高堰 的英文怎麼說

中文拼音 [gāoyàn]
高堰 英文
gaoyan
  • : Ⅰ形容詞1 (從下向上距離大; 離地面遠) tall; high 2 (在一般標準或平均程度之上; 等級在上的) above...
  • : 名詞(較低的擋水建築物) weir
  1. China textile limited project located in china ' s jiangsu " breadbasket " - - the jiangyan city. current domestic production of various kinds of acrobatic yarn - dyed fabric after dyed fabrics and professional manufacturers

    中毅紡織有限公司坐落在中國江蘇有「魚米之鄉」之稱的姜市境內,是目前國內生產各類色織布和難度色織布的專業廠家。
  2. The government took the advantage of the rich water resources and favorable terrain of guangxi to renovate the lingqu cannel, xiangsidi, ponds and barrages, thus bringing water conservancy construction of guangxi to a climax

    明清政府充分利用廣西豐富的水資源和有利的地形,對靈渠、相思棣、陂塘、壩等進行多方面的修整,使廣西的水利建設達到一個峰期。
  3. ( 4 ) enhancing the downriver cofferdam will make the lower reaches of a river dissipate more energy. however, it will increase erosion and the protection will be more difficult

    下游圍可以使下游分擔更多的消能任務,減輕壩區的沖刷和消力池的消能負擔。
  4. There exist problems of driving training in shiyan, such as inferiority in training, non - qualified training teachers, non - scientific mangement system, outnumbered training schools and non - strick regulations

    摘要十市的駕培行業存在較多問題,主要有駕校培訓質量差、教練員素質不、管理上體制不順、駕校總童失控、開業把關不嚴等。
  5. And experimental study on the heat transfer performance and pressure drop characteristic of the process of bubbling evaporative cooling are carried. as there are so little attention and studies on the process bubbling evaporative cooling about heat transfer in the world at present, this paper mainly deals with the effects of the different bare tower velocity, weir height, heat flux density and plate perforation geometries on the heat transfer coefficient and the pressure drop of the process of air flowing

    由於目前國內外對鼓泡蒸發冷卻過程在換熱方面的關注和研究較少,本文對不同空塔速度、不同、不同熱流密度、多孔板的不同幾何尺寸對換熱系數及空氣流動過程阻力的影響進行了實驗研究及理論分析,總結了本實驗條件下換熱及阻力的實驗關聯式。
  6. The power station is situated in the area of 8 earthquake fortified zone, the fourth sand layer are probably liquefied and the second sand layer are not liquefied in the situation of 7, 8 earthquake. however the security index of anti - liquefying of second sand is not very high in the situation of 8 earthquake

    地基中間隔存在第和第層兩層淺灰黃色砂層,均系塞湖相沉積物,電站處於8地震設防區,在7 、 8地震情況下第層砂層均有液化的可能;第層砂層均不液化,但在8地震情況下砂土抗液化的安全系數不
  7. Established 20 years ago, the chu - lung resort was wulai s first dedicated hot springs hotel. the men s pool faces an uninhabited hillside and the yenti reservoir, while the women s pool is located on the side of the ravine. it features hot, medium and cold baths, with water massage sections and baths scented with tea, lemon and other fragrances

    半露天的男性養生池,面對一片無人的山林,還有堤水庫澎湃雄壯的瀑布水流而半露天的仕女池則在南勢溪洪荒峽邊,擁有冷中溫三種不同溫度的溫泉池,還有具按摩放鬆作用的水流區氣泡區,和茶浴檸檬浴等不同味道湯池。
  8. It is widely applied to the stove top, shove head, stove door and burmer brick, the binding of cooling - tube and groove bottom of the molten steel mouth of the heat stove, meantime empopyed in the field of the step stove bottom, the fir - proof wall of the circular stove, the cover, the protruding tape and sand sealing mouth of the equal - heating stove, the triangle, the spray gun and meltingiron groove of electric stove and also including fire - resistant material used in the refine stove and the stove door

    加熱爐的爐頂、爐頭、爐門、燒嘴磚、水冷管包紮、出鋼槽槽底、步進爐爐底、環形爐檔火墻、均熱爐的爐蓋、凸出帶、砂封口、中間包包蓋、電爐三角區、鐵水包襯里、爐外精煉用噴槍,底吹氧煙道、鐵水溝蓋、檔渣爐中各種耐用火料襯里煉焦爐爐門等。
  9. Nurses are spoken highly by the people in the fight against sars

    市77 :在抗擊「非典」的戰斗中,白衣天使受到人民的度贊揚。
  10. It founds natural heightening theory for warping dams and puts forward specific way of diversion, measures for preventing dam eroded and design for energy dissipation and flood storage of cofferdams and sedimentation and dewatering through exploration and study on deposition in front of natural formed dam and the techniques of building dam through hydraulic filling

    通過對天然聚湫壩體前的淤積和「水力沖填」築壩技術的探索和研究,創立了淤地壩壩體自然加的理論,並提出了具體的導流方式、壩體防沖措施及圍消能蓄洪、留淤脫水設計。
  11. Combining theory with practice, in this thesis, i analyses the content of the construction of steel round the barrage. such as, the structure of steel round the barrage, the arrangement of mooring, the calculation of mooring chain, the manufacture and assembling of steel round the barrage, the moving up connection and sinking of it, confining the bottom of underwater concrete

    本文結合實際工程,詳細分析了鋼圍的構造、錨錠系統的布設、錨纜的計算、鋼圍的製作及組拼、鋼圍的接與下沉、水下混凝土封底等圍施工的重要內容;並對常用的鋼套箱施工技術進行了討論。
  12. Design and practice of blasting demolition of longitudinal rcc cofferdam at gaobazhou power station

    壩洲電站碾壓混凝土縱向圍拆除爆破設計與實踐
  13. So the labyrinth weir is particularly suited for use where the discharge structure need to enlarge the ability of outflow but the width is restricted the labyrinth weir could be divided into straight - labyrinth weir and curve - labyrinth weir in this paper

    因此,迷宮特別適用於泄水寬度受限,但又需提泄流能力的泄水建築物中。本文將迷宮分為直線型迷宮和曲線型迷宮
  14. Synthetic mullite slag dam, high - alumina salg dam and mg - alcastable for continuous cadting tundish developed by this factory has good heat stsbility, strong erosion resistance. it is produced by adopting high aluminium and super fine powder little cement casting workmanship, which has such advantages as advanced craft, stable quality and distinguished function

    連鑄中間包用莫來石擋渣板,鋁質擋渣板,鋁鎂澆注料第我廠開發的適用於連鑄中間包用,具有熱穩定性好、抗耐蝕能力強等特點,它採用鋁,超細粉低水泥澆注工藝技術生產,具有工藝先進,質量穩定,性能優良的特點。
  15. The effect of gas rates, liquid flow - rates, downcomer width, weir height and the addition of surface active agent on the liquid mean residence time, t, effective diffusion coefficient, de, and froth height, hf were studied. results obtained showed that for two systems, the t in the downcomer of ctst plate is 20 - 50 % smaller than that of fl valve plate, and the de is 40 - 70 % smaller than that of fl valve plate

    通過對氣速、液體流量、降液管寬度、和表面活性劑加入的影響進行分析得出下面結論:在相同的操作條件下,對于兩種物系, ctst塔板降液管的液體停留時間比f1浮閥塔板的約小20 50 ,有效擴散系數比f1浮閥塔板的小40 70 ,泡沫度低110 150mm 。
  16. Abstract : a brief introduction to scientific research in the three gorges project ( tgp ) and the applications of research achievements is given, which include treatment of newly slited layer on the foundation of the first stage earth - rock cofferdam, dumping bottom technique of river closure in deep water, construction of cut - off walls in the second stage earth - rock cofferdams, 3 - d computer simulation of river closure, concrete casting alternatives and selection of major construction equipment for the second stage construction optimization of durability of raw materials of concrete, deep sliding resistance and stability of the intake dam section, the section of the intake of the power station, the intake penstock of the power station, layout and hydraulics problems of shiplocks, stability of high slopes of shiplocks, and optimization of the system structural anchor bars to reduce the risk of cracking in the concrete wall and 700mw turbine generator units

    文摘:介紹三峽工程的科研項目,綜述三峽工程開工以來的主要科研成果及工程應用情況,包括:一期土石圍基礎處理與施工技術;大江截流上下游土石圍平拋墊底研究;二期圍防滲工程研究;大江截流計算機科學管理;大壩混凝土澆築方案及主要施工機械選型;混凝土的原材料和耐久性優化試驗研究;大壩基礎深層抗滑穩定研究;三峽電站進水口型式研究;鋼襯鋼筋混凝土引水管道研究;蝸殼打壓、廠壩間伸縮節問題研究;永久船閘的引航道布置、輸水系統及水力學、邊坡穩定、混凝土襯砌墻的結構與支護研究;特大型水輪發電機組的科學研究。
  17. A brief introduction to scientific research in the three gorges project ( tgp ) and the applications of research achievements is given, which include treatment of newly slited layer on the foundation of the first stage earth - rock cofferdam, dumping bottom technique of river closure in deep water, construction of cut - off walls in the second stage earth - rock cofferdams, 3 - d computer simulation of river closure, concrete casting alternatives and selection of major construction equipment for the second stage construction optimization of durability of raw materials of concrete, deep sliding resistance and stability of the intake dam section, the section of the intake of the power station, the intake penstock of the power station, layout and hydraulics problems of shiplocks, stability of high slopes of shiplocks, and optimization of the system structural anchor bars to reduce the risk of cracking in the concrete wall and 700mw turbine generator units

    介紹三峽工程的科研項目,綜述三峽工程開工以來的主要科研成果及工程應用情況,包括:一期土石圍基礎處理與施工技術;大江截流上下游土石圍平拋墊底研究;二期圍防滲工程研究;大江截流計算機科學管理;大壩混凝土澆築方案及主要施工機械選型;混凝土的原材料和耐久性優化試驗研究;大壩基礎深層抗滑穩定研究;三峽電站進水口型式研究;鋼襯鋼筋混凝土引水管道研究;蝸殼打壓、廠壩間伸縮節問題研究;永久船閘的引航道布置、輸水系統及水力學、邊坡穩定、混凝土襯砌墻的結構與支護研究;特大型水輪發電機組的科學研究。
  18. The construction technology of the thin - wall caisson used in drilled pile foundation

    壓旋噴樁配合雙壁鋼圍在深水承臺施工中的應用
  19. Supervision and consultation projects completed : ( 1 ) jiangsu xindadou square ( 50, 000m2, two 30 - story buildings ), worked as chief supervision engineer ( consultation ) ; ( 2 ) " yanqiao overpass service center of xicheng highway ( the first overpass type service center on highway in china ), worked as chief supervision engineer ( consultation ) ; ( 3 ) the ninth 5 - year - plan updating technology project of huaiyin tobacco plant, 50, 000m2, worked as chief ( supervision and consultation ) ; ( 4 ) the softy testing, analysis and consultations of nanjing international conference and exhibition center, site - erected structure, 75m span steel roof truss ( the largest one in china ), worked as chief of test and consultation ; ( 5 ) " the consultation service of the testing, analysis and update technology of the reliability of the joints of intermediate floor slabs, beams and columns of base beam of sanshanjie station of nanjing metro " etc

    完成"江蘇新大都廣場( 5萬多平方米,二幢30層) "建設監理咨詢(總監) ; "錫澄橋跨線服務區(國內首座) "建設監理咨詢(總負責) ; "淮陰卷煙廠9 . 5技改項目( 5萬多平方米) "建築監理咨詢(總負責) ;主持了"南京國際會展中心75m跨鋼屋架(國內最大距)現場施工安裝結構安全性測試分析咨詢" ; "南京地鐵三山街站中樓板及底板樑柱節點構造技術安全可靠性的測試分析與技術改進咨詢服務"等項目。
  20. Hydraulics research on flood - releasing during construction period of heightened scheme of dangjiangkou dam

    丹江口大壩加高堰頂溢流段施工渡汛試驗研究
分享友人