高水壩 的英文怎麼說

中文拼音 [gāoshuǐ]
高水壩 英文
high water dam
  • : Ⅰ形容詞1 (從下向上距離大; 離地面遠) tall; high 2 (在一般標準或平均程度之上; 等級在上的) above...
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : 名詞1 (攔水建築物) dam2 (固堤建築物) dyke; embankment 3 [方言] (沙灘; 沙洲) sandbar; sandba...
  • 水壩 : dam; pen
  1. Fish hatcher, jelly belly and budweiser 2d fish hatchery, jelly belly, budweiser, oroville dam and sacramento 2 days

    雪鵝漫飛糖果廠啤酒廠三文魚孵卵所美國最高水壩加州首府二日游
  2. A dam constructed across a stream to raise the water level so that the overflow will have sufficient power to turn a mill wheel

    磨坊橫跨溪流建造的堤,以提位使溢滿的有足夠的動力轉動磨坊的
  3. Following a hearty breakfast, we will visit the 770 ft. oroville dam, currently the highest dam in the united states, and enjoy the great view of america s greatest reservoir. we will then take a trip to the orville dam visitor center where you will watch a fascinating documentary and learn all about the construction and maintenance of the oroville dam

    登上達770英尺的全美國最高水壩,也是全美最大之一的黃金oroville dam ,在上晨操,呼吸一下異常清新的空氣以外,還可居臨下,觀賞全美最大人造庫黃金湖及著名的羽毛河feather river 。
  4. The optimization of laying out these structures, paths of flow jets and a water cushion pool for a high arch dam is first discussed systematically in this paper

    本文首次系統地對身泄洪孔口、泄流過程以及墊塘的布置優化問題進行了討論。主要內容和成果有1
  5. To avoid manual labor of chiseling - grossness, in the area of second - stage concrete construction, permanently non - removed metal molding boards nets are used as molding boards of first - stage concrete. substitution joints of reinforcing steel bars for traditional electric welding and usage of equipments for joints of reinforcing steel bars efficiently improve strength of junctions and rate of connecting reinforcing steel bars, and safety of construction and stability of quality, and greatly reduce cost. it ' s possible that three gorges project become top - ranking project in the world by study on systems engineering of high - strength concrete construction

    混凝土縫面處理採用流沖毛技術,大大提了施工工效,減少了倉面污染;模板工程大量採用定型鋼模板施工技術,提體混凝土成型質量和工程進度;在二期混凝土施工區域,為免除人工鑿毛勞動強度,採用永久性免拆金屬模板網作為一期混凝土模板;鋼筋連接改進傳統的電焊連接方式,採用大量採用鋼筋接頭機械連接技術,有效提了接頭強度和鋼筋連接速度,施工安全性大大加強,質量穩定性有效提,經濟成本大大降低;三峽二期工程持續強度混凝土施工系統工程的研究,使三峽工程成為名符其實的「世界一流工程」成為可能;三峽二期工程混凝土溫控綜合技術的應用,有效降低了體混凝土溫度的產生;混凝土表面處理及裂縫處理技術的應用,提了建築物的整體性和耐久性。
  6. When a river valley is dammed up, the waters contained by the barrage rise to form an artificial lake

    在河谷上築起,被攔住的就會升而形成一個人工湖。
  7. Visit the famous jelly belly factory and budweiser factory, enjoy watching fish hatchery located by american river, visit oroville dam, oldest china temple and trip to sacramento old town

    出發,搭乘豪華十四客座巴士附電視,輕松悠閑地參觀糖果廠啤酒廠觀賞萬千雪鵝漫飛三文魚孵卵所美國最高水壩及加州首府。
  8. Controlled by summersville dam, the gauley is filled when the sum - mersville reservoir is lowered for storing winter melt and spring rains providing about 20 days of whitewater rafting

    受夏日蓄控制,當蓄池為了儲存融雪和春雨而放時,利河裡量滿載,提供了20天左右的白漂流。
  9. Study on plunge pool concrete lining stability for flood dischare of a high arch dam

    墊塘襯砌穩定性研究
  10. Reliability assessment of xi - luo - du underground water - power plant : the results have been used by the cheng - du surveying, design and research institute for the preliminary design ; ( 2 ) the stress and strain analysis for the xiao - guan - zi sluice and its foundation : the report has been applied for the reinforcement of the foundation ; ( 3 ) the thermal control procedure for the no. 7 - 14 power plant dam segments of the three gorge project : the research report provides the effective and efficient methods for the controlling of the temperature field in the mass concrete structure ; ( 4 ) the software system development for the long - term monitoring for dikes : the software can automatically give the results of the seepage field and the probability of soil piping of dikes and underground ; ( 5 ) reliability assessment of xiang - jia - ba underground water - power plant : the results have been used by the zhong - nan surveying, design and research institute for the preliminary design ; ( 6 ) fatigue reliability estimation of shipping berthing pillar : the results give the optimized design scheme and prediction of the structural age ; ( 7 ) 3 - d static and dynamic stochastic finite element analysis for the strength, stability and thermal control problem for xi - luo - du project

    溪洛渡電站超大型地下洞室群圍巖穩定的安全可靠性分析:被成都勘測設計研究院應用於比選報告及可行性論證中; ( 2 )小關子電站攔河閘及地基的應力應變分析:被成都勘測設計研究院應用於地基加固處理方案; ( 3 )三峽廠房7 # - 14 #段溫控並縫措施研究:為廠房段並縫方案的可行性提供了依據; ( 4 )堤防工程體系的長期監控預報預警決策系統開發:為監控、預測預報堤防滲漏管涌破壞提供分析軟體; ( 5 )向家地下洞室群圍巖穩定的安全可靠性分析:被中南勘測設計研究院應用於初步設計方案中; ( 6 )靠船墩的疲勞可靠度研究:為廣東航運規劃設計院的靠船墩優化設計和加固提供依據; ( 7 )溪洛渡基(肩)強度和穩定的三維靜動力隨機有限元分析及可靠度計算:為溪洛渡重大工程體的靜動力安全穩定性及溫控方案提供依據。
  11. The plane - wave analytic solution of the coupled fluid - air - solid system and the fem model of air cushion isolations are applied to study the influence of air cushion on earthquake response of dams. the calculations show that air isolation will reduce the hydrodynamic pressure significantly and restrain the dam vibrations during earthquakes. if the dam and reservoir is isolated by air cushions, it will decrease the hydrodynamic pressures by more than 90 % and the seismic stresses by 20 - 30 %

    將本文首次提出的體-氣體-結構系統的平面波作用理論解和三維有限元模型,應用於溪洛渡雙曲拱的抗震安全性和氣幕隔震可行性研究中,表明氣幕對具有良好的隔震性能,可降低動壓力90以上,體地震拱應力20 30 ,減震效果顯著,並使體的抗拉安全系數從0 . 93提到3 . 58 。
  12. Along with the westward exploitation putting into practice, to make use of existing natural resources, several high arch dams will be built in the southwest of china where water resource is rich

    隨著西部大開發的實施,為了充分利用現有的自然資源,我國將在力資源豐富的西南地區修建一批
  13. Since its establishment, the team has accomplished about 500 projects of lithologic reconnaissance, for example the high building of the second station of hainan military command, and many complicated projects of dam grouting and leakproof in hainan province and other countries

    建隊以來,完成了海南軍區二所等18幢層建築等巖土工程勘察項目500餘宗,參加過省內、國外(我國援建工程)的灌漿補漏的維護修復工程多宗。
  14. On the heavy silt - laden rivers, desilting at the water intake of hydropower station is a problem widely concerned not only for the large reservoir with high dam and high water head, but also for the runoff river hydropower station with lower water head

    摘要在多沙河流上,無論是大庫的頭電站,還是低頭河床式樞紐,電站進口的取排沙歷來是一個倍受關注的問題。
  15. Check dams system plays an irreplaceable role in preventing gully bed from cutting down, improving yield, accelerating the recovery of regional vegetable and adjustment of land utilization structure, improving adjustment of rural industrial framework, enhancing the efficiency of water resources, ameliorating local traffic, speeding up the development of rural science, technology and civilization

    研究結果表明,黃土原丘陵溝壑區的淤地系在防止溝道侵蝕、提糧食產量、促進植被恢復及土地利用結構調整、促進農村產業結構調整、提資源利用率、便利交通、促進農村科技文化事業的發展等方面發揮著不可替代的作用。
  16. The unavoidable flooding of villages occurred when authorities opened sluice gates at a dam on guangdong ' s hanjiang river because water there was building up to too high a level, it said

    報道稱,由於廣東韓江位過,當地政府開啟了一座的泄洪閘,從而不可避免地淹沒了這些村落。
  17. The first is the influence on flood controlling, the second is the influence on hydro power, the third is the influence on water resources, navigation, and ecological environment downstream of dan jiang kou

    丹江口庫不加調對丹江口樞紐及其下游地區主要有三個方面影響: 1對防洪調度的影響; 2對發電的影響; 3
  18. “ everyone, except perhaps some real estate developers, and builders of nuclear reactors and high dams, agree that we should build according to strict codes assuring earthquake resistance

    「所有的人,某些建築開發商,以及核反應堆和高水壩的建造商除外,都同意我們應當依照保證防震的嚴格標準進行建造。 」
  19. In order to reduce the equation complexity and adapt to complicaied noniinear ana1ysis of high arch dams with joints, finite element treatments are used with incompressibie water and massless foundation. the added mass of water and added stiffness of foundation are respectively used to substitute the influence of water and foundations. the efficiency in the computations is improved by means of static condensation

    為適應有橫縫非線性分析的復雜性,採用不可壓縮體和無質量地基假定進行有限元處理,以體附加質量和地基附加剛度近似代替體和地基的影響,通過靜凝聚提計算效率。
  20. Egyptian army officer and politician who served as prime minister ( 1954 - 1956 ) and president ( 1956 - 1958 ) of egypt and as president of the united arab republic ( 1958 - 1970 ). his nationalization of the suez canal precipitated an international crisis ( 1956 )

    納賽爾湖埃及東南部和蘇丹北部的一個湖。它是在20世紀60年代由於阿斯旺高水壩在尼羅河上的建設而形成的,湖漲淹沒了許多歷史遺跡
分享友人