風鉆鉆機 的英文怎麼說

中文拼音 [fēngzhēnzhēn]
風鉆鉆機 英文
drifter drill
  • : Ⅰ名詞1 (空氣流動) wind 2 (風氣; 風俗) practice; atmosphere; custom 3 (景象) scene; view 4 ...
  • : 鉆Ⅰ名詞1. (打眼用的工具) drill; auger 2. (指鉆石) diamond; jewel Ⅱ動詞(用尖物在另一物體上轉動) drill; bore
  • : machineengine
  1. Production electric drill, hammer, corner angle grinder, straight - sand, water mill, stone cutting machine, electric circular saws, profile cutting machine, carving machine, suction fan blowing, scissors, and other electric tools

    生產電、電錘、角向磨光、直砂、水磨、石材切割、電圓鋸、型材切割、雕刻、吹吸、電剪刀等各種電動工具。
  2. Abstract : three - stage dust removal system of impinger, centrifugal dust collector, wet fibre - grid scrubber applying to dust collecting of driller in opencut mine is reported in this paper. the operational results show that this system has stable operation, higher dust removal efficiency, less drop pressure and dust concentration of outlet of the system meets emission standard

    文摘:介紹了用慣性除塵器、旋除塵器、濕式纖維柵除塵器組成的三級串聯除塵系統進行露天礦的收塵,運行結果表明該系統運行可靠,阻力小,除塵效率高,系統出口含塵濃度達到排放標準。
  3. One reason for the excellence of horng chii machines is our dedication to research and development

    多年來潛心研最新製鞋技術,造就鴻綺械的完美范。
  4. One hole is for a microphone and camera

    探的其中一個洞是放下麥克和攝像
  5. The drill may have hit a sealed shaft, away from the miners

    可能到了一個密封通井,偏離了通往礦工被困地點。
  6. Our various products included : series38 50 open window spring door, series 46 spring door, series 64 70 73 75 76 80 81 82 90 112 push - pull window and series 360 degree versatile multi - function patent push - pull window, series 110 120 130 semi - hidden frame glass screen and wall profiles, over 100 series especial industrial profiles, eg : ceilings, cabinet, curly door, and bathroom and other ornate materials etc. over 2000 specification powder spraying and eletrophoretic coating profiles, products color series such as : based bronze, silver white, lusterless etc

    主要的系列有: 110 120 140系列半隱框明框玻璃幕墻天花地板線口衛浴壁櫃折疊門空氣凈化等系列。我司引進了數碼線切割沖壓孔等深加工設備,主要生產鋁製品:有電殼音響散熱器移動軟盒嬰兒車沙灘椅等達100多個系列, 3500多個品種。顏色有古銅色銀白色亮銀砂銀黑色等多種色彩。
  7. Gravel layer is a usual complex instable formation in drilling engineering. there are some basic features such as looseness of structure, increment, unequal sized grain. it is commonly to form discrete single - grained structure

    在三個計算式的基礎上採用visualbasic編制了潛孔錘同心跟管量、壓計算及空壓選型程序。
  8. Masonry drills. tapers of hammer drills

    磚石砌工用.的錐度
  9. Introduction : not go envy gba 89509 sometimes global popular game drilling to jerry, finally landing to our flash

    不用再去羨慕gba的玩家,全球靡的掌游戲地小子終于登陸到了我們的flash世界!
  10. With an introduction to the construction of underground diaphram wall in fumin station, shenzhen city, this paper discusses the construction technique of forming dent into much and lightly weathered granite layers. which adopts hydraulic grab and different kinds of impacting drillers, and the construction of good quality protecting wall with mortar

    摘要通過深圳地鐵福民站地下連續墻施工實例,介紹在中、微化花崗巖層,採用液壓抓鬥結合不同類型的沖擊和利用優質泥漿護壁的成槽施工技術。
  11. Optimum design for construction management by limiting the period of survey, drilling, loading and exploding, ventilating and transporting is intensively studied and the applicability of boosting the speed of construction by well organization of space, manpower and machine is fully illustrated

    論文重點闡述了通過縮短測量劃線、眼、裝藥爆破、通排煙、裝碴運輸作業時間,達到快速施工組織設計優化的目的,說明了採用爆法施工充分利用隧道空間,合理配備人力、械,隧道開挖施工進度得到提高的可行性。
  12. Engine type : air - cooled 4 stroke ohv single cylinder

    發動類型:單杠冷四沖程頂置氣門孔敲68mm45mm
  13. Air leg mounted drill

    動支架
  14. The diamond shaped canopy provides 85 % frontal coverage ; the crosswind compensation effect can also be clearly felt during fast forward flight

    石狀菱形身包覆性達到85 %以上,高速航道飛行時,針對側面抗之特性尤其明顯。
  15. Model tc308 high pressure crawler type down hole drill rig for open use

    中高壓潛孔在中深孔鑿巖中的試驗應用
  16. Severe protests from local residents living along mrt routes during the route alignment coordination caused a two - year delay to the proposed schedule for the hsingchuang line. therefore, to reduce the extent of tunneling is a key consideration in the long - term planning of mrt routes. other downsides to the single tunneling method are that it requires longer construction time, and that two break throughs from the tunnel to the work shaft involve a higher construction risk

    另因採用單孔潛盾隧道須掘上、下行隧道,除施工時程較長外,且兩次破鏡將增加施工之險,故有鑒于潛盾之技術日新月異,國外已有採用多圓形潛盾工法( mf工法)之成功案例,此除可減少用地徵收補償之困擾外,且可減少隧道開挖面積進而減少棄土所造成之問題。
分享友人