高壓配電 的英文怎麼說

中文拼音 [gāopèidiàn]
高壓配電 英文
high voltage distribution
  • : Ⅰ形容詞1 (從下向上距離大; 離地面遠) tall; high 2 (在一般標準或平均程度之上; 等級在上的) above...
  • : 壓構詞成分。
  • : Ⅰ動詞1 (兩性結合) join in marriage 2 (使動物交配) mate (animals) 3 (按適當的標準或比例加以...
  • : Ⅰ名詞1 (有電荷存在和電荷變化的現象) electricity 2 (電報) telegram; cable Ⅱ動詞1 (觸電) give...
  • 高壓 : 1 (殘酷迫害; 極度壓制) high handed 2 [氣象學] (高氣壓) high pressure3 (高電壓) high tension...
  • 配電 : distributing; power distribution配電板 distribution panel; distributing board; power board; switc...
  1. On this basic, it come out rs485, bitbus application casus to distribution watch system. this system make up real time watch system and data manage net system by bitbus communication to complete detract check and focus show function of high low electric power parameter. it take on task of background communication and proscenium data manage

    該方案應用bitbus現場總線構成一個完整的實時監控和數據管理網路系統,完成、低力參數的分散檢測和集中顯示等功能,上位機同時承擔后臺通訊和前臺數據管理任務,前後臺并行工作,該方案在某汽車製造廠系統中得到了較好的應用。
  2. Technology co., ltd. is located in baoan district of shenzhen, specializing in selling name - branded equipments for low - voltage distribution equipments and industry automation products on a commission basis. simultaneously, it is also a high - tech enterprise including r d commodity trade and technical service

    深圳市深祥科技有限公司位於深圳市寶安區,專業代理經銷世界名牌低設備及工業自動化產品,同時也是為自動化應用提供全方位解決方案,是一家集科研開發商品貿易技術服務於一體的科技企業。
  3. Be familiar with hv, mv and lv power distribution systems and power factor correction study & harmonic analysis, ups and dc power systems, power fiscal metering, and all necessary calculations to one project including short circuit calculation and protective device coordination study, lightning protection calculation, generator power calculation etc

    熟悉項目中的、中、低系統和功率因素補償研究及諧波分析, ups和直流氣系統,功率計量,相關計算(包括短路計算和保護裝置協調分析,照明保護計算,發機功率計算等) 。
  4. Choice of grounding method of neutral point in high voltage distributing net

    高壓配電網中性點接地方式的選擇
  5. 161kv incoming, more than twenty thousand metres of hv cable, twelve thousand metres of cable tray, 282 sets of

    氣: 161kv受、戶外線二萬余公尺、戶內線槽長達12公里、開辟箱282盤。
  6. Optimal planning of high voltage distribution substations

    高壓配電站的優化規劃
  7. The allocating and locating alternatively ( ala ) algorithm, is widely used to deal with sources locating problem, but it depends on the initial location to a large degree

    該方法將高壓配電站優化規劃問題分為平面定位和組合優化兩個子問題。
  8. Examples show that the algorithm proposed meets the requirement of engineering and it is an effective approach to settling the problem of optimal planning for high voltage distribution substations with fast speed

    算例表明,該方法可以求得工程上的滿意解,並且計算速度快,是求解高壓配電站優化規劃問題的有效方法。
  9. This project makes some researches with emphasis on the mv / lv distribution power supply situation under the present load condition. some results such as the calculation of line load rate, theoretical line consumption rate and electric voltage decrease are acquired by the mathematical analysis, and thus the power supply capability is evaluated comprehensively. the same has been done to the lv power network

    課題在系統搜集分析蘇州供企業的背景資料,即企業概況、力需求、輸網、高壓配電網狀況基礎上,重點研究了當前負荷下的中低網供情況,並通過數學分析得出線路的負載率的計算、理論線損率以及降等各項運行指標,綜合評估得出其供能力。
  10. Powerformer is a new high voltage generator , which use xlpe cable as stator winding instead of rectangular conductor bars , thereby it overcome the shortcomings which the shape of these conductors results in an uneven electric field distribution with high electric field strenghs at the corners especially and prevents the output voltage of the conventional generator from exceeding about 36kv powerformer offers a direct connection to the network without the need for a step - up transformer as a consequence, there are some merits in the total plant equipped with powerformer, such as high effiency, high availability, low maintaining cost and giving less environmental impact

    Powerformer是一種新型的機,它採用纜代替矩形導體作為定子繞組,從而克服了矩形導體場分佈不均勻,特別是在矩形導體在導體拐角處場過于集中而使常規發機的輸出等級不能於36kv的缺點,使其能夠直接和輸網相聯,這樣就不需要升器,同時也使裝powerformer的廠具有如下優點效率、可利用率提、維修費用降低和降低了對環境的負面影響。
  11. The siemens scope of supply includes power equipment such as medium and high - voltage transformers as well as all the high, medium and low - voltage distribution systems

    西門子供給范圍包括力設備,如中器以及所有、中、低系統。
  12. Series of high pressure thermocouples thermalresistances and thermowells, the thermocouple take the form of spring - loaded, of which protective tube and flange are forged of special alloy, as well the thermowell are formed with bar stock drilled. more further, theconnecting between thermowell and flange can be compressed with tapered thread and the groove at the lower end of flange can be welded with argon arc. these thermocouples are usually used in high equipments of hydrogen cracking device, cracker and vaporizer etc for pressure - resistant in over 30 mpa, operating temperature from 0 up to 800

    系列偶阻及套管,熱偶採用彈簧著式,保護套管和法蘭選用特殊合金材料鍛造,套管採用棒料整體鉆孔加工而成,與法蘭連接處以錐管螺紋合併與法蘭下端渠槽處用氬弧焊接,耐30mpa ,使用溫度0800 ,可長期使用在加氫裂化裝置裂解裝置,氣化爐等設備中。
  13. Zb substation is consist of hv switch cubicle, lv distributor, distribution transformer and enclosure, air type load breaker is used for hv, transformer used belong to dry type transformer or oil - immersed transformer, with excellent heat insulation and preinstallation structure, which makes it excellent appearance and heat insulation feature

    Zb型變站由開關櫃,低屏,器及外殼四部分組合而成,是空氣式負荷開關:變器為乾式變器或油浸式變器。
  14. Replacement of high voltage switchboards, transformers and low voltage system of the tunnel power supply system in lion rock tunnel, replacement of field equipment of toll collection system in cross - harbour tunnel and replacement of ventilation control panels, exhaust fans, motors and flexible connectors in aberdeen tunnel

    更換獅子山隧道供系統的高壓配電板變器和低系統更換海底隧道車輛繳費系統的路面設備及更換香港仔隧道的通風控制屏抽氣扇動機和軟接頭
  15. Mine explosion - proof high - voltage distribution device

    礦用隔爆型高壓配電裝置
  16. Code for design of 3 110kv high voltage electrical installations

    高壓配電裝置設計規范
  17. Design code for high voltage electrical installation 3 110kv

    3 110kv高壓配電裝置設計規范
  18. Hydraulic and hydroelectric engineering design code for high voltage electrical installation

    水利水工程高壓配電裝置設計規范
  19. Based on the research achievement of the key technologies, aiming at the electromechanical equipment systems in practical project, such as elevator system, high voltage power supply system, refrigerating system, wind - cooling refrigerating system,

    論文最後基於上述關鍵技術的研究成果,針對實際工程中的機設備系統,如梯系統、高壓配電系統、冷水機組系統、風冷熱泵系統等,開發完成了一套樓宇機設備集成監控系統。
  20. Being basis on the 14 regional grid planning texts of historical data of hunan province, initially determining the factors that affecting power grid construction ; to reflect the distribution of information to determine the scale of construction leading indicators to assess the scale, with its own network of intelligence presented to the region to assess the scale of the distribution network - building indicators system ; establishes assessment models of evaluating 110kv distribution network building scale integrated ; considering the main factor that influencing the construction scale of the distribution network, the improvement method of 10kv distribution networks capacity - load ratio is proposed ; the combination of high voltage distribution network planning optimization technology results presented evaluation pressure distribution network building scale integrated assessment methods

    課題以湖南省14地區網已有規劃文本歷史數據為基礎,初步確定各種影響網建設的因素;以反映網建設規模的主導信息來確定規模評估指標,提出了符合自己網情的地區網建設規模的評估指標體系;建立了評價110kv網建設規模的綜合評估模型;通過研究各影響因素與負荷發展儲備系數參數的關系提出了確定10kv變容載比的方法;結合高壓配電網規劃的優化技術成果,提出了評價中網建設規模的綜合評估方法。
分享友人