骨橋計 的英文怎麼說

中文拼音 [qiáo]
骨橋計 英文
pontimeter
  • : 骨名詞1 (骨頭) bone2 (物體內部的支架) framework; skeleton 3 (品質; 氣概) character; spirit ...
  • : 名詞1. (橋梁) bridge 2. (姓氏) a surname
  • : Ⅰ動詞1 (計算) count; compute; calculate; number 2 (設想; 打算) plan; plot Ⅱ名詞1 (測量或計算...
  1. The results were as follows : 1 case of acoustic neuroma, 1 case of cerebello - pontine lymphoma, 1 case of meningioma of the cerebello - pontine angle, 2 cases of stroke in the pons, and 1 case of dolichoectasia of the verterbro - basilar artery

    結果有:聽神經瘤1例、小腦及腦淋巴瘤1例、小腦腦角腦膜瘤1例、腦中風2例、及椎基底動脈血管瘤1例。
  2. The author redesigned the common concrete beams and carried out a comparative analysis to the existing beams according to the specification for design of reinforced concrete and prestressed concrete highway bridges and culverts ( jtj023 - 85 ), the specification for design of reinforced concrete and prestressed concrete highway bridges and culverts ( informal version for advices ) and relevant rules of its matching stipulations, light aggregate concrete bridge technology stipulations ( ( informal version for advices ) and on the basis of prestressed concrete theory. the thesis emphasized on the research of the variation of the concrete, prestressing tendon quantities, their spans, beams " height and their rigidity of both the designed beams and the existing beams, and obtained the quantitative results from above research

    採用hslc置換梁體中的普通混凝土,並運用預應力混凝土理論,依據《公路鋼筋混凝土及預應力混凝土涵設規范》 ( jtj023 - 85 ) , 《公路鋼筋混凝土及預應力混凝土涵設規范》 (徵求意見稿)和與之配套編制的《輕料混凝土梁技術規程》 (徵求意見稿)的有關規定,對上述普通混凝土梁進行了重新設並與既有梁進行了對比分析,得出了設梁與既有梁在混凝土及預應力筋用量、跨度、梁高以及剛度等方面的變化情況,得到了定量結果。
  3. Fabrication of the box beam is divided into such parts as reinforcement, formwork, concreting, prestressing, moving and storing of beam, pipe grouting under pressure, end sealing of the beam, water - proof layer on the bridge surface system, protective coating etc. the paper makes description of effective box beam construction technology and workmanship which can be adopted in other projects, such technologies as : manufacturing and fixing of reinforcement, steel reinforcement fixing baseplate, web plate and top plate respectively and lifting the steel skeleton into form, requirements of design and manufacturing and way of utilization for dismantling - erection type formwork and hydraulic formwork, optimization of concrete ratio, concrete pouring process of two ends of beam in priority over the middle, in sequence of first baseplate followed by web plate and top plate at last, concrete pouring in inclined section and in horizontal layer, concrete vibration mainly by external vibrator in assistance with internal vibrator, methods and regulation for steam curing of concrete, dual controls over stress and strain to ensure quality of prestressing workmanship, construction method of effective beam moving by heavy - weight special moving facility, some regulations and key notes about construction of grouting under pressure, beam ends sealing, water - proof layer on the bridge surface system, protective coating

    箱梁製造由鋼筋工程、模板工程、混凝土工程、預應力工程、移存梁工程、孔道壓漿工程、梁體封端工程、面防水層和保護層工程等施工環節組成。文中介紹的採用胎具製作和綁扎鋼筋,分底腹板和頂板分別綁扎並吊裝鋼筋架入模;拆裝式和液壓式兩種模板的設、製作要求和使用方法;綜合考慮、優化混凝土配合比,混凝土灌注從兩端至中間、先底板、后腹板、再頂板的施工順序和斜向分段、腹板水平分層、附著式振搗為主、插入式搗固為輔的施工工藝,蒸汽養護的方法和規定;應力應變雙控制確保預應力施工質量的施工技術;採用重物移運器有效移梁的施工方法;壓漿、封端、面防水層和保護層施工的一些規定和注意事項等都是對箱梁製造行之有效的施工技術和施工方法,並可為以後類似施工作借鑒。
  4. Considering the past research results, frost resistance of concrete using portland cement, and the designed service life of 100 years of testing bridge, the control indexes of high durability concrete are defined in this paper. mixture proportion of concrete used in pier column, coping, precast box beam and plate of bridge is designed based on the compact pile theory, and construction technique is studied also

    結合課題組以往的研究成果,根據試驗使用壽命100年的要求,確定出高耐久性混凝土的設控制指標,基於最緊密堆積原理和最佳漿比原理對梁的墩柱、蓋梁、預制箱梁和面板用高耐久性混凝土的配合比進行設,並對其施工應用技術進行了研究。
  5. Concrete pylons are adopted for the fengdu yangtze suspension bridge, and normal construction methods for the pylons include slide formworks, turning shutters and climbing formworks. climbing formworks with assembled steel - pipe scaffolding is a newly - developed technique for this bridge. it causes saving of the steel skeleton for construction of the pylons. by utilizing regular simple rods and parts, construction progress is fast and the quality is good

    豐都長江大懸索採用混凝土塔,其常規的施工方法有滑模、翻模和爬模等幾種,本施工中採用了新開發的鋼管爬升架倒模新工藝,不僅節省了為塔施工而設塔型鋼架,而且利用常規的簡易桿件、施工速度快,施工質量好。
  6. With the retrospection of the developing course of the bored pile foundation and combining with my practical experience, the paper expatiates upon the design principle of percent of fit of the stone - fill grouted concrete and the main factors of the influence strength target, and the final pile technique introduction of the hollow pile of the stone - fill grouted concrete and the precast prestressed concrete ; baesd on the theory of slurry hydraulics, empirical calculation formulas of the radis and height of diffuse slurry are deduced in this paper ; it analyzes the test pile materials of the hollow pile foundation, such as luoyang yi river bridge and dangwang jian river bridge ; the new technique of the hollow pile, which provides the generalization and application with base materials, expounds its feasibilities, adaptabilities and economy

    本文通過綜合分析國內外鉆孔樁基礎的發展歷程及研究現狀,重點討論了填石壓漿混凝土空心樁、預制預應力混凝土空心樁的成樁工藝、填石壓漿混凝土的配合比設原理及影響強度指標的主要因素;根據泥漿水力學原理,導得了考慮各種因素的水泥漿液在預填料中的流動影響半徑和上升高度;結合河南省洛陽伊河大、黨灣澗河大工程實踐,討論了填石壓漿混凝土空心樁基礎的質量檢測方法及標準;並在此基礎上,深入分析了樁側、樁端承載能力,提出了填石壓漿混凝土空心樁的設算理論和方法。最後,論證了空心樁新工藝的可行性、適應性、經濟性,為大力推廣應用空心樁新技術提供了可靠的技術資料。
  7. Runyang changjiang highway bridge is a main bridge of across changjiang in jiangshu province, with six lances for 100km per hour designing vehicle speed. it ' s deep - large rivet foundation at the north embankment, in shiye, zhenjiang. is a important part of the suspension bridge

    潤揚長江公路大是江蘇省「四縱四橫四聯」的公路主架和跨長江通道的重要組成部分;是一座設車速為100km h的六車道高速公路特大
  8. With checking and optimization, some rational suggestions on bridge location, shape and overall arrangement is put forward. after construction checking, the author also puts forward some requests for construction pre - cove and safety pier setting, at the same time gives optimum design on joint balance pier. construction structure checking indicated that not only the strength and stability coefficient of rotation stiffness framework is affluent, but also the section size

    通過驗算及優化,對該推薦方案的址、武漢理工大學碩士學位論文型及梁總體布置提出了合理化的建議;通過施工驗算,對施工預拱度及保險墩的設置提出了要求,對交界平衡墩進行了優化設;施工結構驗算表明,轉體勁性架強度、穩定性富餘系數較大,截面幾何尺寸過大,結構設過于安全保守,並提出了結構優化的方法,從而大大節省了工程投資,加快了工程進度,增強了梁的美觀。
  9. Structure, as bones to a body, is a key in the design

    結構? ?就象架之於人體? ?在裝卸的設中起著關鍵的作用。
  10. After introducing key technologies of top - down assembly modeling of mechanical products based on parametric technology, a new method for assembly modeling is put forward by taking skeleton model as bridge in top - down assembly modeling design, and a practical scheme of assembly modeling for complex products ancler concurrent design is given

    摘要介紹了基於參數化技術的自頂向下機械產品裝配建模中的關鍵技術,提出通過構建裝配體架模型,以架模型作為實現產品自頂向下設信息溝通的梁,實現裝配體建模設,為復雜產品的并行設提供了一切實可行的建模方案。
  11. By calculating suspender tension of a half - through rigid skeleton cfst arch bridge, the task set up complete health file of this

    對某中承式鋼管混凝土勁性架拱進行了吊索(桿)張力算,建立了該之初的完備的健康檔案。
  12. In the end, the steel - reinforced concrete arched bridge ( chun ' an weiping bridge ), which span is 198m, is analyzed by the proposed three - dimensional nonlinear finite element method and also those gained conclusions are directly adopted in the computation. the universal stability coefficient and nonlinear buckling stability coefficient of the bridge are respectively computed, in which the dead load and the live load are assembled according to the criterion. on the other side, the regularities of creep deformation and subsidiary stress of the investigated bridge under the first - stage dead load are carefully researched

    最後,將本文所提出的三維非線性分析方法及其主要研究成果直接應用於198m跨勁型架式鋼管混凝土拱「淳安威坪大」的分析算中,對該在最不利恆載和活載組合下的一般特徵值失穩系數和非線性屈曲系數進行了對比研究,並對一期恆載長期作用下該的徐變變形、附加應力以及截面應力、應變重分佈規律分別進行了深入研究。
分享友人