高峰負荷時 的英文怎麼說

中文拼音 [gāofēngshí]
高峰負荷時 英文
peak hours
  • : Ⅰ形容詞1 (從下向上距離大; 離地面遠) tall; high 2 (在一般標準或平均程度之上; 等級在上的) above...
  • : Ⅰ名詞1. (山的突出的尖頂) peak; summit 2. (形狀像山峰的事物) peak-like thing Ⅱ量詞(用於駱駝)
  • : Ⅰ名詞1 (負擔) burden; load 2 (虧損) loss 3 (失敗) defeat Ⅱ動詞1 [書面語] (背) carry on th...
  • : 荷名詞(蓮) lotus
  • : shí]Ⅰ名1 (比較長的一段時間)time; times; days:當時at that time; in those days; 古時 ancient tim...
  • 高峰 : peak; summit; climax; height; tor
  • 負荷 : [電學] load; charge; weight
  1. Abstract : the paper points out that the main factor influencing residential load variation are the following household appliance : electric cooker, electric shower bath, air conditioner, etc. in peak - value time from inquiry

    文摘:通過對住宅用電進行調查,分析了用電間內大功率家用電器,如電炊具、電淋浴器、空調機等投入是當前住宅用電變化的主要因素。
  2. With the load sharply increasing in recent years, the beijing electric network often runs over - load and the lack of power in summer and winter sometimes appears

    近幾年,北京電網的增長非常快,期電網經常滿或超運行,夏季和冬季缺電和供電不足的現象也有發生。
  3. A modified svm model, which can predict peak recognition theory, was proposed in this paper. this model can increase the weight of peak error in the loss function of structural risk minimization, thus improve prediction accuracy of hourly water demand peak

    本文提出一種能夠進行值識別的改進svm演算法,該演算法在結構風險最小化準則的目標函數中加大值誤差的權重,從而提用水值的預測精度。
  4. In consideration of the special features of the power system of lhasa area, the station uses the surplus electricity to draw water and store energy when its load is at the lowest and discharges water to generate electricity at the peak load

    為維護生態環境,按拉薩電力系統的特點、電站利用低谷的多餘電量抽水蓄能放水發電,總體上不改變羊卓雍湖的水量,以力保羊湖水位不下降。
  5. With fast development of our country " s gas industry and air ' s increasingly serious contamination in city, using gas instead of coal and supplying energy in high efficiency and cleanliness has become necessary way in city. there are different problems in the current heating ( air conditioning ) systems. in the cogeneration system, heat and power affect each other, heating - pump heating ( aie conditioning ) system can not satisfy the peak load very well, the cost of gas fuel in boilor heating sestem is so high. the high generating efficiency of the diesel - engine two - sourse heating ( air conditioning ) systems is limited in range of 100kw - 1000kw, the heating scope is so limited. combined cycle of two sourse heating ( air conditioning ) system is most suitable selection to buesness community with big scope my paper aim at this syetem ' s primary question when it is applied in our country - - - - bringing project into execution and technology economy feasibility and off - design performence, combined with a certain demonstrating project in beijing buesness community, going along with calculating and analyzing, drawing out some efficient datas and conclusions, based on this, bringing out primary alements affecting combined cycle of two sourse heating ( air conditioning ) system " economics

    熱電聯產系統熱電相互牽連,熱泵供暖(空調)系統不容易很好地滿足尖,鍋爐供暖系統供熱中天然氣燃料構成的成本過,內燃機雙源供暖(空調)系統的發電效率僅限於100kw - 1000kw范圍,供熱面積有限。對于大面積的商業園區、居民小區,燃燒天然氣的燃氣-蒸汽聯合循環雙源供暖(空調)系統是最佳選擇之一。本論文針對該系統在我國應用的主要問題- - -方案的技術實施與技術經濟可行性,結合北京某一商業園區示範工程,進行了系統的計算與分析,得到了有效的數據與結論,在此基礎上,提出影響聯合循環雙源供暖(空調)系統經濟性的主要因素,並進行敏感性分析,得出有益的結論;最後通過各種供暖方案的比較分析回答了某些人對該系統的疑慮和不解,並指出系統的優化方向。
  6. As the ratio of peak samples to total training samples is low, the prediction accuracy of peak load is poor when applying support vector machine ( svm ) model to predict a periodical load

    在應用svm模型于具有周期性的預測,由於在訓練樣本中值或谷值樣本所佔比例很少,從而導致載預測精度不
  7. Under the new situation, marketing and company development system based on market oriented, deepening market permeation on objective market, widening occupying substitute - goods market, improving service level, increasing market competitive ability, which are great effecting the national economy and people ’ s living standard

    據介紹,美國、日本、加拿大、德國、法國、義大利等國家都有一支龐大的隊伍從事需求側管理工作。僅2003年,美國投入約15 . 6億美元實施電力需求側管理與營銷工作,節電537億千瓦,減少2200萬千瓦。
  8. Maintaining power delivery as load increases in the morning, keeping it within security limits during daily peaks, and managing load decreases at night are just some of the tasks the control system will perform

    控制系統將責的一些任務就是在上午增加的候維持電力輸送,在每日保持在安全限度內,以及管理晚上的降低。
  9. The cold storage technology of air conditioning has become an important measure used to adjust loads and save electricity as the result of transforming a part of high loads in the day to low loads in the night

    空調蓄冷技術能夠將日間部分用電轉移到夜間段,因而成為我國當前積極推廣和利用的一項利國利民的調節電措施。
分享友人