驗收站 的英文怎麼說

中文拼音 [yànshōuzhàn]
驗收站 英文
receiving station
  • : 動詞1. (察看; 查考) examine; check; test 2. (產生預期的效果) prove effective; produce the expected result
  • : Ⅰ動詞1 (把攤開的或分散的事物聚集、合攏) put away; take in 2 (收取) collect 3 (收割) harvest...
  • : Ⅰ動詞1 (站立) stand; be on one s feet 2 (停下來; 停留) stop; halt; pause Ⅱ名詞1 (停車點) st...
  • 驗收 : check and accept; check before acceptance; check upon delivery; acceptance check; control reception
  1. The communicating professional engineer and the running personnel working in communicating stations approbates the system, and the system is certified by the administration of our bureau

    本系統得到局通信專工和各通信的認可,並通過了局生產部組織的
  2. The signal was picked up by a downrange radar station

    該信號被試飛行方向之內的雷達到了。
  3. This paper introduces the radiographic examination procedure of the primary pump of 900mw nuclear power unit, including the requirement about the radiographic examination equipment such as the radiation sources, films, penetrameter, etc. ; the radiographic process when using the rectilinear accelerator, and the development & examination of radiographic files, defects examination and acceptance criteria, with the expectation that this introduction be useful for reference to the promotion of 1000mw nuclear power primary pump localization in china

    摘要介紹了嶺澳核電主泵泵體製造過程中的射線探傷工藝過程,包括對膠片、象質計及底片的要求、直線加速器透照工藝、底片沖洗及黑度要求以及缺陷評定和標準,以期對我國今後百萬千瓦級主泵泵體的國產化有所裨益。
  4. Experimental studies were conducted at the yucheng comprehensive experimental station of the chinese academy of sciences during the period from march to june in 2003. respiration of a pulverous sandstone soil was studied under cultivation of winter wheat over a growth season. soil ch4 was measured by the static - chamber method combined with gas chromatography ( gc ) technique. the results indicated that the soil of winter wheat field in rapid growth season is a weak sink of ch4

    本文利用靜態箱氣相色譜( gc )分析的方法,在中國科學院禹城綜合試,對華北平原冬小麥生長旺季期間麥田土壤中ch _ 4氣體通量進行了測定,試起止時間為2003年3 6月,得出華北平原典型冬麥田土壤是大氣ch _ 4的弱吸匯。
  5. In accordance with the testing results and the analysis concerned, it is considered that the seismic wave method, borehole acoustic method and indoor rock mechanics test are feasible to evaluate the engineering quality of the foundation rock for the toe slab of the dam comprehensively, and the results can lay a reliable foundation for the accepting the foundation rock for the toe slab of the dam

    根據檢測結果與分析,認為採用地震波法、鉆孔聲波法以及室內巖石力學試綜合評價水電大壩趾板建基巖體工程質量是可行的,其成果可為大壩趾板建基巖體提供依據。
  6. Specifications for engineering acceptance of hydropower station capital construction

    水電基本建設工程規程
  7. All the products have been issued the ccc certificate, china fire suppression products quality certificate, safe certificate by china electric equipment guangzhou electric safe checking station, cta quality certificate, international ce certificate etc. all the products are manufactured strictly according to the international iec standard and the state gb standard

    公司在生產管理上不斷吸國內外先進經,產品已通過gb t19001 : 2000 - iso9001 : 2000標準質量體系認證中國國家強制性產品認證3c中國消防產品質量認證中國電氣設備檢測所廣州電氣安全檢測安全認證ce認證。
  8. Environmental samples, including airborne particulates, radio - iodine, total deposition and soil samples collected at mobile survey sites, fixed radiation monitoring stations and designated fire stations are analysed by the radiation laboratory at king s park for their radiation levels

    由流動巡測隊、各輻射監測及消防局集的環境樣本,包括大氣飄塵、氣態碘、總沉積物、土壤等會送往京士柏輻射實室進行輻射分析。實室內設有
  9. In the experiment, the two groups of detectors share the same gps receiver while the final crtp site require total isolation

    是次實只運用同一件全球定位系統接器的報時訊號,而真實的觀測將可獨立運作。
  10. A transparent model is used to make the deflection jet board grounded on the inhere enlarged dimensions. the finished experiments are conducted to catch the flow rate directions and the situation of cavitation using a high - speed video cameras. in this paper, the finite element analysis and visualiation research of servo valve prestage jet flow field are carried out, which establish the theoretical foundation for mathematical model of servo valve prestage and the whole mathematical model of hydraulic servo valve

    在對射流前置級驅動的伺服閥射流流場數值模擬的基礎上,用有機玻璃在偏導射流板原始尺寸的基礎上進行了擴大,製作了透明的偏導射流板,運用高速攝像機、液壓泵等組成了可視化實系統,對射流流場的流速方向、渦流、氣穴等現象進行了多方位的觀測,並通過對接管接壓力的測試,對流場分析結果進行了證。
  11. Rules for power plant steam turbine thermal acceptance tests

    汽輪機熱力性能規程
  12. Standard for constructional quality acceptance of railway station and yard engineering

    鐵路場工程施工質量標準
  13. In this paper, closely connecting with the actual application of automatization on power station and main engine remote control, and based on the experiences in automatization design together with the successively - built vessels of all kinds in our yard, summarized descriptions will go to the present status, performance and characteristics of automatization in machinery room, analysis and discussion will also be given to classified requirement by rules and regulation on system design of monitoring, alarm, remote control and automatic shift of main and auxiliary equipment, including test and inspection ; all of which, by summarizing the design skeleton and the design ideals on ship automatization, have made some guidance with ship automatization design in the future

    本論文結合電自動化系統和主機遙控系統應用實例,依據艦船自動化系統設計經以及我廠成功建造的各型艦船,就艦船機艙自動化現狀、功能和特性、現行規范對自動化船舶分級及入級設計要求、主要配置的監測、報警、輔機的遙控操作和自動切換以及自動化系統的試等進行了綜述;較好地總結了艦船自動化系統的設計規律,基本理順了艦船自動化系統設計思路,可以指導今後的艦船自動化造船設計工作。並以此為基礎,關注艦船電氣自動化的新技術及發展方向。
  14. In chapter 2, the decision - making process of the “ project of the heat - delivering system of yatai garden ( phase i ) ”, including studies on the spare blue print, selection of the final blue print and the decision - making results, was post - evaluated and analyzed. the limitation occurred during this process was pointed out and suggestions were provided by the authors for the future project management. the managements in the different period of project are interacted with each other, especially in the construction period

    本文作者詳細跟蹤調查了亞泰花園一期供熱項目的決策、實施、及運行流程,並利用對比分析的方法,客觀、公正地評價了亞泰花園一期供熱項目管理的全過程,總結了亞泰集團在該項目上的一些管理經,對未來亞泰集團項目管理水平的提高具有一定借鑒意義。
  15. Combined with the requirement to realize auto - management in constructional quality acceptance data in based on the latest unified standard for constructional quality acceptance of building engineering ( gb 50300 - 2001 ) and following the general principle to develop project management information system, the thesis studies and develops the constructional quality acceptance data management system, almost realizing the aim of managing the quality acceptance date with computer the maim contents and results of this paper are as follows : ( 1 ) to study and analyze the sequence

    本論文結合西安市建築質量安全監督建築工程文件資料管理計算機化的要求,對建築工程質量資料管理系統進行了全面的研究。本項目參照現有建設工程資料管理系統,依據最新的建築工程施工質量統一標準,遵循建設項目信息管理管理系統開發的一般原則,研究和開發了建築工程施工質量資料管理系統,基本上實現了對施工質量資料的計算機管理。
  16. The acceptance code for construction of small hydropower station

    小型水電建設工程規程
  17. Many gas - turbine & steam - turbine combined - cycle power plant ( ccpp ) have currently being constructed in china, and acceptance test of units in ccpp are one of important work in the engineering construction

    目前我國正在興建一批燃氣-蒸汽聯合循環電,機組性能工作是工程建設中的主要內容之一。
  18. On april 1 2001, our company s container station was approved by qingdao customs and formally opened for business. the municipal government of zibo city held a grand opening ceremony for port straightthrough

    2001年4月1日,經青島海關批準並合格,公司集裝箱場正式開通口岸直通貨運業務。
  19. For instance, on the establishment of a regional air quality monitoring network, the epd of hong kong and the environment monitoring authorities of guangdong province have conducted many exchanges, including site selection for monitoring stations, compilation of the operation manual, quality control manual and data management and user manual for the monitoring network and acceptance tests for monitoring stations

    舉例說,在共同建立一個區域空氣質素監測網路上,香港環保署與廣東省的環境監測部門,進行了大量的交流工作,包括監測的選址、制訂適用於該監測網路的操作手冊、質量控制手冊、數據管理及使用手冊及監測等。
  20. Based on the construction practices of china petroleum pipeline engineering in recent years and referred to the advanced experiences of relevant foreign codes and standards, this paper analyzes from the overall viewpoint of china petroleum pipeline industry the existing problems and shortcomings of pipeline construction standard system in aspects of design, construction, check and acceptance as well as project assessment, project management, project supervision, and discusses methods of stepping up establishment of unified enterprise standards for china pipeline construction sector

    摘要根據近幾年中國石油管道工程建設的實踐,借鑒國外有關標準規范的先進經在中國石油管道建設行業的整體高度,從設計、施工、以及項目評估、項目管理、項目監理等方面,分析了管道建設標準體系存在的問題和不足,探討了加快建立中國石油管道建設行業統一企業標準體系的方法。
分享友人