ( bcws )
計劃工作量的預算成本( bcws )Can speak, and do getting well calculating analysis and the application of data to fortune capacity that being is in progress that the traffic is build and the design is worked starts a little, and is the foundation that project item construction scope and operation were economically appraised, is evaluation essential factor and the key of item risk
可以說,做好對運量預測數據的分析和應用,是進行交通建設和設計工作的起步點,是工程項目建設規模和運營經濟評價的基礎,是項目風險的評價要素和關鍵。遠期預測客流是一個變動較大的變量,對預測的準確性來說難以保證。Depreciation on the fixed assets shall be accounted on the basis of the original cost, estimated residual value, estimated useful life and working capacity, according to the straight line method or the working capacity ( or output ) method
固定資產折舊應當根據固定資產原值、預計凈殘值、預計使用年限或預計工作量,採用年限平均法或者工作量(或產量)法計算。These two models were used jointly to obtain some metricable characteristics of the process, including information on organization of standard software process, such as software scope, labor consumption and cost estimation. the aim of this combination is not only to perform statistics and metric after the process, but also to do estimation analyses when the program was established. thus, management and control of the process can be achieved
在獲取過程的一些可度量特徵,如與組織標準軟體過程的使用有關的信息:軟體規模、工作量、成本的估計值時,考慮將這兩種模型結合使用,從而真正達到管理和控制的目的,不僅在事後進行統計和度量,而且在制定計劃時對要度量的軟體進行預估分析,有利於軟體過程評估; 3Article 11 [ prevention of disabilities ] the state shall undertake, in a planned way, the work of disability prevention, strengthen leadership in this regard, publicize and popularize knowledge of good pre - natal and post - natal care as well as disability prevention, formulate aws and regulations dealing with disability causing factors such heredity, diseases, medical poisoning, accidents, calamity and environmental pollution and adopt measures to prevent the occurrence and aggravation of disabilities by organizing and mobilizing social forces
第十一條國家有計劃地開展殘疾預防工作,加強對殘疾預防工作的領導,宣傳、普及優生優育和預防殘疾的知識,針對遺傳、疾病、藥物中毒、事故、災害、環境污染和其他致殘因素,制定法律、法規,組織和動員社會力量,採取措施,預防殘疾的發生和發展。Article 11 the state shall undertake, in a planned way, the work of disability prevention, strengthen leadership in this regard, publicize and popularize knowledge of good pre - natal and post - natal care as well as disability prevention, formulate aws and regulations dealing with disability causing factors such heredity, diseases, medical poisoning, accidents, calamity and environmental pollution and adopt measures to prevent the occurrence and aggravation of disabilities by organizing and mobilizing social forces
第十一條國家有計劃地開展殘疾預防工作,加強對殘疾預防工作的領導,宣傳、普及優生優育和預防殘疾的知識,針對遺傳、疾病、藥物中毒、事故、災害、環境污染和其他致殘因素,制定法律、法規,組織和動員社會力量,採取措施,預防殘疾的發生和發展。To perform each task, earned value analysis uses three fundamental values : the budgeted cost of work scheduled ( bcws ), the actual cost of work performed ( acwp ), and the budgeted cost of work performed ( bcwp )
對于每項任務,盈餘分析使用三個基本量:計劃工作量的預算成本( bcws ) 、已完成工作量的實際成本( acwp )和已完成工作量的預算成本( bcwp ) 。Aiming at to build up progress quantities management frame, to collect the progress data, to carry on the deviation analysis, the text shows the workload, plan deviation degree, the progress trend, and the expenses, adopts control measures for the decision makers
據此可成功地反映項目實際完成工作量與計劃在進度、費用兩方面的偏差程度以及進展趨勢預測,從而為決策者採取控制措施提供依據。The paper analyzed software project process problems existed in domestic software enterprises. the application of project milestone management framework can improve and rebuild those inapplicable project management processes related to business plan, investment plan, requirement baseline, effort estimation, project plan, cost control and software quality assurance
應用里程碑管理框架,能對國內軟體企業原有的項目管理過程模式進行改造,能夠有效克服舊的管理方式在商業計劃、投資計劃、需求基準、工作量預估、項目計劃、成本控制和質量保證等方面存在的缺點。A detail investigation shows that process state can be used as a clue to separate the process into several task units and sleep events can identify these task units to predicate the workload of future tasks. a three level alarm voltage schedule algorithm is used to reduce the deadline violation and performance jitter based on the workload prediction
提出了利用進程的每一個活動周期來作為可預測的任務單元的思想和實現方法,從而得到比較精確的工作量估計,並在此基礎上提出三級預警的電壓調度演算法。Value for money audit is conducted in accordance with a programme of work which is determined annually by the director of audit
衡工量值式審計工作是依照審計署署長每年預先制訂的工作程序表執行。分享友人