預載程序 的英文怎麼說

中文拼音 [zǎichéng]
預載程序 英文
pre-loading procedure
  • : Ⅰ副詞(預先; 事先) in advance; beforehand Ⅱ動詞(參與) take part in
  • : 載Ⅰ名詞(年) year : 一年半載 six to twelve months; six months to a year; 三年五載 three to five ...
  • : 名詞1 (規章; 法式) rule; regulation 2 (進度; 程序) order; procedure 3 (路途; 一段路) journe...
  • 程序 : 1 (進行次序) order; procedure; course; sequence; schedule; ground rule; routing process 2 [自動...
  1. Tag specifies whether or not the add - in must be preloaded

    標記指定是否必須外接
  2. The basic theory and step of whole process analysis of reinforced concrete beam section flexural rigidity is stated, the realization program is worked out and the academic example is analyzed. 4. based on the static - state load test result of two practical projects, the application of the reinforced concrete beam system bridge structure disease examination and structure damage evaluation method is stated, and satisfaction result is gained

    1 、綜述了當前混凝土橋梁結構檢測及損傷識別的各種方法體系,並簡要評價了各方法體系的應用與不足; 2 、論述了基於靜試驗的梁分段剛度系統識別的基本原理,編制了實現,並進行了數值算例分析,提出基於本原理的梁橋結構損傷識別與結構評價方法體系; 3 、闡述了鋼筋混凝土梁截面抗彎剛度全過分析的基本原理和方法步驟,編制了實現,並進行了相關算例分析; 4 、結合兩片工實例梁的靜試驗,詳述了梁橋結構損傷識別與結構評價方法的應用過,得到了期的效果。
  3. First, using strip - partitoning method and programming in matlab language, the numerical caculations of the relation curve between moment and curvature are done for the beams strengthened with non - prestressed and pretressed cfrp sheets, base on the assumption of plane section, non - bonding slip and non - peeled destroy. secondly, nolinear finite elemeant analysis by ansys are done for the beams strengthened with prestressed cfrp sheets base on the three assumptions before mentioned, the analysis are all done for the relation curve between load and displacement, the distribution of material stress, the distribution of cracks. lastly, calculation formula of flexural capacity and deflection are proposed

    )的全過關系曲線。其次基於上面的三個假定,選擇合理的本構關系,利用ansys通用有限元分析應力碳纖維布加固梁進行非線性有限元分析,分析了加固梁的荷-撓度關系、材料的應力情況、裂縫的分佈情況等。最後提出了承力計算公式和正常使用狀態下撓度計算公式。
  4. Program can analyze the multi - girder curved bridge, by using the diatropic distributing theory. it can calculate the dynamic programming loading, by using the combined influence. it can analyze the internal force under the action with the prestressed force, by using the equivalent load method

    採用橫向分佈的實用計算理論來處理多主梁曲線梁橋的空間受力分析問題;採用組合影響線來對曲線梁橋進行動態規劃加;採用等代荷法對曲線梁在應力作用下的結構內力進行分析。
  5. When tuyere of double disk is jammed, the current of fan will fall to light load current value ; therefore, checking current of fan will find this phenomenon and the system will deal with this condition according to pre - designed program

    ,當雙盤內風口堵塞后,鼓風機電流將降低到空電流值,故檢測鼓風機電流會及時發現這種堵塞現象,系統會根據設的進行處理。
  6. In this paper, the three level fortification criterion, two stage design method and the elastic response spectrum theory are adopted, and the program of nba ( the program of nonlinear - aseismic analysis for beam bridge ) is used to calculate. through gathering, analyzing and calculating a lot of bridge design materials, this paper induces a simple way to calculate the relative displacement of the beam and the pier, and then according to the current design method, it concludes a better design principle of the supporting length of the beams. at the same time the dynamics is adopted to put forward the design method of the carrying capacity and the lengthen of prestress wire ( steel bar ) falling - off prevention structures of highway bridges

    本論文採用三水準設防、兩階段設計方法、彈性反應譜計算理論,運用橋梁結構非線性地震響應分析nba ( theprogramofnonlinear ? aseismicanalysisforbeambridge )進行計算;通過收集大量的實橋設計資料,經分析計算,歸納總結出計算上下部結構相對位移的簡便計算方法;並綜合國內外的經驗值,提出梁的支承長度se的設計原則;同時運用動力學突加荷的原理,推導分析了應力鋼絞線式(鋼棒連接式)落梁防止裝置設計承力的計算方法和設計伸長量s _ f的取值;最後本文通過實橋計算,說明了落梁防止系統設計的方法。
  7. Similar to the process for scrutinising bills, after the debate on the second reading of the appropriation bill is adjourned, the estimates containing the details of the financial requirements in the bill will be referred to the finance committee, which is a standing committee of the council, for examination

    處理撥款法案的與審議法案的相若。有關撥款法案的二讀辯論中止待續后,有法案所列財政需求詳情的算案,便會交付立法會轄下的常設委員會財務委員會審核。
  8. Preloads all types in the specified assembly

    指定集中的所有類型。
  9. The author designed, made, processed and tested to the plexiglass model and the bridge. then author calculated and analyzed the results, as a result of the computer programs bsas, sap, qjx and nastran. the author researched the force characteristics and structural behavior of large - span prestressed concrete bridges with continuous rigid frame structure, used the advanced theory and technology, materials, arts and crafts to resolve the practical matters in design and construction, to optimize structure, and to provide credible technical data for the design and construction and maintenance of bridges

    本文以吉林省九站松花江特大橋為研究對象,通過有機玻璃模型的設計製作及加工和試驗,以及對已竣工通車的實橋荷試驗,利用計算機bsas 、 sap 、 qjx及nastran等進行理論計算和綜合對比分析,探討大跨徑應力砼連續剛構橋的力學特點和使用性能,運用先進的理論、技術、材料、工藝等來解決設計和施工中存在的實際問題,優化結構,並為橋梁的設計、施工及使用維護等提供可靠的技術資料。
  10. 3 ) on the basis of probability statistical theory, dispersibility of resistance change of fatigue life gage be analyzed and the calculating method of the dispersibility is set up

    編制了測多級加電阻變化的應用。 3 )用概率統計分析了其電阻變化的分散特性,給出了分散特徵值的計算方法。
  11. Pavlova viridis, isochrysis zhanjiangensis and isochrysis galbana 3011 were cryopreserved in liquid nitrogen using encapsulation - dehydration. algal cells in early stationary phase were encapsulated in 3 % ca - alginate beads with 30 nacl, 2 million cells in one bead. beads were desiccated with silica gel then directly immersed in liquid nitrogen. the cell viability after warming was evaluated by chlorophyll content. the main factors influencing the cell viability, such as water content of beads, dehydration rate, dehydration procedure, preculture and recovery methods after thawing were studied. the results are as follows : 1

    本文以綠色巴夫藻( pavlovaviridis ) 、湛江等鞭金藻( isochrysiszhanjiangensis )和球等鞭金藻( isochrysisgalbana3011 )等三種餌料金藻為試驗材料,用包埋脫水法進行冰凍保存。選擇靜止初期的藻細胞包埋在含有30氯化鈉的3 %的褐藻酸鈣膠球中,細胞負約200萬個細胞/膠球,經過硅膠吸濕法脫水后,探討了膠球含水量、脫水速率、脫水培養以及化凍后恢復方法對冰凍保存存活率的影響。
  12. At last, with the program, 18 one - storey and one - span prestressed frames are simulated. some conclusions are reached with the taking into account the, secondary moment and types of load applying : ( 1 ) the in the beam affects the ductility of the section and rotary property of the plastic hinge. so total coefficient of the modulation of moment becomes less with the becoming bigger

    最後,本文利用編制的非線性,模擬了18榀單層單跨應力框架,重點研究截面相對受壓區高度、次彎矩、加方式對塑性內力重分佈和彎矩調幅的影響,從中得出了以下主要的結論和規律: ( 1 )框架梁相對受壓區高度在很大度上反映了截面的延性,體現了塑性鉸的轉動能力,框架的總彎矩調幅系數隨著相對受壓區高度的增大而減小。
  13. ( 3 ) fem basic theory of foundation pit excavation stimulation is expounded, numerical model and method of construction simulation are determinated, which includes simplification of two - dimension problem and constitutive model of soil mass i. e. constitutive model of duncan - chang hyperbola model, numerical ways of initial situ stress, stimulation of equal nodal load of foundation pit excavation, nonlinear solutions of basic equations, fem disposing of inner supporting and pre - axial force etc. further fem code of stimulation of foundation pit excavation is compiled

    闡述了基坑開挖模擬的有限元基本理論,確定計算模型及施工模擬方法。包括二維問題的簡化、土體的本構模型,即鄧肯-張雙曲線本構模型、初始地應力場的計算方法、基坑開挖等效結點荷模擬、基本方的非線性解法、內支撐及加軸力的有限元處理等,並編制了模擬基坑開挖的有限元
  14. Preloading loads the add - in the first time that visual studio starts after placing the. addin file on disk

    Addin文件放在磁盤上后,首次啟動visual studio時,將加外接
  15. Moreover, the measured ultimate shear from the tests were compared with that predicted from china design code of reinforced concrete structures, gb50010 2002, and that from the response2000, which is based on modified compression field theory by michael collins, both were undertaken before the experiments

    文中還將試驗實測承力與我國現行混凝土結構設計規范抗剪設計公式的測值和基於修正斜壓場理論的抗剪分析response2000的分析結果進行了對比。
  16. Specifies the null delivery provider, used to preload the cache

    指定用於先加緩存的null傳遞提供
  17. First, based on the analysis to the development condition of computer and property of the input data of bridge, this paper, taking convenience and practicability as principle, develops the multi passages data - in system made up with human - computer interactive interface and excel import model. second, after comparing and analyzing to the calculation theories and methods of creep and shrinkage, clearing up the key steps of creep and shrinkage analysis, the paper takes incremental method to establish program to analyze secondary inner force caused by creep and shrinkage. third, the paper puts some optimal or simplified treatment to the contents of pre - stress and develops relative program ; in addition, through analysis to the different methods used to calculate the secondary inner force caused by pre - stress, the paper combines equivalent load method with finite element, carries out some simplified treatments, and establishes program to calculate secondary inner force caused by pre - stress

    首先,在分析當前計算機的發展狀況及橋梁結構輸入數據特點的基礎上,以方便、實用為原則,採用人機交互界面和excel輸入方式聯合的多通道數據輸入系統;其次,通過比較分析徐變收縮計算的各種理論及方法,澄清了徐變收縮分析的關鍵過,並採用增量法編製,實現徐變收縮次內力分析;再次,對應力的相關計算內容進行適當優化或簡化處理,並編制相應;另外,本文還在比較應力次內力各種計算方法的基礎上,將等效荷法結合有限元進行一些簡化處理,編製實現應力次內力的計算;最後以三個算例來校核計算方法及運行結果的可靠性,取得了期效果。
  18. Cbsa ( curved box girder structural analysis ) is programmed by this method in the environment of visual basic 6. 0 and it has friendly interface and visual forms for data input. it can analyze the loads including deadweight, prestressing force and temperature in curved box girder, output influence lines and load dynamically to calculate deformation and internal force

    採用visualbasic6 . 0編寫,具有友好的界面,可視化的數據輸入窗口,可以對彎箱梁橋的自重、應力及溫度荷等進行分析,並可輸出影響線,對彎梁進行動態加,求解活內力及變形。
  19. Applications can preload substantially more data into virtual memory, allowing rapid access by the 64 - bit extensions of the processor

    應用可以大量數據到虛擬內存,允許處理器的64 - bit擴展快速進入
  20. Considering the behaviors of unbonded prestressed concrete beams and steel reinforced concrete columns, a kind of nonconforming beam - column element was constructed and the analysis precision was improved. loading and reloading paths were introduced into the constitutive relationship of concrete. it is helpful to the analysis program to trace the full - range mechanical behavior of structures including the descending part and the hysterisis characteristic under cyclic loading

    考慮無粘結應力混凝土梁、型鋼混凝土柱等結構構件的受力特點,構造非協調樑柱單元,提高了分析精度;混凝土的本構關系中,引入卸路徑和再加路徑,使得分析可以追蹤包括下降段在內的結構全過力學行為,以及反復荷下結構的滯回特性。
分享友人