高架線 的英文怎麼說
中文拼音 [gāojiàxiàn]
高架線
英文
elevated line-
However, up to today with the development of social industrialization, especially the advance of building and building technology, the successive appearance of land three - dimensional usage such as high building, overhead railway, underground railway, air corridor, underground market, the wire of high voltage and last sewer etc., at the same time, many problems produced by the ownership and the usage of land space also have been put forward
土地所有權的行使及於土地的上下,土地所有權的效力「上達天宇,下及地心」 。然而,時至今日,隨著社會工業化的發展,特別是現代化土木、建築技術的進步,高樓大廈、高架鐵路、地下鐵道、空中走廊、地下商場、高壓電線、上下水道等土地立體化利用情形陸續出現,同時,因對土地空間所有和利用所產生的諸多問題也開始被提出。For protective female worker healthy, law set the labor range that female worker prohibits be engaged in, unit of choose and employ persons must not arrange female worker to be engaged in the following these law prohibit the labor that female worker is engaged in : ( 1 ) course of study of mine well dirty ; ( 2 ) silvan industry cutting, put in arris and banish exercise ' s charge ; ( 3 ) " physical labor intensity classifications " the 4th class in the standard the exercise of physical labor intensity ; ( 4 ) the assembly of bldg. scaffold and remove operation, and the altitude wiring of electric power, telegraphic industry works ; ( 5 ) load continuously ( point to load the frequency is in 6 times hourly above ) load every time more than 20 kilograms, discontinuous load load every time more than 25 kilograms exercise
為了保護女職工的身體健康,法律規定了女職工禁止從事的勞動范圍,用人單位不得安排女職工從事以下這些法律禁止女職工從事的勞動: ( 1 )礦山井下作業; ( 2 )森林業伐木、歸楞及流放作業; ( 3 ) 《體力勞動強度分級》標準中第四級體力勞動強度的作業; ( 4 )建築業腳手架的組裝和拆除作業,以及電力、電信行業的高處架線作業; ( 5 )連續負重(指每小時負重次數在6次以上)每次負重超過20公斤,間斷負重每次負重超過25公斤的作業。The labor range that female worker contraindication undertakes includes : ( 1 ) course of study of mine well dirty ; ( 2 ) silvan industry cutting, put in arris and banish exercise ' s charge ; ( 3 ) " physical labor intensity classifications " the 4th class in the standard the exercise of physical labor intensity ; ( 4 ) the assembly of bldg. scaffold and remove operation, and the altitude wiring of electric power, telegraphic industry works ; ( 5 ) load continuously ( point to load the frequency is in 6 times hourly above ) load every time more than 20 kilograms, discontinuous load load every time more than 25 kilograms exercise
女職工禁忌從事的勞動范圍包括: ( 1 )礦山井下作業; ( 2 )森林業伐木、歸楞及流放作業; ( 3 ) 《體力勞動強度分級》標準中第四級體力勞動強度的作業; ( 4 )建築業腳手架的組裝和拆除作業,以及電力、電信行業的高處架線作業; ( 5 )連續負重(指每小時負重次數在六次以上)每次負重超過二十公斤,間斷負重每次負重超過二十五公斤的作業。Clear ceiling height of 2. 8 metres 150 mm high raised floor system to provide flexible access for laying power, signal data and telephone networks
高架式地臺系統,空間高度約150毫米,方便租戶鋪設電線電腦及通訊系統The maximum office clear ceiling height is 2. 7m a 150mm high raised floor system to provide flexible access for laying power, signal data and telephone networks
高架式地臺系統,空間高度約150毫米,方便租戶鋪設電線電腦及通訊系統The maximum office clear ceiling height is 2. 5m a 150mm high raised floor system to provide flexible access for laying power, signal data and telephone networks
高架式地臺系統,空間高度約150毫米,方便租戶鋪設電線電腦及通訊系統The construction of pearl line will have a good effect on the design and construction of civil architecture and the development about elevated rail transit
明珠線的建設對我國高架軌道交通的土建設計和施工,乃至高架軌道交通的發展起推動作用。After that, through discussion about the landscape estimate criterion, the author summarizes it as follows : aspect relation and meaning. then, based on the landscape features of the urban viaduct rail transit along the no. 1 subway in hangzhou, the authors analyzes and summarizes the challenges that we must affront to and comment on the aspect of the styles and colors of the viaduct. at last, from a combined view with city planning, the author puts forward some advice about the improvement on the sculpt and colorific aspects of viaduct
論文首先分析了高架軌道交通的景觀特點和空間組合模式;通過討論景觀評價的標準,將景觀評價標準總結為外顯、關系、內涵三個方面;然後結合杭州市地鐵一號線工程,從外顯、關系、內涵三個方面分析高架軌道交通可能產生的景觀影響問題;最後結合城市設計的角度,對橋梁的造型和色彩等方面提出部分改進意見。Impacts on the locally rare lesser club - footed bat and short - nosed fruit bat have not been fully addressed either. wbased on the above, we find the subject eia report failing to meet the requirements of the eiao tm and respectfully request the director of environmental protection to consider disapproving the captioned eia report
基於以上各點,世界自然基金會認為上水至落馬洲支線隧道高架橋方案環境影響評估報告未能符合環境影響評估程序的技術備忘錄的要求,故懇請環境保護署署長否決該申請。Since its foundation, this institute has completed 3800 or more projects of exploration and design of which projects of priority are fengpu, lupu bridges, i, ii, iii stages of comprehensive sewage treatment, inner, middle, outer ring roadways, yan an dong lu viaduct ( east and middle sections ), main entrance roadway and graded crossing in pudong international airport, first and second stages of humin viaduct, expressways ( hujia, huqingping, hulu, jialiu, xinfengjin ) and chongming cross river projects, r3 and m7 light rail projects both situated in city proper or suburban area
自創建以來,完成了各類工程勘察設計項目3800餘項,其中已完成或正在進行的項目有:上海市奉浦大橋、盧浦大橋、污水治理一二三期工程、 (內、中、外)環線道路、延安高架道路(東、中、西段) 、浦東國際機場航站區主進場道路及航站區立交、滬閔高架道路一、二期、 (滬嘉、滬青平、滬蘆、嘉瀏、莘奉金等)高速公路、崇明越江通道、軌道交通r3線、 m7線等工程。The bank of shanghai of university of shanghai, the park of zhabei of construction bank railway hospital, the green sea new station on the ground of daning, the subway extends line ( in building ), inner loop, zhonghuan ( while planning ), overhead on the 1st, form the three - dimensional network of communication lines
上海大學上海銀行,建行鐵道醫院閘北公園,大寧綠地上海新客站,地鐵1號延伸線(在建中) 、內環、中環(規劃中) 、高架,形成立體交通網。By making references to the cases of urban elevated rail transit construction at home and abroad, this article analyses some sensitive problems which are confronted by the construction of urban elevated rail transit, from the aspects of citizens ' mental state, ecological environment, landscape, architecture and economy, and suggests the basic prerequisites for the option of urban elevated rail transit
摘要對於我國城市高架軌道交通建設所面臨的一些敏感問題,通過國內外一些城市軌道交通建設實例,從市民心理、生態環境、景觀、建築、經濟等方面進行了廣泛的探討,並提出了高架線路的基本條件。On the basics of guangzhou city urban mass transit line net development experiences, considering the research of resources sharing of guangzhou transit line net planning, this paper discusses the necessity, the main factors and principle of the route laying, makes an integrated analysis of the adaptable ranges of the ground line, the elevated line and the underground line, as well as their influences over land use, environment and engineering mat, which, as the authors hold, will provide the technique support for the route laying mode planning of the line net
摘要結合廣州市城市軌道交通線網建設規劃的經驗,在廣州市城市軌道交通線網資源共享規劃研究的基礎上,對線路敷設方式規劃的必要性、主要內容、影響因素及確定原則進行了闡述,並對地面線、高架線、地下線三種形式在適用范圍、對城市土地利用、對環境影響、工程造價等方面進行了綜合分析比較,為線網線路敷設規劃提供技術支持。As well as replacing the 45 - year - old 275 kv air insulated switchgear ( ais ) substation, the project includes reconfiguring overhead lines coming into the substation, as well as system reinforcements
除了替換已服役了45年的275千伏特的空氣絕緣裝置( ais )變電站外,該項目還包括連向該變電站的高架線,以及系統加固。Summary on installation method of working platform for construction of cast - in - place viaduct girder in urban transit system
城市軌道交通工程高架線路現澆梁施工作業平臺搭設方法總結Increasing the voltage level of electrical transmission creates considerable advantages for the environment, including lower electricity losses and the use of less land compared to traditional overhead lines
跟傳統的高架線相比,增加電力傳輸的電壓水平可以為環境帶來很大的好處,包括更低的電力損失以及佔用更少的土地。Insulators for overhead lines with a nominal voltage above 1000 v. ceramic or glass insulator units for d. c systems - definitions, test methods and acceptance criteria
標稱電壓高於1000v以上高架線的絕緣.直流裝置陶瓷或玻璃絕緣件.定義,試驗方法和驗收規則Insulators for overhead lines with a nominal voltage above 1000 v - ceramic or glass insulator units for d. c. systems - definitons, test methods and acceptance criteria
標稱電壓高於1000v以上高架線的絕緣.直流裝置陶瓷或玻璃絕緣件.定義,試驗方法和驗收規則According to its operation regulations and analyses on the troubles encountered in the process of putting op lines across the erected power lines, this paper presents solutions to manufacture the protection support of the elevated electrical wire
摘要根據高架線的操作規范要求,分析架線經過已架線時遇到的困難,提出了研製電線保護架的解決方案。Taking the example of shanghai rail - bound transit system of pearl line, the author illustrates the types and construction process of the track structures of elevated bridge, and analyzes the encountered problems in its application and possible stratigies
摘要以上海市軌道交通明珠線?例,敘述了高架線路軌道結構的類型和施工工藝,提出了在實施中所?生的問題及解決問題的對策。分享友人