類型試驗 的英文怎麼說

中文拼音 [lèixíngshìyàn]
類型試驗 英文
type test
  • : Ⅰ名1 (許多相似或相同的事物的綜合; 種類) class; category; kind; type 2 (姓氏) a surname Ⅱ動詞...
  • : 名詞(古代占卜用的器具) astrolabe
  • : 動詞1. (察看; 查考) examine; check; test 2. (產生預期的效果) prove effective; produce the expected result
  • 類型 : type; mold; form; cut類型論 theory of types; 類型語句 [計算機] type statements
  • 試驗 : trial; experiment; test
  1. The main contents of testing the strength of subgrade abamurus using earthquake wave velocity are as follows : the influence of the lithology and strength of flag stones and the shape of block upon wave velocity, the influence of the strength of cement mortar upon earthquake wave velocity, the estimation standards of the strength and completion of abamurus. this paper puts forward an accurate no - destructive testing using the different reflect of elastic wave velocity for abamurus stones, the strength of mortar, the plumpness of mortar and the type of abamurus, on the basis of laboratory tests and field tests. it can be used to accurately distinguish the completion of abamurus

    地震波速法檢測路基擋墻強度,研究的主要內容有:片石巖性和強度及塊體形體對波速的影響;水泥砂漿強度對墻體波速的影響;擋墻整體強度和完整性的評估標準。應用彈性波速度對擋土墻石材、砂漿強度、砂漿飽滿度及擋墻的不同反映,在室內外模和現場生產的基礎上,提出了一種正確的無損檢測法,可以正確判別漿砂片石擋墻墻身的完整性。
  2. Based on the treatment engineering of 26 kilometers lacustrine deposits soft soil foundation in han - sha sect of yi - huang freeway, the paper, through the means of centrifugal model test and field observation, establishes mathematical analysis model, completely and detailedly researches and analyses the stability of lacustrine deposits soft soil foundation and the rule of settlement, guides the large - scale construction of yi - huang freeway 26 kilometers soft foundation treatment, educes the settlement characteristic and the rule of lacustrine deposits soft soil subgrade, summarizes the scientific measure of effectively controlling the stability and settlement of such kind of foundation

    本文以宜黃高速公路漢沙段中的26公里湖相沉積軟土地基的處理工程為依託,通過採用離心模與現場原位監測相結合的手段,建立數學分析模,對湖相沉積軟土地基的穩定性及沉降規律進行了全面、細致的研究與分析,指導了宜黃高速公路26公里軟基處理的大規模施工,得出了湖相沉積軟土地基路堤沉降特性及規律,提出了有效控制此地基穩定性及沉降的科學措施。
  3. The following results of recent researches were presented on measuring stiffness of a wide range of soils such as clay, sand and gravel, characterizing anisotropic properties of soil induced by external loading, measuring stiffness of base and subgrade materials in the pavement, determining soil properties in a centrifuge model during the flight of a centrifuge, and understanding wave propagation in granular materials under micro - gravity environment with this technique

    木文報道了壓電陶瓷傳感器應用於粘土、砂和礫石等不同種土的研究成果,對應力導致土體各向異性的研究,對路基和地基土的力學特性檢測,在離心模中的應用,以及在微重力環境下的粒狀材料中波的傳播特性的研究等。
  4. A good many case of approaching excavation are studied in this article, such as the study of infection of be coal mining to the huayingshan tunnel, technology study of strucked tunnels of metro in shenzhen, countermeasure study of tunnel approaching pile foundation of metro in guangzhou, excavation methods optimized of large cross section subaqueous tunnel approaching pile foundation of lrt in chongqing, etc. on the basic of analysing and concluding relative study production all over the the world by the numbers, classification of approaching excavation, partition of approach zone, formula of partition of approaching zone, approach degree and countermeasure grade of generalized approaching excavation of underground works are put forward. general methods studying and trea

    本文結合作者多年來對華鎣山隧道減少壓煤量研究、深圳地鐵重疊隧道第11頁西南交通大學博士研究主學位論文技術研究、廣州地鐵公紀區間廣紡聯段鄰樁施工對策研究和重慶輕軌大坪大斷面車站鄰近基礎淺埋暗挖工法優化分析等諸多近接施工問題案例的研究,在系統分析和歸納總結國內外相關研究成果的基礎上,系統地提出了廣義的地下工程近接施工的分、分區、分區指標表達式、近接度與對策等級概念以及分區、分度準則,給出了研究和解決近接施工問題的普遍方法,如數值分析先行,模、現場測證等。
  5. The seismic behavior of longitudinal middling - high r. c shear wall with frame column is discussed through model experimentations and finite element methods in this paper, after taking frame - shear wall structure of a main factory building of the large capacity power plant as experimentative prototype. the major work as follow : in order to appliance pseudo static test, the longitudinal middling - high r. c shear wall with frame column in the large capacity power plant ' s main factory building has been simulated to a model structure with 1 / 15 reduced - scale. the contents of study are process of cracking, course of damage, skeleton curve, rigidity degradation, ductility characteristic etc. that the seismic behavior of this kind of middling - high r. c shear wall is excellent has been proved by chubby hysteretic curve and fine capacity of energy dissipation

    本文以某大火電廠主廠房縱向框架一剪力墻結構為原,通過模和有限元分析,研究了縱向帶邊框柱中高剪力墻結構的抗震性能問題,主要內容有:選用1 15縮尺比把某大火電廠主廠房縱向帶邊框柱剪力墻原結構模擬為一個模結構,並進行了偽靜力,研究了這縱向帶邊框柱中高剪力墻結構的開裂與破壞過程、骨架曲線、剛度退化、延性性能等問題,滯回曲線飽滿,消能能力強,說明此中高剪力墻的抗震性能較好。
  6. Rubber - test rule for distribution type of testing data

    橡膠數據分佈規定
  7. In this paper, the influence of ship ' s tonnage, ship ' s carrying quantity and ship type on the ship ' s mooring force is studies through model experiments

    通過模研究船舶噸位、船舶裝載量及船舶對船舶系纜力的影響。
  8. Fume cupboards - part 3 : type test methods

    通風櫃.第3部分:類型試驗方法
  9. Gas cylinders - residual pressure valves - general requirements and type testing

    儲氣瓶.剩餘壓力閥.一般要求和類型試驗
  10. Transportable gas cylinders - cylinder valves - specification and type testing

    可運輸的氣體瓶.氣體瓶閥門.規范和類型試驗
  11. Testing of valves - fire type testing requirements iso 10497 : 2004 ; german version en iso 10497 : 2004

    閥門的測.防火類型試驗要求
  12. Bituminous mixtures - material specifications - part 20 : type testing ; german version en 13108 - 20 : 2006

    瀝青混合物.材料規范.第20部分:類型試驗
  13. Information technology. open systems interconnection. conformance testing methodology and framework. part 6 : protocol profile test specification

    信息技術.開放系統互連.合格方法學和框架.第6部分:協議類型試驗規范
  14. Gas cylinders - gas cylinder valve connections for use in the microelectronics industry - part 2 : specification and type testing for valve to cylinder connections

    氣體瓶.微電子工業用氣體瓶閥連接件.第2部分:氣體瓶與閥門連接件的規范和類型試驗
  15. The original types of test devices are obtained through technically reforming traditional types of test machines. up to day mere are no available test devices for elastic modulus e of plain elastomeric bearings, which possess automatic control function

    原有的此裝置基本上是在其它類型試驗機基礎上經一定技術改造而來的,到目前為止市場上尚未有專用的具有自動控制功能的板式橡膠支座力學性能e的測裝置。
  16. In our country, no pull - out test of pressure - type anchor has ever been made in rock till now. in chapter 4, consulting some pull - out tests of pressure - type anchor made by some civil researchers, contrast pull - out tests of pressure - type and tensile - type anchor in rock is designed in crag slope engineering in chongqing university

    本文第四章在在參考國內一些單位已經進行的部分壓力錨桿抗拔的基礎上,針對基於巖層的該類型試驗還是空白的現狀,結合重慶大學沿江危巖邊坡治理工程設計了巖層中的壓力錨桿與傳統拉力錨桿抗拔力對比實
  17. Bearing capacity and displacement are two main problems in the application of geotechnical engineering. based on a series of pull - out tests using three kinds of paper and a sort of window screening as geogrid, twenty - seven in limit and several in working - stress geogrid - reinforced slope model tests designed through orthogonal principle have been conducted to have obtained the relationship between the bearing capacity and four factors ( i. e. reinforcement, angle of reinforced slope, the designed - length of reinforcement and the distance between layers of reinforcement ). the law of slope lateral ( horizontal ) displacement versus to the height of slope vary with external - load was derived from the model test data, and the main factor affecting the lateral and vertical displacement of geogrid - reinforced slope was obtained through analysis

    承載力(強度)和變形是巖土工程應用領域的兩大主要問題,本文以紙和窗紗布模擬加筋土邊坡的土工格柵,在一系列拉拔的基礎上,以正交設計理論分別安排27個極限應力狀態和若干個工作應力狀態加筋土邊坡模,並以模獲得的數據為依據,採用誤差、極差及回歸分析方法,探討了加筋土邊坡承載力與筋、筋長、層間距、坡角4因素的相關關系,獲得了在外荷載作用下加筋土邊坡的側向位移隨坡高的變化規律(並進行了定性解釋)和坡頂的豎向位移特性,並分析其主要控制因素。
  18. Systematical analyses of rules as well as their responding effective aspects of critical displacements for various piles were made by direct shear friction test, model test in room, deep well load test and static load test of pile

    摘要通過室內直剪摩擦、室內模、深井荷載和樁基靜載,研究了各樁的臨界位移的規律及其影響因素。
  19. Since the movement of flows and boundary conditions of the natural rivers with too many variables are extremely complicated, it is unable to reveal the behaviors by using of the present theories and experience in this area. the river hydraulic experiments are playing important roles to solve these problems

    由於天然河道水流及河床邊界變化極其復雜,且相關變量太多,很多問題非現有理論所能描述,也難根據以往經得到解決,因此河道水力模就成為解決這復雜問題的重要手段。
  20. On the basis of model test, a better construction method under pre - prop for the surrounding rock i, ii, iii, named whole section excavation with heading in moderate degree and that with center heading and center partition first, then with two sides heading, is put forward

    在模的基礎上,提出了、 、圍巖隧道在預支護下的優化施工方法,即下導洞適度超前全斷面開挖與先行中導洞及中隔墻、其次兩側下導洞適度超前全斷面開挖。