高峰流量期間 的英文怎麼說

中文拼音 [gāofēngliúliángjiān]
高峰流量期間 英文
peak flow period
  • : Ⅰ形容詞1 (從下向上距離大; 離地面遠) tall; high 2 (在一般標準或平均程度之上; 等級在上的) above...
  • : Ⅰ名詞1. (山的突出的尖頂) peak; summit 2. (形狀像山峰的事物) peak-like thing Ⅱ量詞(用於駱駝)
  • : Ⅰ動1 (液體移動; 流動) flow 2 (移動不定) drift; move; wander 3 (流傳; 傳播) spread 4 (向壞...
  • : 量動1. (度量) measure 2. (估量) estimate; size up
  • : 期名詞[書面語]1. (一周年) a full year; anniversary 2. (一整月) a full month
  • : 間Ⅰ名詞1 (中間) between; among 2 (一定的空間或時間里) with a definite time or space 3 (一間...
  • 高峰 : peak; summit; climax; height; tor
  • 流量 : rate of flow; flow; runoff; discharge; throughput; (flow) rate; quantity (of flow); flux
  • 期間 : time; period; course; duration; term
  1. Main contents for studying of the paper is : ( 1 ) analysing the outcome, characteristic and the problem of the hot water supplydesign second flow method in the europe and the usa. ( 2 ) it is determined that value frequenly of different fixture use in the period of using water high peak. ( 3 ) the relation between the n and the hot watersupply design second flow is got by applying program to computer under the different probablity

    本課題研究的主要內容為: ( 1 )分析對比歐美主要國家熱水設計秒計算方法的結果、特點及存在的問題; ( 2 )根據我國居民生活用熱水特點,由用水標準推算出各類型水用戶用水的衛生器具使用概率; ( 3 )編制計算機程序,計算不同使用概率情況下,給水當與熱水設計秒的關系表; ( 4 )建立熱水設計秒q _ g和給水當n與使用概率p之的相關關系; ( 5 )繪制《建築給水排水設計規范》中有關熱水設計秒計算方法的計算用圖表。
分享友人