高扭矩檢驗 的英文怎麼說

中文拼音 [gāoniǔjiǎnyàn]
高扭矩檢驗 英文
high torque test
  • : Ⅰ形容詞1 (從下向上距離大; 離地面遠) tall; high 2 (在一般標準或平均程度之上; 等級在上的) above...
  • : 動詞1 (掉轉; 轉動) turn round 2 (擰; 旋轉) twist; wrench 3 (擰傷) sprain; wrench 4 (走路時...
  • : 名詞1. (畫直角或正方形、矩形用的曲尺) carpenter's square; square2. (法度; 規則) rules; regulations 3. [物理學] moment
  • : Ⅰ動詞1 (查) check up; inspect; examine 2 (約束; 檢點) restrain oneself; be careful in one s c...
  • : 動詞1. (察看; 查考) examine; check; test 2. (產生預期的效果) prove effective; produce the expected result
  • 扭矩 : torsion; torque; twist; lay; moment of torque; moment of torsion
  • 檢驗 : checkout; test; examine; inspect; verify; survey; check;checking;testing;[英國]jerque(指檢查船舶...
  1. At the same time, it detailed demonstrate and carry out the way, which apply housing electric spindles at generation state to carry out housing toque loading in the joint testing and indirectly estimation housing torque loading by the electromagnetism torque of inner tube electric spindles. thus, the technical problem that the high speed shafting torque loading device and torque sender are difficult to ins tall is solved. and it saves a set of expensive high speed shafting torque loading and measuring device

    同時,詳細論證並實施了採用外套電主軸工作在發電狀態實現接合試的外套加載和通過內套電主軸的電磁轉來間接估算外套加載的方法,從而解決了速軸系加載裝置和傳感器不宜安裝的技術難題,並且節省了一套昂貴的速軸系加載和測裝置,該成果填補了國內速單向軸承試加載領域的空白,達到了國內領先水平。
  2. The major conclusions of the article are : 1 ) it presents the methods of the key parameter selection and calculation of the gear pump, including the volumetric capacity, the gear profile and its parameter, the leakage, and input power. and it demonstrates the rationality of the parameter selection through experiments

    本論文的主要工作及結論如下: 1 )給出了參數齒輪泵關鍵技術參數的計算、選用方法,包括齒輪泵的轉排量、齒輪泵的轉子型式及其參數、齒輪泵的工作間隙、卸荷槽、齒輪泵的輸入的計算選擇方法,並用實方法了關鍵技術參數選擇的合理性。
  3. Having analyzed the check result of the torsional moment on the scene of the big hexangular high - stength bolts conjuncted in the service based on the engineering example, the paper gives two reseans about the lose of pretension the earlier checking of the moment and the inaccurate maintenance method

    摘要通過某工程實例,對在役大六角強螺栓連接副現場結果進行了理論分析,找出了強螺栓預拉力損失的主要原因:一是現場測時間過早,導致預拉力損失不穩定,前期損失較多;二是使用中維護不夠。
分享友人