馬泉河 的英文怎麼說
中文拼音 [mǎquánhé]
馬泉河
英文
maquan he-
The groundwater, flowing towards east, outflow a part in yuan jiapo and wentang spring aside luo river, and the rest majority completely drain in the bottom glade of yellow river and its nearby springs - mafen and chunv spring
這股東流的地下水,在洛河袁家坡和溫湯泉排泄一部分地下水,最終全部排泄到本區最低排泄點? ?黃河及其附近的馬瀵泉和處女泉等。The border facies did not appear at the south edge of tiaohu seg. in the basin, the braided river facies and braided delta facies were only found at the foot of chahaquan palaeohigh in the west - south edge of the basin, the meandering delta was found from mazhong structural belt to fangfangliang horseback, and the other area were found covered by the shallow and fairly deep lake facies
條湖凹陷南緣蘆草溝組未見邊緣相沉積;岔哈泉古隆起處見少量辮狀河相及辮狀河三角洲相沉積;方方梁凸起東部至馬中構造帶發育曲流河三角洲相;其餘地區則均為濱淺?半深湖相沉積。The jinan spring catchment is a complicated karst water system, the following major work had been done in order to discuss the proplem of spring protection and water supply. 1. having conduced exploration, experiment and comprehensive research, the southern boundary of the jinan spring catchment is determined to be the surface water divide ( changecheng mountain ), the source of yufu river and baedasha river ; the northern one is the carbonniferous and permian strata, together with the igneous rock mass in the north of jinan, and the eastern and the western ones are dongwu and mashan faults respectively, which are weakly permeable boundaries. the total area of the spring catchment is 1486 km2
濟南泉域為一復雜的巖溶水系統,為了探討保泉供水問題,主要做了以下工作: (一)經過勘查、試驗和綜合研究確定濟南泉域邊界是:南邊界為玉符河、北大沙河源頭的地表水分水嶺(即長城嶺) ;北邊界為濟南北部的石炭、二迭系煤系地層和巖漿巖體;東、西兩側分別以弱透水的濟南東部的東塢斷裂和西部的馬山斷裂為邊界。Although the malinan water supply project was scheduled to be completed in a month s time, the people s concerted effort shortened the work time by about half. two water towers were built - one at the river s source to collect uncontaminated spring water flowing from between the rocks, and the other on level ground conveniently accessible to the people. the water towers were connected by pipes and the water was driven by electric pumps
科塔巴托省馬里南村的供水系統,預計一個月完成,結果由於人民的全力合作,不到二個星期已近尾聲了,他們在河流的水源處做一個水塔儲蓄從巖壁流出來沒被污染的泉水,然後再到平地方便大眾提水的地方再做一個水塔,利用發電機以及大水管來和水源處的水塔連接,就這樣供水系統形成了。分享友人