首期建築 的英文怎麼說

中文拼音 [shǒujiàn]
首期建築 英文
priority construction
  • : Ⅰ名詞1 (頭) head 2 (首領) leader; head; chief 3 (表示方位) aspect 4 (姓氏) a surname Ⅱ動...
  • : 期名詞[書面語]1. (一周年) a full year; anniversary 2. (一整月) a full month
  • : Ⅰ動詞1 (建築) build; construct; erect 2 (建立; 設立; 成立) establish; set up; found 3 (提出;...
  • : 築名詞(貴陽的別稱) another name for guiyang
  1. The wuhan company has commenced “ evergrande noble wonderland ”, “ evergrande jinbi world ”, “ evergrande green island ” and “ evergrande town ”, with building area of 1. 2 million square meters for commenced initial phase, and total floorage is approximately 3 million square meters

    目前在武漢的恆大華府、恆大金碧天下、恆大綠洲、恆大城四個大型項目已全面啟動,開工面積達120萬平方米,總面積約300萬平方米。
  2. It includes plan on human resources, employment, development and training, achievement and assessment, reward and encouragement, building - up enterprise culture, and so on. this passage is divided into four sections : first, it analyses human resources management theory in order to maintain close ties with reality. second, through perspective of present human resources management status in huaxia bank, shenyang branch and comparison with that of foreign capital banks, in the end we get human resources management methods to huaxia bank, shenyang branch, we resist impulsion of foreign capital banks and catch hold of some points like organization design, position management, application and lection, training and development, performance management, compesation management

    全文共分四個部分:先分析人力資源管理理論,目的是為了更好地聯系實際,其次通過透視華夏銀行沈陽分行人力資源管理現狀,以及與外資銀行的人力資源管理進行比較,最後得出華夏銀行沈陽分行人力資源管理對策,對策的提出是為了對抗外資銀行帶來的沖擊,本著與國際慣例接軌的原則,抓住組織設計、職位管理、招聘選拔、培訓發展、績效管理、薪酬管理幾個環節,提出全新人力資源管理理念,完成人力資源管理實踐活動,形成人力資源管理戰略,達到員工望和需要,最終構出以實現企業戰略和企業文化及價值觀為根本目的的人力資源問題解決方案,以應對入世后國內外銀行的激烈競爭,使華夏銀行能在未來的幾年內,立起以「用真誠凝聚人才,用培訓提高人才,用利益驅動人才」的人力資源管理機制,構人才高地,積極引進潛力,滿足華夏銀行入世后轉型再造和創新發展對人才的需要。
  3. Yangon, the cosmopolitan capital city of myanmar, still maintains its colonial charm with wide tree lined avenues, tranquil lakes, and gracious turn of the century architecture. the magnificent shwedagon pagoda dominates the city skyline, while at street level yangon is a paradise for hunting out a variety of exotic arts and crafts

    仰光是緬甸的都,交通發達,至今還保留著英國殖民時上行列整而迷人的林茵路,清澈平靜的大湖和形熊蕭灑的百年物,屹立在市區中莊嚴的大金塔。
  4. Also known as chinsheng lane, this lane was built with many turns and curves to prevent the entry of bandits and avoid damage from the september winds. in todays modernized nine - turns lane you can still feel a highly unusual sense of space. at one place an elevated corridor connects buildings on the two sides of the lane, giving access to shih yi hall ; according to legend, this was a meeting place for the literati. beside it is the gun tower, which in early times was used for defense

    於昭和10年西元1935年,是日治時鹿港最高行政長街長的公家宿舍,本棟由第二任街長吉田秀次郎負責督導興,先後經歷了6位日籍街長在此泊宿,地址為鹿港鎮民權路160巷2號,位於鹿港鎮公所之右側,歡迎民眾于假日時來鹿港參觀!
  5. Although these works analyzed here represent only a portion of naito ' s architecture vision, they reveal the figure of architecture as timeless and providing continuity within relentless change. chapter 3 expound naito ' s course of design and some main influence factors forming naito ' s conception of " protoform " especially. section three ( chapter 4 to 5 ), a conclusive part, explains the fact that naito ' s conception of " protoform " in architectural activities exerts an influence on today ' s japanese architecture, and it also summarizes the special contribution making by naito ' s conception of " protoform " in architectural activities

    先,第三章通過分析在他近二十年的創作中,不同時里的公共和住宅的代表作品,來體現他始終堅持的思想以及對「原生形態」的的不懈探索;隨后,第三章將並不為大家所知的五十年代生日本師內藤廣的創作歷程予以介紹,並論述了內藤廣探求「原生形態」的思想的主要影響因素。
  6. Firstly, for normal high building, second - class measurement could meet the needs of sinking survey ; secondly, the location of survey should be based on the design drawing and choosing the first structure layer as a survey period ; thirdly, the arrangement of the results of sinking survey should be regular and accurate by a certain person, and if there is problem present, it should be solved or done away with in time ; finally, the results of building sinking survey should be fed back in time to survey, design and construction units as reference for the next project

    先對一般的高層物來說,只需二等水準測量即可滿足沉降觀測的要求;其次,對于沉降觀測點及觀測的周,通常要按照設計圖紙的要求布設觀測點,觀測的周一般以一個結構層為一個觀測周;第三,對沉降觀測結果的整理,要定定人及時準確,發現問題要及時解決處理;最後,物沉降觀測的結果要及時反饋給勘察、設計和施工單位,為下一步的勘察、設計和施工提供可靠的參考依據。
  7. Multi - span plastic greenhouse structure design theory has been studied systemic which include design loads, design methods and system optimization designs aimed at the situations above - mentioned, meanwhile, theory analysis and designs have been completed for series east - china multi - span plastic greenhouses in accordance with the local climate characteristic. some elementary conclusions are summed up : ( 1 ) in the aspect of multi - span plastic greenhouse structural design loads researches, based on the contrast analysis of loads provided in foreign and chinese standards, analysis and discussion are mentioned about the definition loads, the estimation and load cases for multi - span plastic greenhouse structural design in details, some conclusions are summed up first : i, wind load : under the present conditions, it is unnecessary to

    得到一些初步的結論: ( 1 )在連棟塑料溫室結構設計荷載研究方面,從分析比較國外關于溫室及我國工業與民用設計荷載規范的角度出發,針對連棟塑料溫室結構設計中的荷載定義方法、計算取值、荷載組合等進行了較深入的探討和分析,次得到以下結論: 、風荷載:在現有條件下,考慮風壓高度變化系數、陣風作用因子和風荷載體型系數,按中國結構荷載規范( cbj9 ? 87 )計算風荷載是可以的,不必進行重現博士學位論文摘要修正。
  8. It analyses the distinctive local building styles in different historical periods, including their characteristics, backgrounds and the culture they embody

    先針對廈門各個歷史發展時所形成的特色形態,對它們各自的特徵及其體現的文化內涵進行了分析。
  9. Firstly, made a discussion on the theory of application of solar building, introduced the condition of application of solar build both here and abroad. secondly, take apart and sum up to the two solar application style at large, put forward the correlation technique point of the solar bask & solar water heater, point out their develop direction, discuss the method of building policy to promote solar apply, hoping that we can promote the development of chinese solar building

    先對應用太陽能進行了理論探討,介紹了國內外應用太陽能的情況,然後分別對與我國現實情況聯系緊密的兩種類型的太陽能應用進行了詳盡剖析和實踐總結,提出太陽能採暖、太陽能熱水器應用於的相關技術要點,指出它們分別的發展方向,並探討了我國法規中可制定的促進太陽能發展的措施,以對我國的太陽能發展起到推動作用。
  10. Earl resort hotel by huang town government and wang super group taiwanese together with wang super group full funding of hk 2 billion, huang town government land use rights, according to international standard four - star hotel construction ; is a collection of the housing works, restaurant, conference, leisure and entertainment resort - type multi - purpose four - star tourist hotel built a total of 1, 550 acres villa, a total construction area of 20, 000 square metres of business first

    伯爵山莊是由黃江鎮政府與泓凱集團臺資共同合作,其中泓凱集團全額出資港幣2億元,黃江鎮政府以土地使用權合作,按國際四星級酒店標準興是一家集房務餐飲會議休閑娛樂等多功能渡假型四星級旅遊酒店山莊佔地面積共1550畝,營業面積共20000平方米
  11. The professional architectural degree programme consists of two consecutive programmes ; one which extends three years leading to the degree of bachelor of social science ( architectural studies ), followed by two years of graduate work leading to the degree of master of architecture

    此乃專業課程,階段是為三年的社會科學()學士課程,第二階段是為兩年的學碩士課程。
  12. The first building work is beginning again at cobham in order to erect the permanent building for the professional squad with changing rooms, meeting rooms, gymnasium, rehabilitation, office and canteen facilities

    工作已經開工,目的是為專業球隊議一所持久的更衣室,會議室,健身室,調養室,辦公室和食堂。
  13. Pwsc endorsed a commitment to carry out site investigations and to engage consultants to carry out the planning of the overall phased development, a schematic plan for phase 1, a detailed design study and contract documentation for the initial two buildings and associated landscaping and external works of the proposed science park at pak shek kok at an estimated cost of 54. 8 million in money - of - the - day prices

    工務小組委員會通過開立承擔額,為擬議的白石角科學園進行地盤勘測工作及委聘顧問進行整體分發展規劃擬訂第1的計劃大綱,以及為兩幢物相關的環境美化工程和外部工程進行詳細設計研究和擬備合約文件,按付款當日價格計算,估計費用為5 , 480萬元。
  14. First, start with the relation of the project culture and enterprise culture, this paper point out the question that the project management operation in china starts too late. the construction profession popularize leg management experience since the 1987, it just gradually become the new management system that the engineering project management is core. at the same time, the chinese socialism market economy is just to establish soon, proceed perfect is a complicated process over a long period of time

    先,本文在大量調查研究有關資料的基礎上,從項目文化與企業文化的關系入手,指出由於設項目管理運作在中國起步較晚,行業從1987年推廣魯布革管理經驗以來,才逐步形成以工程項目管理為核心的新的經營管理體制,同時中國社會主義市場經濟剛剛立不久,進行完善是個長復雜的過程。
  15. Abbs i ( r. 1588 - 1629 ) brought the dynasty to its peak ; his capital, efahn, was the centre of safavid architectural achievement.

    阿拔斯一世在位時( 1588 1629 )是薩非王朝的顛峰時都伊斯法罕成為薩非成就的中心。
分享友人