額定曲線 的英文怎麼說

中文拼音 [édìngxiàn]
額定曲線 英文
nominal curve
  • : 名詞1 (額頭) forehead:寬額 a broad forehead2 (牌匾) a horizontal tablet 3 (規定的數目) a sp...
  • : Ⅰ形容詞1 (平靜; 穩定) calm; stable 2 (已經確定的; 不改變的) fixed; settled; established Ⅱ動詞...
  • : 曲名詞1 (一種韻文形式) qu a type of verse for singing which emerged in the southern song and ji...
  • : 名詞1 (用絲、棉、金屬等製成的細長的東西) thread; string; wire 2 [數學] (一個點任意移動所構成的...
  • 曲線 : [數學] curve; bight; bought; profile; net曲線板 french curve; irregular curve; curve board; splin...
  1. Linear induction motor is an important kind of machines which have some merits such as simple structure, low cost, durability, convenience for maintenance etc. the subject of this thesis is to study a big circular ring linear induction motor, and the major works in this thesis are summarized as follows : ( 1 ) considering the effects of the finite length of primary core, one - dimension analytical solution for the air gap field is cited in this paper. based on it, the single layer winding magnetic field is studied. considering whole - pitched and short - pitched winding configuration with odd poles and half - fulled slots in both ends, the double - layer winding magnetic field is analyzed, respectively

    本文對大圓環直感應電機進行了深入細致研究,內容包括: ( 1 )本文採用有限長行波面電流作用於有限長鐵芯上的模型,引用了氣隙磁場一維解,研究了單層繞組磁場,奇數極半填槽雙層繞組在採用整距和短距時磁場的分析、比較,簡單介紹了二維解; ( 2 )用有限元軟體ansoft對大圓環直感應電機空載氣隙磁場進行了靜態分析,並分析了結果; ( 3 )用軟體進行了電壓下的瞬態分析,得到了轉矩,位移,轉速隨時間變化圖,利用單極性霍爾元件測轉速並與軟體計算結果進行了比較,採用等效電路法計算了堵轉時的最大電磁力並做實驗進行了驗證,由實驗測得了三相電流波形,並與計算結果進行了比較,對其不對稱性進行了性分析。
  2. He finds the pitch range after calculated the three important parameters through the bladed for windows software, then presents an optimized control strategy that regulate the pitch angle in terms of the wind speed. it must control the output power because the variational output power brings the variational loads. he confirms and optimizes the control strategy that the output power is the control target, the output power is divided into three parts

    將功率作為系統控制的目標,將功率分成三段進行控制,在低風速區,載荷是有限的,以功率最大化作為控制目標;在風速附近,由於處在升力斜率的變化點,功率變化較大,應盡快調整槳距角進入失速區工作,減少載荷的波動,該風速區的上下工作點要通過現場試驗的手段來確;在風速以上,使功率維持在輸出,減少功率波動,並通過bladed軟體的模擬計算對控制策略進行了驗證。
  3. Based on practical engineering experience, a suit of template for project scheduling system including the commonness of different engineerings has been customized. in addition, some special functions have been added to it. they are the updating of the completion of tasks, the relationship with the construction ration, data exchange between the scheduling system and the layout system of the drawings and the picturing of the earned curve, etc. besides, the project database has been designed in accordance with the theory and criterion for database design

    本文根據現場工程經驗,總結不同工程中存在的共性,在project2000基礎上製開發了電力安裝工程施工進度計劃模板,並且在該模板上增加了一些其特有的功能,包括:任務的更新,與施工相聯系,與施工平面布置圖中數據的交互以及利用贏得值原理繪制贏得值等。
  4. Application of skilled curve in computer - aided time quota system

    熟練在計算機輔助工時系統中的應用
  5. For resistors operated in ambient over 70, rated load shall be derated in accordance with the above figure

    當電阻使用的環境溫度超過70時,其負荷按上述下降。
分享友人