高壓熱水系統 的英文怎麼說

中文拼音 [gāoshuǐtǒng]
高壓熱水系統 英文
high-pressure liquid system
  • : Ⅰ形容詞1 (從下向上距離大; 離地面遠) tall; high 2 (在一般標準或平均程度之上; 等級在上的) above...
  • : 壓構詞成分。
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : 系動詞(打結; 扣) tie; fasten; do up; button up
  • : Ⅰ名詞1 (事物間連續的關系) interconnected system 2 (衣服等的筒狀部分) any tube shaped part of ...
  • 高壓 : 1 (殘酷迫害; 極度壓制) high handed 2 [氣象學] (高氣壓) high pressure3 (高電壓) high tension...
  • 熱水 : hot water熱水袋 hot water bog; hot water bottle; 熱水供[采]暖 [機械工程] hot water heating; hydra...
  • 系統 : 1. (按一定關系組成的同類事物) system 2. (有條理的;有系統的) systematic
  1. The system follows carnot cycle principle. driven by electricity, its working substance absorbs the latent heat in the air or other low - temperature heat source, and waste heat let out of living or industry, compresses it to heat by compressor, exchange, exchange heat with water to higher the water temperature ( 55 warm ). it a new water heating apparatus, used in home heating, and influenced by environment runoff and the heat exchang of working substance. this system is more used in southem china

    根據逆卡諾循環原理,採用電能驅動,通過工質吸收空氣中或其他低溫源中無法被利用的太陽能潛、生活及工業排放的廢,通過縮機縮升溫,再與,使溫升,獲得( 55 ),是一種新型的製造設備,應用於家庭和,受到環境溫差和工質換的影響,器/更多適合南方地區應用。
  2. Test results indicated : with the hoist of altitude, the increase of ice amount and the rise of pollutant, the average flashover voltage reduced. the character exponent generally depends on the insulator profile, ice amount, ice state and pollution severity etc. by means of a high - speed camera, a data acquisition system and high voltage test facilities, a series of the flashover processes on ice surfaces were record. the experimental results form this study and the subsequent theoretical analyses suggested : the thermal ionization of the air in front of an arc root resulted in arc movement ; the electrostatic force had an auxiliary effect of impelling arc propagation ; the electrical

    通過對攝像機、數據採集試驗裝置記錄覆冰絕緣子表面閃絡電弧的發展過程的試驗結果進行理論分析得出:弧根周圍空氣的電離導致了電弧的發展,靜電場力對電弧的發展起到了加速作用,電擊穿僅發生在閃絡最終的跳躍階段;通過測量閃絡過程中的放電電、泄漏電流、閃絡時間、覆冰電導率、電弧長度及電弧半徑等參數,得到了不同階段電弧(電弧起弧階段、電弧發展階段及完全閃絡)的發展速度、臨界電弧長度均隨覆冰電導率的增加而減小。
  3. In an indirect system, the collector loop is separated from the high - pressure city water supply by a heat exchanger

    在非直接中,收集器的循環與由交換器提供的城市分隔開。
  4. For the purpose of solving the interconnection of the heating supply between the small high - rising building and multi - storied building, this paper advances that the pressure fixing system on the by - pass pipe should be used in the secondary network system, and probes into the pressure regulating range of the water replenishing and pressure fixing system on the by - pass pipe

    為了解決小層和多層建築的供並網問題,提出了將旁通管定應用於二次網中,並對旁通管補調幅度進行了探討。
  5. The system of vpi equipment mainly includes vacuum chamber, heating unit, worktable with its drive unit, vacuum pumping unit, gas - charge unit and control unit, etc. this equipment would meet the need of al or cu matrix composites prepared by pressureless infiltration or vacuum infiltration in a high vacuum or special atmosphere

    該設備主要出密封罐、加、升降工作臺、真空、充氣、控制及密封罐等組成。可以實現常見金屬基復合材料在較真空或特定氣氛下的無浸滲或真空浸滲制備工藝,並可實現試樣的不同冷卻方式凝固。
  6. ( 5 ) the water circulation system reach a stable state after a year when the exploitation of hdr. namely, there a fixed stress gradient from injection well to production well keeping the normal function, and the stress gradient is higher nearby the injection well, reaching to 43. ompa / km, but the stress gradient is only 10

    ( 5 )溫巖體地開發的循環在一年後變的穩定,即從注入井到生產井有固定的力梯度維持的運行,而且在注入井附近區域的力梯度較』大,達到43 . ompa / km ,中間區域的力梯度僅為10 . 7mpa / km 。
  7. After researching the part thermal equipments and systems include heaters, steam leakage and receiving systems, low pressure drain system etc, and computing the efficiency of the systems, find out the better choice of the imported assemblies than the domestic assemblies in parameter and the disfigurements in design and making. based on the above, point out the measure to progress them. according to the analysis, we can get some measures to increase the economical level of the systems and save more energy

    對局部力設備及進行分析研究,包括:加器設備、漏汽及回收、低加疏、主、再蒸汽以及凝汽器等部位;並計算汽輪機本體、中、低缸效率,藉此著重對汽輪機通流部分進行了剖析,找出國外進口機組動、靜葉柵、葉型的選擇比國產機組先進性以及國產機組在通流部分設計和製造中的諸多缺陷,並且指出了改進的方向,為機組提經濟性、節能降耗奠定了理論基礎。
  8. The result of the study shows that the electro - hydraulic proportional technology is useful for all - hydraulic operated drilling machine to simplify the operations and composition of system, to improve the level of automatization and efficiency and to reduce the consumption of energy. the result of the study also shows that the system of feeding has the properties as followed : fast respone, stable pressure - adjusted characteristic, distinct effect of energy - saving, some improvement of system efficiency

    研究結果表明:全液鉆機中應用電液比例技術,可以簡化組成和操作,提鉆機自動化平,提效率,降低發和溫升;採用恆變量泵的給進加電液比例控制調性能穩定、響應快、節能效果明顯。
  9. The main relative systems of heavy - hard rainfall in northeast plateau are western pacific subtropical high, south asia high, low latitude systems, upper level jet ( ulj ), low level greater wind speed axes, westerly trough and plateau trough, low level vortex, cold frontal, occluded front in qinghai lake, mesoscale low pressure, heat low - pressure in qinghai, shear line and convergence line, mesoscale cloud cluster, etc. the west subsidiary model of south asia high is the main circulation type of heavy - hard rainfall in this area

    3 、西太平洋副、南亞、低緯空急流、低空大風速軸;西風槽和原槽、低渦、冷鋒、青海湖錮囚鋒以及中尺度低、青海、切變線與輻合線、中尺度雲團等原東北部地區大到暴雨的主要相關。 100hpa上的南亞中心強度加強,位置東西擺動預示原地區將有降產生,中心強度減弱,降過程結束。南亞西部副型是原東北部地區大到暴雨的主要流型。
  10. The ncep / ncar reanalysis data, china 740 stations precipitation data, and the tbb data from meteorological institute research of japan are employed to study the structure and variation law of subtropical high ( sh ) in the period of double ridges. by combining together case diagnosis and statistic analysis, some new findings of the sh double ridges are obtained

    本文以副結構和活動規律為線索,圍繞副雙脊線這一新主題,利用ncep / ncar再分析資料、中國臺站降資料以及日本氣象廳提供的tbb資料,通過個例分析和計分析,發現了若干新事實,揭示了與副雙脊線有關的一列特徵和規律。
  11. Thermal stress control system actually gather the real - time data of unit sets , compute temperature fields , stress fields and maximum dangerous stress by the math modal , decide target and speedup rotation in every stage of startup process , and justify automatically to realize auto control a serial of processes of turbine , such as speedup , warm - up , connecting net , load changing , stop and unsteady condition etc , and improve automatic level of the unit sets. turbine auto startup ( tas ) system can automatically evaluate steam turbine ' s startup and load changing process according to thermal stress of

    應力控制實際是對機組運行參數進行實時採集與監控,通過數學模型實時地計算、中缸轉子的溫度場、應力場分佈,以及最危險應力,以確定啟動過程各階段的目標轉數及升速率,並進行自動調整,實現機組沖轉、升速、暖機、並網、升負荷、停機以及異常工況下的自動控制,大大提了機組的自動化平。
  12. Abstract : the causes for low efficiency of the heater in no. 2 crude unit of jpc refinery are described and analyzed including water leaking of steam soot blower, dew point corrosion caused by steam, soot deposits in convection chamber owning to poor soot blowing, high flue gas temperature, no heat recovery of flue gas, and poor performance of insulation lining, etc. by using sonic soot removing system, flue gas recovery system, spray coating of fiber and rock wool, as well as adjustment of flow scheme accordingly in the technical revamping. the dew point corrosion is completely eliminated, the insulation performance is improved, the heat loss is reduced by 1. 25 %, the flue gas temperature is reduced to about 170, and the heater efficiency is increased from 83 % to more than 90 %

    文摘:分析了金陵石油化工公司煉油廠二套常減裝置加爐存在的因蒸汽吹灰器漏,蒸汽引起露點腐蝕及吹灰效果差造成對流室積灰,排煙溫度,煙氣量未回收利用以及爐子保溫襯里效果差等問題,提出採用聲波除灰、煙氣回收、纖維噴塗和巖棉噴塗及相應的流程調整等改造措施.測定結果表明,本次技術改造解決了因蒸汽吹灰器漏所造成的露點腐蝕問題,提了保溫效果,減少散損失1 . 25 % ,排煙溫度降至170左右,裝置的爐效率由83 %左右提到90 %以上
  13. The causes for low efficiency of the heater in no. 2 crude unit of jpc refinery are described and analyzed including water leaking of steam soot blower, dew point corrosion caused by steam, soot deposits in convection chamber owning to poor soot blowing, high flue gas temperature, no heat recovery of flue gas, and poor performance of insulation lining, etc. by using sonic soot removing system, flue gas recovery system, spray coating of fiber and rock wool, as well as adjustment of flow scheme accordingly in the technical revamping. the dew point corrosion is completely eliminated, the insulation performance is improved, the heat loss is reduced by 1. 25 %, the flue gas temperature is reduced to about 170, and the heater efficiency is increased from 83 % to more than 90 %

    分析了金陵石油化工公司煉油廠二套常減裝置加爐存在的因蒸汽吹灰器漏,蒸汽引起露點腐蝕及吹灰效果差造成對流室積灰,排煙溫度,煙氣量未回收利用以及爐子保溫襯里效果差等問題,提出採用聲波除灰、煙氣回收、纖維噴塗和巖棉噴塗及相應的流程調整等改造措施.測定結果表明,本次技術改造解決了因蒸汽吹灰器漏所造成的露點腐蝕問題,提了保溫效果,減少散損失1 . 25 % ,排煙溫度降至170左右,裝置的爐效率由83 %左右提到90 %以上
  14. For example, the condenser algorithm considered the trouble condition such as the leak of tube, fail of seal in vacuum system, the lower shaft sea - ting steam pressure, pollute of tube, the high water level of hot - well. the heater algorithm considered the trouble condition such as the leak, pollute of feed - water pipe and high water level of heater

    如凝汽器演算法考慮了銅管泄漏、真空密封不嚴、軸封蒸汽力低、銅管結垢污染、位過等故障項目,加器演算法考慮了給管道泄漏、給管道污染、結垢、加位過等故障項目。
  15. Electrically heated hot water high - pressure cleaner with k ? rcher power nozzle. triple - chamber boiler system. continuous running - resistant long - life pump with three stainless steel pistons. facility for integrated storage of spray lance

    電加冷、清洗機。三箱鍋爐加,非常友好的操做界面,底盤集成油箱,管及附件存儲槽。
  16. Based on the research achievement of the key technologies, aiming at the electromechanical equipment systems in practical project, such as elevator system, high voltage power supply system, refrigerating system, wind - cooling refrigerating system,

    論文最後基於上述關鍵技術的研究成果,針對實際工程中的機電設備,如電梯配電、冷機組、風冷等,開發完成了一套樓宇機電設備集成監控
  17. The purpose of this thesis is to set up distributed control system of hot - pressing product line of mdf, in order to improve the level of control and management the hot - pressing production

    本論文的目的便是為了建立中密度纖維板智能化生產線集散控制,以便提中密度纖維板生產的控制和管理平。
  18. Sea - ice of hudson bay in key time interval has negative relationship with index of asian summer monsoon, positive relationship with the western subtropical ridge in west pacific in august, and negative relationship with the intensity of the west pacific subtropical in august

    同時該海區海冰與亞洲季風呈負相關,與西太平洋副的強度也呈負相關,而與副西伸脊點呈正相關。這說明哈得孫灣海冰是通過這兩個來影響華北夏季降的。
  19. Measurements were made of system pressure, mass flow rate of steam, air, and cooling water, temperatures of condensing flow and cooling flow, and the water level of boiler. the major phenomena observed in the present experiment are similar to those by other investigators. the mass flow rate of steam, the system pressure and air content are the most important factors affecting steam condensation

    實驗結果表明,維持二次側冷卻流量不變,無論對于純凈蒸汽還是含有空氣的蒸汽冷凝,隨著蒸汽發生器加功率的增大(即蒸汽流量增大) ,有效冷凝段長度將加長;當蒸汽中含有少量空氣,有效冷凝段長度也會明顯加長;提力,有效冷凝段長度將縮短。
  20. This paper researches the distribute monitor and diagnose system ( dmds ) bases on the high - pressure spray descaling system in hot strip rolling factory. it aim to make the technology of status monitor and faults diagnosis adapt to the modern machinery ' s development trend of large scale, scattering and group at the same time realize scattering monitor and centralize diagnosis

    為使狀態監測與故障診斷技術適應機械設備大型化、分散化、成組化的發展,實現分散監測、集中診斷管理目的,以某大型鋼鐵(集團)公司軋板廠除鱗為具體對象,進行了分散式監測診斷dmds的研究。
分享友人