高斷面 的英文怎麼說
中文拼音 [gāoduànmiàn]
高斷面
英文
maximum section of passenger flow-
The method of modified simplex was applied to optimize the models, and the fitting results show that liu - logistic model was more suitable than logistic model to the actual growth trend of form. taxus chinensis var. mairei population, and the highest growth rate of basal area was the tenth age class, namely the phase when breast diameter was 68 ~ 76 cm
以胸高斷面積代替種群生物量,分別採用logistic常規模型及劉金福提出的logistic改進模型對南方紅豆杉種群的增長動態進行研究,運用改進單純形法對模型進行優化,擬合結果表明改進模型比logistic常規模型更符合南方紅豆杉種群的增長趨勢,南方紅豆杉種群的最大增長速度出現在第10齡級,即胸徑為68 76cm時期。The report takes account into the influence of foreshore and shallow foreshore, roughness, slope, berm, wave attack angle, vertical wall and so on
報告給出了復雜斷面上波浪爬高和越浪量的計算公式,計算中考慮了前灘、邊坡糙率、邊坡坡度、平臺、波浪入射角以及豎墻等因素的影響。The key production technology of aluminum sheets are thickness accuracy and shape control, its main application products are drink cans 、 automobile parts, electrolytic condenser 、 small tube for condenser 、 drum for laser printer
鋁合金板材之關鍵生產技術為提高板厚精度及形狀控制技術,應用製品主要有飲料罐、汽車零件、電解冷凝器、小斷面冷凝管、雷射印表機感光輥筒。The authors put forwards a new method which select the terrain profile perpendicular to falling line ( opposite direction of gradient ) to determine the candidate points on ridge and valley
摘要利用有關數學原理從理論上對地形高程斷面極值法進行了分析和深入的研究,指出了該方法的不足。It was specially pointed out that, when the tail water is constant maximum tide, the computed flood surface is higher than that of nonsteady current, so there is some safety superelevation. underestimation of the roughness will make downward bias to compute along - river surface and bring hidden trouble for flood control. to improve the section can decrease the water level or offset the water rise for increase of floodplains " roughness, but it need much engineering works
特別提出,按照恆定流計算出來的設計水位比非恆定水位具有一定的安全儲備;而對于灘地糙率的低估又會造成設計水位的偏低,給防洪工作帶來隱患;如果利用改進斷面形式來降低水位或彌補糙率增加帶來的水位抬高,需要較大的工程量,所以平時應注意灘面的減糙管理工作。In this paper, the finite - element numerical analysis calculation is applied to the foundation of high - rise and multi - floor building and the evolvement law of stress and displacement of tunnel used by urban traffic to explore the mutual influence between the wall rock of underground space and high - rise building foundation, taking account of the specific construction situation in the " sanmu garden " project in dadukou district in chongqing, from the perspective of underground space static - force structure stability analysis to open a underground tunnel with 6m in span and 7. 5m in height for track traffic 20m below the surface. this paper, taking considerations of three different states, i. e. the natural state without any artificial interference, the state of high - rise buildings on the surface, and the underground tunnel state with excavation for track traffic, and four plane lines and four vertical lines, analyzes and studies the distributing law of stress and displacement of calculation section from the following aspects : ( 1 ) the main stress vectorgraph, displacement distribution graph ( ux, uy ) and chromatogram graph of stress isoline ( 1, 2, xy ) of section under different states ; ( 2 ) the contrastive distribution curve of stress ( 1, 2, xy ) of different plane and vertical lines under the same state ; ( 3 ) the contrastive distribution curve of stress ( 1, 2, xy ) of the same plane and vertical lines under different states, wishing to provide references for underground space utilization and project designing and construction of the tunnel under high - rise buildings in the future
本文結合重慶市大渡口區「三木花園」開發建設項目,從地下空間靜力結構穩定性分析角度出發,針對在該項目中涉及的高層和多層建築物以及在其地下20米處開挖了一個用於軌道交通的跨度6米,高7 . 5米的地下隧道這一具體工程情況,採用2d - 3d -有限元結構分析程序對高層與多層建築物的地基基礎及其與城市軌道交通使用的地下隧道圍巖的應力與位移演變規律進行了有限元數值分析計算,探索了地下空間圍巖與高層或多層建築物地基基礎之間的相互影響,通過考慮未受到任何人為擾動影響的天然狀態、地表存在多層或高層建築物狀態和地下開挖用於軌道交通的地下隧道狀態等三種不同狀態以及4個水平剖線和4個垂直剖線等不同情況,從以下幾個方面具體分析研究了計算斷面的應力與位移分佈規律: ( 1 )在各種不同狀態下計算斷面的主應力矢量圖、位移分布圖( ux 、 uy )以及應力等值線色譜圖( _ 1 、 _ 2 、 _ ( xy ) )等; ( 2 )相同狀態下不同水平與垂直剖線的應力_ 1 、 _ 2和_ ( xy )對比分佈曲線; ( 3 )不同狀態下相同水平或垂直剖線的應力_ 1 、 _ 2和_ ( xy )的對比分佈曲線等,為今後在對地下空間的開發利用以及在高層建築物地下開挖硐室時的工程設計和工程施工提供參考依據。It is concluded that for china, owing to its high cultural status, its accommodation capacity has been relatively diminished rather than reinforced ; while for japan, its accommodation mechanism has always been more active and responsive in face of the stimulus from outside, allowing it to adjust more readily to the changing environment through reforming the original schemes
運用發生認識論對導致該現象的內在心理成因進行考察可發現:中國因長期處于文化高勢能地帶,其同化機制強大,順應能力因得不到鞏固而弱化;日本則因不斷面臨新刺激,其改變舊格局和創新的順應能力大大增強。Cross - section design of a controllable hypersonic inlet. the research is being done at the nanjing university of aeronautics and astronautics
南京航空航天大學正在進行一個可控高超音速進氣道斷面設計研究。On this basis, puts forward a kind of scheme and idea of displacement ventilation using in high - speed railway air - conditioned car, makes numerical simulation on the flow field of the car and calculates the pmv value of the typical section
在此基礎上,提出了下送風用於高速列車空調的一種方案和構想,並對設計方案的流場進行了數值模擬與典型斷面的pmv值計算。The species, heights, diameter breast heights, canopy widths and plant numbers in 38 quadrats of 6 belt transects, which were located in yingsu cross - section and kaerdayi cross - section lying in the lower reaches of tarim river where populus euphratica concentrated, were investigated to study the distribution patterns, aggregation intensities and distribution pattern scales of p. euphratica populations at different distances away from the river
摘要在塔里木河下游胡楊分佈集中的英蘇、喀爾達依斷面,設置了6條樣帶38塊樣地進行植被種類、高度、胸徑、冠幅、株數等因子調查,研究了不同離河距離胡楊格局分佈類型、聚集強度及其格局規模。Practice showed that if added to certain fish meal, soybean meal in the cornmeal, and to ensure that protein content of 20 per cent or more, to make up for the corn protein and vitamin content lower insufficient, it will be effective in preventing diarrhea piglets, fur lackluster phenomena, and increasing weaning weight while do not use complete granular feed
實踐證明,如果乳豬不採用全價乳豬顆粒料,可在玉米面中添加一定的魚粉、豆粕等高蛋白質飼料,並保證其蛋白質含量在20以上,以彌補玉米蛋白質和維生素含量較低的不足,可有效防止仔豬腹瀉、皮毛無光澤等現象,並可提高斷奶窩重。For the foundation treatment of the experimental segment of the south shore expressway of the hangzhou bay cross sea bridge, the in situ monitoring has been conducted for more than two years by use of vacuum - surcharge preloading
摘要結合杭州灣跨海大橋南岸接線高速公路試驗段工程,對真空堆載聯合預壓技術處理的試驗斷面進行了長達兩年多的現場測試。The bar can enhance the bearing capacity and stiffness of the member, so that the cross section area of member can be significantly reduced, and function area of the building can be increased
由於截面中配置有型鋼,構件的承載能力、剛度大大提高,構件的斷面尺寸大大減少,房間的使用面積明顯增加,房間中的設備、傢具也能更好布置。Because of that, engineers need to create the profiles piece by piece, and also, the data within profile drawings, such as cut - and - fill, engineers have to do it manually
此外,縱斷面圖的各項數據資料,如:現地高程、設計高程、挖方、填方…等資料,也必須一項一項的手動完成。In order to improve the load transfer ability of the highway with heavy traffic, a dowel bar can be installed in the contraction joint of the rigid pavement
摘要對于交通量日益增大的高速公路,可以通過增設傳力桿來提高路面縮縫的傳荷能力,有效地減少錯臺和斷板現象。The duration from the occurrence of penetrating chinks to dyke breaches depends on the composition and cross - sectional size of the dyke body, and the river water level
從發生貫穿性漏洞到潰口的時間與堤身組成物、堤身斷面大小、江水位高低有關。Variance index of the settlements of soft clay subgrade was inducted to analyze the asymmetry settlement rules under the influence of depth of fill, fill speed, geologic types of soft clay etc
利用這些觀測數據,引入路堤斷面中點和兩側坡腳地基表面3點沉降的方差這一統計學指標,詳細分析了地質結構,填築速率、填築高度以及硬殼層等因素對軟基不均勻沉降的影響,得到了一些有意義的結論。The curves of the consolidation settlement in soft clay base of flood land are gained, which compare the effect of sand drain. the settlement - time curves in different period are also gained, which increase the height of embankment to 8m, based on the test data of hang - yong highway. furthermore, the consolidation settlement characters of these entity engineering are analyzed, and, the variation rules of the rate of grade and degree of the curves in different period in the whole section, the maximal settlement and the liner regression relations between the rate of grade and degree are calculated
本文利用大變形固結有限元分析程序( lscfea )中的小變形平面固結分析單元( sse2 ) ,結合實體工程項目進行了地基固結沉降的有限元計算,分別得出河灘相軟土地基在考慮砂井和未考慮砂井作用下的固結沉降曲線及杭甬高速公路試驗段在高堆載情況下的固結沉降曲線;並對以上曲線特徵進行了分析,得出各時間段曲線斜率、角度在整個斷面的變化規律,以及沉降最大值與斜率、角度變化之間的線性回歸關系。While the flutter self - excited loads of a bluff section has a quality of obvious nonlinearity. and the application of flutter derivatives to self - excited loads of the bluff section is close to a linear relationship. 5
而鈍體斷面的顫振自激力高次諧波分量較大,具有較明顯的非線性響應特徵,驗證了用顫振導數表示鈍體的自激力只是一種線性近似。The construction methods and caving protection measures for punching high thick and loosen soft coal seam in luling coal mine no. 2 dark tilt well in huaibei coal mine area are introducded. they include small section enlarged after the heading caving, high negative pressure and multi - raw drilling holes and strenous drawing - off, concentrated cross drill holes, cutting while drawing - off and putting the metal frame away
介紹了淮北礦區蘆嶺煤礦2主暗斜井採用小斷面導硐后刷大、高負壓多排鉆強抽,密集交叉鉆孔邊掘邊抽及設置金屬骨架施工方法和防突措施揭穿高突特厚松軟煤層。分享友人