高山測站 的英文怎麼說

中文拼音 [gāoshānzhàn]
高山測站 英文
high-mountain station
  • : Ⅰ形容詞1 (從下向上距離大; 離地面遠) tall; high 2 (在一般標準或平均程度之上; 等級在上的) above...
  • : 名詞1 (地面形成的高聳的部分) hill; mountain 2 (形狀像山的東西) anything resembling a mountain...
  • : 動詞1. (測量) survey; fathom; measure 2. (測度; 推測) conjecture; infer
  • : Ⅰ動詞1 (站立) stand; be on one s feet 2 (停下來; 停留) stop; halt; pause Ⅱ名詞1 (停車點) st...
  • 高山 : alp; high mountain
  1. This paper studies the spatial distrihution of water vapor press in the mountain areas of chongqing, with the month average data of water vapor press of climatic reorganized data including 34 meteorological observing stations in chongqing and 4 around it from 1971 to 2000 and 7 meteorological sentries in it from 1997 to 1999, and 100mx 100m dem of chongqing. according to the theory of mountain climate and basing on gis, it analysises the influencing factors to water vapor press decreasing coefficients in chongqing, and studies the relations among water vapor press longitude latitude and sea level elevation, and founds the water vapor press spatial distribution model in chongqing, and calculates the spatial distribution of the month average and the year average water vapor press in chongqing, and completes the cartographies of the water vapor press spatial distribution of chongqing

    本文利用重慶地區34個及其周圍4個常規氣象觀1971 2000年30年和7個氣象哨1997 1999年3年氣候整編的月平均水汽壓資料,以及重慶地區100m 100mdem數據,對重慶地區地水汽壓空間分佈進行研究根據地氣候學原理,利用gis技術,分析重慶地區水汽壓遞減系數的影響因子,研究水汽壓與經度緯度和海拔度等因子的關系,建立重慶地區水汽壓空間分佈模型,計算重慶市月平均和年平均水汽壓空間分佈,並完成重慶市水汽壓空間分佈的制圖。
  2. To overcome this problem, not only the meteorological observation network has to be equipped with automated, higher precision, and more economical devices and instruments, but also a synthetic mobile observation system is required for filling in the data gaps between the surface and upper air sounding stations

    為了克服這一問題,除了研製自動化程度量精度和性能價格比的儀器設備來裝備現有的定點大氣觀網外,還應建設一些流動的大氣監系統,以獲得常規大氣觀空檔間(如大洋、區和荒漠等無人區)的天氣現象和大氣環境變化的信息。
  3. Normally water resources is affected by human activities and climatic change, but it is affected mainly by climatic change in runoff forming regions located in the high and middle mountainous area in the northwestern china. river runoff in the hexi inland arid region all originates from the qilian mt. area and the change of mountainous runoff resulted from global weather warming up and will bring an important effect to the development of society and economy in the hexi region. so the response on mountainous runoff and its changing trends are analyzed on the basis of the measured data of precipitation, air temperature, and discharges observed from some weather and hydrologic stations in the studied area. the results show that seasonal variation of mountainous runoff in the hexi inland region is mainly affected by the river ' s geographical location and supply source, and the yearly change by precipitation and that in the west of the region by air temperature besides precipitation. there are some obviously regional differences in the influences of climatic change on surface runoff in the hexi inland arid region, that is, rivers runoff in the west of the hexi area have been increasing and rivers in the east part have been decreasing, and the rivers runoff in the central part presented slowly increase trend, such as the heihe river, but it is not quite obvious

    一般情況下,水資源的變化主要受氣候變化和人類活動的影響,但在位於我國西北內陸乾旱地區的中地帶,徑流的形成主要受前者的影響.甘肅省的河西內陸乾旱區是該省重要的工農業生產和經濟開發區,這里各項社會和經濟活動與出徑流的變化都有著十分密切的關系.因此,筆者根據有關水文氣象臺的降水、氣溫和徑流觀資料,分析了以黑河、昌馬河、西營河等主要河流為代表的河西內陸區出徑流的變化特徵與規律.結果表明,河西內陸區出口徑流的季節變化主要受地理位置和河流補給來源的影響,而年際變幅則受區降水量年際變化及變幅的影響十分明顯.目前,梨園河以西河流水量處于上升階段,梨園河以東的河流則處于下降的階段;以黑河幹流鶯落峽水文年徑流為代表的走廊中部地區的出口徑流正處於1990年開始的枯水段的上升段.但總體而言,河西內陸乾旱區出口徑流的變化相對比較穩定.預計今後若干年內,河西內陸乾旱區東段河流出口徑流的變化以偏枯為主,中段、西段河流出口徑流的變化以平水或平水偏豐為主
  4. Supervision and consultation projects completed : ( 1 ) jiangsu xindadou square ( 50, 000m2, two 30 - story buildings ), worked as chief supervision engineer ( consultation ) ; ( 2 ) " yanqiao overpass service center of xicheng highway ( the first overpass type service center on highway in china ), worked as chief supervision engineer ( consultation ) ; ( 3 ) the ninth 5 - year - plan updating technology project of huaiyin tobacco plant, 50, 000m2, worked as chief ( supervision and consultation ) ; ( 4 ) the softy testing, analysis and consultations of nanjing international conference and exhibition center, site - erected structure, 75m span steel roof truss ( the largest one in china ), worked as chief of test and consultation ; ( 5 ) " the consultation service of the testing, analysis and update technology of the reliability of the joints of intermediate floor slabs, beams and columns of base beam of sanshanjie station of nanjing metro " etc

    完成"江蘇新大都廣場( 5萬多平方米,二幢30層) "建設監理咨詢(總監) ; "錫澄速堰橋跨線服務區(國內首座) "建設監理咨詢(總負責) ; "淮陰卷煙廠9 . 5技改項目( 5萬多平方米) "建築監理咨詢(總負責) ;主持了"南京國際會展中心75m跨鋼屋架(國內最大距)現場施工安裝結構安全性試分析咨詢" ; "南京地鐵三中樓板及底板樑柱節點構造技術安全可靠性的試分析與技術改進咨詢服務"等項目。
  5. The qinshan power station environment supervisor system for the nuclear radiation dosage is an intelligent continual online supervisor system. it is equipped with high alert automated device with rs131, which makes it getting stronger functions and higher abilities

    核電環境輻射監系統是一個全自動智能化連續在線輻射監系統,它配備了靈敏度、寬量程的輻射探儀和自動采樣設備,該系統功能強,可靠性
  6. Main problems are the anti - slide test report and inspection record of high strength bolts that connecting structure steels have not been provided according to the requirement of design ; since there is no measurement certificate attached to the test report issued by the jincheng mine project quality inspection station of shanxi coal mine industry administration bureau, it will not be allowed to use these test reports as the one of unit project quality control documents

    主要是未按設計要求提供出鋼架連接處強度螺栓抗滑移系數試驗報告和檢紀錄;由西省煤炭工業管理局晉城礦區工程質量檢出具的試驗報告無計量認證章,在今後的工程中不能再作為單位工程質量控制資料中的試驗報告。
  7. The research project in this thesis is " study on measurement and control system for vacuum magnetic switchgear based on intel 80c196kb ", which is a continuation project of " study on measurement and control system for vacuum magnetic swichgear based on plc " and is sponsored by education committee, science and technology committee of shanxi province. the reason why this project is put forward is because the cost of plc measurement and control system is high, and it is not adaptable to large - scale production. the main contents of this project is aimed at solving the key problems of centralized control and integrated protections of high capacity motors used in high yield and efficiency automation coal faces

    本文研究的內容是「基於intel80c196kb控制的礦用真空磁力控制控系統的研究」 ,它是西省科技攻關項目「基於plc控制的礦用隔爆兼本質安全型組合磁力控制的研究」 (項目編號為no . 20002013 )的后續課題,主要是針對plc控制系統成本,不利於規模化生產的缺點而提出的,該課題的研究內容主要是解決礦井效綜合自動化採煤工作面大型電動機的集中控制和保護等問題。
  8. There are five survey stations in the south and north main trench of xiaoxiang reservoir. the system watches real time the change of water level and the quantity of flow in the five survey stations. so the water resource can be managed systematically and scientifically, some unrational and unscientific management for human subjectivity as before will be avoided

    瀟湘水庫的南乾渠上布置了瀟湘水庫點、層板廠點、南乾渠管理所點、湯家點和大觀音點五個點,系統實時監這五個點的水位和流量的變化,使灌區對水資源的管理達到系統化、科學化的度水平,避免灌區的人為主觀管理的不合理性和不科學性。
  9. When the cable car stopped, he steeped out on to the plattorn and judged the distance above the head of the giant saint to the top of the hill

    纜車到達了目的地,喬走上臺,目了一下從聳的聖女像到頂的距離。
分享友人