額定負載運行 的英文怎麼說

中文拼音 [édìngzǎiyùnháng]
額定負載運行 英文
rated load operation
  • : 名詞1 (額頭) forehead:寬額 a broad forehead2 (牌匾) a horizontal tablet 3 (規定的數目) a sp...
  • : Ⅰ形容詞1 (平靜; 穩定) calm; stable 2 (已經確定的; 不改變的) fixed; settled; established Ⅱ動詞...
  • : Ⅰ名詞1 (負擔) burden; load 2 (虧損) loss 3 (失敗) defeat Ⅱ動詞1 [書面語] (背) carry on th...
  • : 載Ⅰ名詞(年) year : 一年半載 six to twelve months; six months to a year; 三年五載 three to five ...
  • : Ⅰ動詞1 (物體位置不斷變化) move; revolve 2 (搬運; 運輸) carry; transport 3 (運用) use; wield...
  • : 行Ⅰ名詞1 (行列) line; row 2 (排行) seniority among brothers and sisters:你行幾? 我行三。where...
  • 負載 : [電學] load
  • 運行 : move; be in motion; run; working; machine run; operation; corotation; propulsion (影片)
  1. In view of this situation this article has conducted research to the design of metallurgy auxiliary biography with the frequency conversion table electrical machinery first multianalysis to the frequency changer and the frequency conversion table electrical machinery movement characteristic is carried out, the voltage waveform harmonious which the frequency changer outputs is big, attacks in a big way, and the voltage climbing rate reaches as high as 6600v / mu s which is 20 times ordinary sine alternating voltage, the rolling mill auxiliary biography table set the extremely strict request to the electrical machinery ; its movement frequency is very low, rate frequency in 8 - 20hz ; the velocity modulation scope is wide, the lowest movement frequency lowers to 1hz, and the starting number of times is quite frequently, each hour reaches as high as 600 - 800 time, the impact shoulders in a big way, the overload capacity request is high

    針對這一情況本文對冶金輔傳用變頻輥道電機的設計進了系統研究。首先對變頻器和變頻輥道電機的特性進詳細分析,變頻器輸出的電壓波形諧波大,沖擊大,電壓上升率高達6600v / s ,是普通正弦交流電壓的20倍;軋機輔傳輥道對電機提出了十分嚴格的要求:其頻率很低,頻率在8 - 20hz ;調速范圍寬,最低頻率低到0 . 5hz ,起動次數相當頻繁,每小時高達600 - 800次,沖擊荷大,過能力要求較高。
  2. The owner of a ship registered in a contracting state and carrying more than 2, 000 tons of oil in bulk as cargo shall be required to maintain insurance or other financial security, such as the guarantee of a bank or a certificate delivered by an international compensation fund, in the sums fixed by applying the limits of liability prescribed in article v, paragraph 1 to cover his liability for pollution damage under this convention

    在締約國登記的二千噸以上散裝貨油船舶的船舶所有人必須進保險或取得其他形式的經濟擔保,如銀保函或由國際保賠基金出具的證書等,按第五條第1款中規的責任限擔保數,以便按本公約規補償船舶所有人對油污損害所應的責任。
  3. Over load working of transformers are guided by iec905 loading guide for dry type power transformers

    按照iec905 《乾式電力變壓器導則》 ,是指導變壓器過荷(超銘牌值)
  4. The simulation results show that the power factor and efficiency of lim are much lower than that of rotary induction motor due to end effect and big air gap of lim. end effect force has a great influence on the thrust of lim. the performance of lim can be improved with the proper secondary structure, small air gap, big goodness factor or heavy load

    結果表明:受邊端效應及大氣隙影響,直線感應電機功率因數及效率較低;狀態下的邊端效應力對電機推力有較大影響;設計電機時選用合適的次級材料、減小氣隙、增大品質因數、增加都可提升電機的輸出性能,通過設計有效的控制演算法可使電機在滑差下具有較高的效率。
  5. Under different load, when we apply this software to any time, region and cooling way, we can get the hottest spot increment and aging rating. to manufactory, the software means sounder thermal design, which will meet the load, putted forward by user, while to user, the software equal to a master who can help them decide the capacity rating of the transformer, which will fit the load. by using the software, the potential danger and the waste, caused by unfit load choice may be avoided

    研究開發了計算乾式電力變壓器能力的計算軟體,可對于各種絕緣結構,各種冷卻方式和任一地區、任一時間下的變壓器在不同荷下的最熱點溫升絕緣老化率進分析和計算,同時利用該軟體製造廠可以依據用戶提出的量給出相應的熱設計方案,用戶可根據情況利用軟體計算所需變壓器的容量,避免容量選擇不當造成隱患和浪費。
  6. 3 ) based on the research on battery discharging strategy, diesel strategy and battery & diesel strategy, strategies of dispatching system energy are presented, such as load follow strategy, frugality strategy and rated power - minimum operation time strategy. several strategies of dispatching system energy are studied

    3 )在研究蓄電池充放電策略、柴油機策略以及蓄電池和柴油機綜合策略的基礎上,提出了風光柴蓄復合發電及智能控制系統的能量調度策略,即跟隨策略、節約型調度策略和功率最小時間策略。
  7. Rated load operation

    額定負載運行
分享友人