風化破碎 的英文怎麼說

中文拼音 [fēnghuàsuì]
風化破碎 英文
detrition
  • : Ⅰ名詞1 (空氣流動) wind 2 (風氣; 風俗) practice; atmosphere; custom 3 (景象) scene; view 4 ...
  • : Ⅰ動詞1 (完整的東西受到損傷) be broken; be damaged 2 (使損壞) break; break down; damage 3 (使...
  • : 動詞[書面語] (觸; 撞) strike; bump
  • 風化 : 1 (風俗教化) morals and manners; decency 2 [化學](化合物失去結晶水) efflorescence3 [地] (地...
  • 破碎 : 1. (破成碎塊的; 零碎的) tattered; broken 2. (使破成碎塊) smash [break] sth. to pieces; crush
  1. Global tempered glass ltd. nowadays, tempered glass is widely used on commercial and household facilities, the main reason is having the high safety and the level of anti - brokage qualities is far exceed the general glass up to 4. 5 times. if it is broken, they will become granular shape, so people may not easy suffering from injuries

    今時今日,強玻璃已經被廣泛應用在商業及家居設備上,主要原因是它有極高的安全性,其抗損程度是普通玻璃約4 . 5倍,倘若的話,它們會變成顆粒狀,不易傷人,故被廣泛應用於車前擋玻璃,燈飾配件?爐前屏現代玻璃家?及各類高級電器等等。
  2. A one - dimensional oceanic mixed layer model with the m - y level - 2. 5 turbulence closure schemes is employed. the rate of energy loss by breaking waves is estimated by parameterization and incorporated into the model as a source of turbulence kinetic energy ( tke ) by modifying the existing surface boundary condition of tke equation. the velocity field and turbulence energy budget are calculated under different forcing conditions ( the results given below are for a wind speed of 20 m / s. )

    採用一維2 . 5階湍封閉混合層模式,根據參數方法對波浪導致的能量耗散率進行了估計,通過改變湍動能方程的上邊界條件引入波浪對湍動能生成的影響,計算了不同應力強迫下的混合層流場結構和湍能量收支(下述給出的結果是取速為20m s得到的) 。
  3. A brief introduction is given to the treatment of the zeya dam foundation, principles of seepage control and design of the concrete face rockfill dam of the zeya reservoir. as for the excavation of the sand - gravel zones, except the toe slab and its 1 / 9 bottom width down stream, the alluvial layers are excavated to the micro - weathered rocks, while the other sections remain unexcavated. regarding to the treatment of the fracture zones, concrete filling is used for the toe slabs and semi - permeable materials are used for other section. according to the construction characteristics, a filter is placed in the down stream embankment foot. to improve the integrity of the dam foundation and anti - seepage capability consolidation grouting and curtain grouting are adopted. as a result safety, economic benefit, convenience in construction and good performace are achieved

    簡要論述澤雅水庫面板堆石壩壩基處理和防滲的原則及設計要點.趾板基礎和堆石體各區砂礫石基礎開挖,除趾板與其下游1 / 9底寬范圍以及壩腳挖除沖積層至弱(局部微)基巖外,其餘部分均予以保留.斷層帶處理,趾板部位採用混凝土塞,其它部位採用半透水料置換,並根據本工程特點在下游壩腳加設了反濾層.為提高壩基的整體性和防滲性能,對趾板進行了固結和帷幕灌漿.達到了安全、經濟、便於施工的目的,運行情況良好,可為面板堆石壩的設計和研究提供參考與借鑒
  4. For the scouring and depositing equilibrium stream, the dominating factor resulting in gravel decrescence was stroking, weathering and grinding

    對于基本沖淤平衡的河流,卵石沿程細的主要原因是碰撞和磨損。
  5. To avoid dust pollution, an impulse bag filter will be used to collect dust from crusher and discharging points of belt conveyor. purified air will be drained to the atmosphere

    為避免粉塵污染,車間設有氣箱脈沖袋收塵器一臺,抽取機及帶式輸送機下料處的含塵氣體,經收塵器凈后的氣體由排機排入大氣。
  6. Our factory increase a set of intensifier with non - grade - adjustable rating speed to form the intensive air drying, the wet material mixed with hot air fully by screw feeder in the intensifier and material surface is crashed into fine granules and moving to the outlet as well as drying, under rapid rotating hitting and pushing. in the long run, the materials get a further even drying in the dryer pulled by the wind force and those wet and weighty granules the wind force can not pull continue to be crashed, dried until they are pulled by the wind force into the dryer

    我廠強型氣流乾燥是在基本型上增加一套轉速可以無級調節的強器組成,濕物料通過螺旋加料器進入強器后和熱氣流充分混合,在飛速旋轉的擊刀擊和推進下,物料被成細顆粒,在乾燥同時向出口移動,最後在力吸引下進入乾燥管,進一步均勻乾燥,力無法吸引的濕重顆粒繼續被擊、乾燥、直至能被吸起進入乾燥管。
  7. Internal waves are a kind of bridge relating the diapycnal mechanical mixing to external sources of mechanical energy : first, internal waves are driven by wind stress and barotropic tide so that large amount of mechanical energy are transported to abyssal ocean with propagation of internal waves ; second, the mechanical energy can directly be cascaded to mixing through instability and breaking of internal waves

    內波是外界提供的機械能與混合之間聯系的橋梁之一,一方面和潮汐通過激發內波,將能量向深海和大洋內區傳遞,另一方面,內波的不穩定和直接將機械能串級到小尺度湍流混合中去。開展傾斜地形上內波的傳播以及內潮的產生等方面的研究對海洋混合過程的參數以及混合對大洋環流的影響等方面的研究具有重要的科學意義。
  8. Because of the uncertainty of the geological factor, the complexity of high slope project and the particularity of anchor cable project, after the slope is excavated, according to slope ' s stratum rock, weather degree, broken degree, split surface, slope body structure and moisture state, etc, check, analyse and judge reality synthetically, protect and strengthen and design dynamically the high slope, guarantee the stability of slope body and security structure

    摘要由於地質因素的不確定性,高邊坡工程復雜性和錨固工程的特殊性,待邊坡開挖揭示后,根據邊坡的實際地層巖性,程度、程度、構造裂面、坡體結構和含水狀態等因素,綜合校核和分析判斷是否實際,對高邊坡防護加固進行動態設計,確保坡體穩定結構安全。
  9. The geologic condition of side slope is complex. it is composed of soil and intense weathering rock on the surface and slightly weathering rock under the surface. further more, it has many faults, fissuring and weak intercalations

    其水電站尾水渠高邊坡所處區域地質條件復雜,邊坡表面由幾米至十幾米厚的坡積土和強風化破碎巖石組成,下部是弱和微巖石組成,且斷層、節理和軟弱夾層分佈廣泛。
  10. These landslides go with fluidization peculiarity different degree in course of their motion, and their speed and distance increase several times because of the fiuidization, thereby the disaster area greatly broaden. on the base of above, the paper studies systematically the fluidization of large high - speed rockslides in all its aspects : analyzed the aerodynamic effect in the short - range on the base of the wind turmel experiment, studied the effect of falling into pieces when landslides collides mountain ; studied the accelerating effect through high - speed collide experiment of landslides model ; and the paper reappear the overall process including set - out, collide in the short range, debris flow in the long - range of touzhai large landslide via distinct element method ( dem ), studied the flow law and equation of different type of debris flow resulted from large landslide. as a sample to apply, the paper analyzed fluidization mechanism of touzhai landslide

    基於這一點,本文對大型高速巖質滑坡的流體現象進行了全面而系統的研究:通過洞模型實驗,研究了大型高速滑坡凌空飛行階段的空氣動力學效應,研究了飛行中滑坡巖體在與途中不動山體發塵碰撞時的解體效應,通過滑坡巖體高速碰撞模型實驗研究了滑坡巖體解體後部分巖體的加速運動效應,並應用離散單元法再現了雲南頭寨溝大型滑坡啟動高速、近程碰撞、遠程屑流運動的全過程,研究了巖體解體后形成不同類型屑流的運動規律及運動方程,並對頭寨滑坡流體運動機理進行了實例分析,取得了以下主要結論和成果: ( 1 )對于大型高速滑坡,大多在啟程活動階段已獲得了高速,這使得這類滑坡在其離開剪出口之後以凌空飛行的形式向前運動,在其飛行過程中,滑坡巖體與空氣強烈作用,並產生空氣動力學效應,滑坡巖體在因碰撞而產生的解體效應及部分巖體的加速運動效應的作用下,在遠程活動階段,以高速屑流的形式向前運動。
  11. Weathering applies to crumbling and breaking down of rock into smaller pieces.

    指的是巖石或崩裂成小塊。
分享友人